• 제목/요약/키워드: IT in Construction

검색결과 21,767건 처리시간 0.055초

농업건축물 분류체계 현황 및 문제점 파악에 관한 연구 (A Study on the Current Status and the Problem of Classification System in Agricultural Facilities)

  • 최오영;김태희;김재엽;김광희;조형근
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.253-257
    • /
    • 2009
  • General technique and management technology of agriculture have development in every year to ensure the competitiveness of agriculture. Accordingly, Interested in using information systems management technology is improving. For information system, the first system of rural buildings category should be established. Classification system is set up through each specific code. and it takes advantage of the information system is to achieve the computerization of agricultural society. Therefore, in this study construction information classification system, quantity of output category, got to the standard classification system architecture, apply to agricultural buildings to review the situation and saw a problem. The result, it is the complexity and broad scope, and it is set to inappropriate setting of the Category item.

  • PDF

Investigating Main Causes for Schedule Delay in Construction Projects in Bangladesh

  • Rahman, MD. Mizanur;Lee, Young Dai;Ha, Duy Khanh
    • Journal of Construction Engineering and Project Management
    • /
    • 제4권3호
    • /
    • pp.33-46
    • /
    • 2014
  • Delay is the most common problem in the construction industry. It has many negative effects on project's success in terms of time, cost, quality, and safety. From the literature review, a total of thirty-five factors of delay were selected. These factors were divided into seven groups related to materials, manpower, owner, consultant, contractor, construction, and external problems. This study was carried out to identify the main causes of delay for a construction project through their importance level. The importance level was determined based on the frequency of occurrence and severity of impact. The structured questionnaire has distributed to the respondents who have much experience in construction management in Bangladesh. The results of analysis indicated that top five factors of construction delay according to their level of importance are: (1) price of construction materials increased very rapidly, (2) political situation (revolution/ public strikes), (3) shortages of skilled workers, (4) poor site management and supervision by contractor, (5) incompetent/ immature subcontractors. These findings of this study are expected to be significant contributions to Bangladesh construction industry in controlling current performance of project on time overrun.

PDCA Cycle적용을 통한 건설현장 품질관리에 관한 사례연구 (A Case Study on the Quality Management of Construction Site through PDCA Cycle)

  • 백인희
    • 한국건축시공학회지
    • /
    • 제8권1호
    • /
    • pp.49-56
    • /
    • 2008
  • According to the recent trends which are the diversity of customer requests and the multi-function of buildings, A construction company's business has converted from the producer-oriented approach to the consumer-oriented approach. Therefore, each construction company is continuously trying to improve the quality level as a way of corresponding to customer needs in these changing situations. The quality is one of the main management targets which judge the success of a project along with the schedule, the cost and the safety. As construction companies execute the quality management which they aimed at, it should be completed within the optimum schedule and the limit of the budget. Accordingly, the importance of the construction site management to complete a project is continuously increasing. The construction site management is the systematic method to perform the project goals such as the quality improvement, the cost saving and the safety management, which organically operate one another, by procuring the manpower, the material and the machine in the right time. Specially, as the construction industry has based on the construction site, the establish of systematic construction site management, which can effectively correspond sudden changes of the construction business environment, is essential to maximize the construction productivity. On top of that, the necessity of the quality management method is increasing to accommodate customer needs more spontaneously in the construction site. These endeavors could guarantee their competitive power.

건설자재의 공동주택 현장 적용을 위한 RFID 부착 및 인식에 관한 실험적 연구 (An Experimental Study for RFID Application of Construction Materials in an Apartment House Construction Site)

  • 주기범;한충한
    • 한국건설관리학회논문집
    • /
    • 제10권5호
    • /
    • pp.67-75
    • /
    • 2009
  • 최근 건설 산업은 정보기술을 접목하여 효율성과 경쟁력을 높이는데 많은 관심을 가지고 있다. 그 중에서도 RFID는 다양한 분야에 적용되고 있으나 건설 산업의 기본 요소 인 건설자재에는 다양한 물리적, 화학적 특성 및 사용 환경 요인 등으로 인하여 적용이 용이하지 않아 현장에 적용 사례가 많지 않은 것으로 파악되고 있다. RFID를 건설 산업에 효율적으로 적용하기 위해서는 먼저 RFID 코드발급과 이를 체계적으로 관리할 수 있는 체계가 마련되어야 하고 두 번째로 건설자재 적용을 위한 주파수, 사양, 프로토콜, 패키지방법, 인식 방법 등의 표준화연구가 필수적이다. 본 연구에서는 RFID코드발급과 관리방안을 마련하고 건설자재에 적합한 RFID Tag을 선정하기 위하여 건설자재의 물성/환경적 특성 분석, 건설자재의 현장 도입 및 관리 단위, 관리형태 등을 분석하여 건설자재별 적합한 RFID 태그를 선정하고자 진행되었다. 현장 실험은 건설현장 반입 및 관리 단계로 구분하여 실험을 실시하였다. 다양한 실험 결과는 향후 건설현장에서 RFID를 활용할 경우 시행착오를 줄일수 있는 좋은 사례가 될 수 있을 것이다.

폐기물 해상매립장의 도입방안에 관한 연구 - 장래 수도권 지역의 매립폐기물 처리를 중심으로 - (Research for Construction of Landfills at Sea Disposal of Wastes to be Reclaimed in the Metropolitan Area in the Future)

  • 정공일;김영수
    • 한국항만경제학회지
    • /
    • 제17권1호
    • /
    • pp.159-180
    • /
    • 2001
  • The quantity of waste has been increased due to the increase in population and consumption after industrialization. Accordingly it caused the urban environmental problems, the lack of landfill and the pollution around the landfill. Thus, it is necessary to research the adequate alternative in the long-term. In case of Japan, areas and quantities of landfills at sea are more great than those of landfills in land. And investigating our condition, landfills of the metropolitan area in land are to be fully filled with wastes up to 2020 and be closed. In this research, construction of landfill sites at sea is suggested as the alternative waste disposal method and it is suggested that in our country, the suitable landfill sites of the metropolitan area are the regions around Jangbong-do Island and Muei-do Island. It is expected that the best way to transport wastes is to transport through Kyungin canal from the middle collection center to the lower Han River. Rough cost for construction of landfill at sea, if it is used for 50 years, is expected to be 2 trillion won and total time to construct the landfill is expected to be 10 years. Many studies concerning to this research proposal are to be performed so that construction of landfills familiar to environment are to be accomplished.

  • PDF

최고경영자의 리더십이 건설품질경영활동과 건설품질경영성과에 관한 실증연구 (An Empirical Study on Top Management's Leadership in Construction Quality Management Activities and Construction Quality Management Performance)

  • 조진호
    • 품질경영학회지
    • /
    • 제45권3호
    • /
    • pp.403-426
    • /
    • 2017
  • Purpose:?The purpose of this study is to analyze the causal relationship between top management 's leadership and construction quality management activities that affect construction management performance based on construction quality management. Methods:?As its method, the causal relationship between the leadership of top management and the key management factors of construction quality management activities affecting management performance is analyzed by using the structural equation model. The construction companies used in the analysis sample conducted surveys on companies that are conducting ISO, KOSHA, OHSAS, DQC, and so on. Results:?It was revealed that top management's leadership has a great influence on management performance and all management factors of construction quality management activities. However, safety management does not affect the management performance of construction quality management activities. And top management's leadership on management performance are explained by the mediating effect of cost, time, quality and communication among management factors of construction quality management activities. Conclusion:?In the previous study, the quality management activities and the ISO - based integrated total quality management system (TQM) applied in the manufacturing or service industries were presented as empirical results. However, this study presents the results of different studies by presenting empirical study results by selecting time, cost, quality, safety and communication as key management factors of quality management activities of construction companies through reviewing and analyzing previous studies in construction field.

투수콘크리트 현장품질관리 지침서 개발에 관한 연구 (A Study of Developing Guides for the Construction Site Quality Control of Porous Concrete)

  • 고은정;고은주;석호중;이승혁
    • 한국건축시공학회지
    • /
    • 제9권3호
    • /
    • pp.65-71
    • /
    • 2009
  • General criteria for the quality of porous concrete have not been established yet in Korea. And yet, pavement and construction have been performed. In this paper, guidelines on the construction site quality control of porous concrete were developed in order to establish criteria for resolving the issues and problems of porous concrete, to establish methods for improving poor performance, and to manage porous concrete more systematically. In addition, a guide for the construction site quality control of porous concrete, which was appropriate for reality, was developed by researching several quality control guides and maintenance at construction sites. The guide consists of a total of nine chapters such as Application Range, Overview, the Structure of Porous Concrete, the Design of Package Thickness, Package Materials for Porous Concrete, Construction Methods, Quality Assurance and Inspections, Construction Site Quality Control, and Maintenance. It describes quality control guidelines in all steps such as methods for transporting porous concrete from the factory to the construction site, cautions for construction work at construction sites, maintenance, and management. The Guide for the Construction Site Quality Control of Porous Concrete is expected to ensure the quality of porous concrete, to reduce national costs for quality assurance, and to help ensure the health and safety of Korean people.

건설에서의 고객관계관리(CRM)의 적용방안에 관한 연구 (Implementation of Customer Relationship Management in Construction)

  • 박상혁;진상윤;김예상
    • 한국건설관리학회논문집
    • /
    • 제4권2호
    • /
    • pp.82-90
    • /
    • 2003
  • 기업은 이윤창출을 위해 사회의 변화와 고객의 요구에 따라 진화되어왔다. 건설산업 역시 시대의 변화에 따라 진화되어오면서 고객에 대한 관계를 관리하게 되었다. 하지만 현재 건설산업에서의 고객관리는 홍보나 광고에 치중된 고객관리를 하고 있어 진정한 고객관리가 이루어지지 못하고 있는 실정이다. 따라서 진정한 고객관리를 위해서는 대상에 대한 관리뿐만 아니라 그 사이에서 형성되는 관계를 관리함으로써 고객의 자료를 정보화하고 이를 활용할 수 있는 방안을 마련하는 것이 필요하다. 본 연구는 고객관계관리를 위한 적극적이고 체계적인 경영전략인 고객관계관리(Customer Relationship Management)의 적용을 위한 건설산업에서의 고객의 정의, 기존 CRM경영전략과 차이점 그리고 지향해야 할 CRM경영전략과 역할에 대한 제안을 통하여 건설산업에서의 CRM적용방안을 제시하고자 한다.

모듈러 건축의 현황과 활용에 관한 기초연구 - 사례조사 분석을 중심으로 - (A Basic Study on the Application of Modular Construction - Focused on the Analysis of Case Study -)

  • 김재영;이종국
    • 한국주거학회논문집
    • /
    • 제25권4호
    • /
    • pp.39-46
    • /
    • 2014
  • This research was for the investigation and analysis of the illustration of modular construction application which is different use by each school facility since modular construction related examples are rare in domestic situation, and it has a limitation because of its being basic research material for generating the basic form of modular construction. The research results are as followings. First, in case of school facility from illustration investigation results, module measurement of class modulation is as similar as $3m{\times}10m$, but in resident facility the planning of more flexible plane shape can be possible since modules of 6 cases are free and various, and facade form of various types can be appeared by combination of module unit. Second, as a result of the generated characteristics in compared analysis of representative examples, school facilities were highly indicated for movability and duration reduction areas, and the flexibility, economic efficiency, and environment-friendliness was indicated low relatively. Third, the basic planning types of modular construction can be largely divided into layered type, horizontal (straightway) type, and compound type. The layered type has a short traffic line and facility system and is appropriate for the low-rise form unless separate construction method is used since it is susceptible to load. The horizontal type is advantageous for securing an opening since it has wide extent in light but has a long traffic line and facility system. Finally, the compound type can be possible for planning of various forms but needs the combination of various unit modules and traffic line and facility plan for it can be difficult.

MODELING ACCURATE INTEREST IN CASH FLOWS OF CONSTRUCTION PROJECTS TOWARD IMPROVED FORECASTING OF COST OF CAPITAL

  • Gunnar Lucko;Richard C. Thompson, Jr.
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.467-474
    • /
    • 2013
  • Construction contactors must continuously seek to improve their cash flows, which reside at the heart of their financial success. They require careful planning, analysis, and optimization to avoid the risk of bankruptcy, remain profitable, and secure long-term growth. Sources of cash include bank loans and retained earnings, which are conceptually similar in that they both incur a cost of capital. Financial management therefore requires accurate yet customizable modeling capabilities that can quantify all expenses, including said cost of capital. However, currently existing cash flow models in construction engineering and management have strongly simplified the manner in which interest is assessed, which may even lead to overstating it at a disadvantage to contractors. The variable nature of cash balances, especially in the early phases of construction projects, contribute to this challenging issue. This research therefore extends a new cash flow model with an accurate interest calculation. It utilizes singularity functions, so called because of their ability to flexibly model changes across any number of different ranges. The interest function is continuous for activity costs of any duration and allows the realistic case that activities may begin between integer time periods, which are often calendar months. Such fractional interest calculation has hitherto been lacking from the literature. It also provides insights into the self-referential behavior of compound interest for variable cash balances. The contribution of this study is twofold; augmenting the corpus of financial analysis theory with a new interest formula, whose strengths include its generic nature and that it can be evaluated at any fractional value of time, and providing construction managers with a tool to help improve and fine-tune the financial performance of their projects.

  • PDF