• Title/Summary/Keyword: IT in Construction

Search Result 21,564, Processing Time 0.046 seconds

The Study on the Developing Process of BIM Modeling for Urban-life-housing Based on Unit Modular (유닛모듈러 기반 도시형 생활주택의 BIM 모델링 프로세스 개발 연구)

  • Lee, Chang-Jae;Lim, Seok-Ho
    • KIEAE Journal
    • /
    • v.12 no.6
    • /
    • pp.77-84
    • /
    • 2012
  • The current architectural design of unit modular has been based on 2D of CAD program, so unit modular character which needs unit information management, as a dried-member system, has no effect on design process. The purpose of this study is We have developed a suitable BIM design process, according to various works of construction, then tried to contribute to supply and activation of the urban-life-housing based on unit modular. The BIM modeling process based on unit modular has been in order of unit combination with preparing manual classification, and, it has been constructed, at construction site, from housing foundation to roof finish by Bottom-up method. At a manufacturing factory, it has been produced in order of 1) grouping materials and parts, 2) fabricating unit boxes, and 3) interference examination of unit boxes, and each order has been classified as housing structure, architecture, plumbing process separately. At a construction site, the fabrication has been done in order of, like as a real housing construction scenario, 1) RC foundation work 2) unit module job-site-fabrication work, 3) roof truss work, 4) plumbing and HVAC work, and 5) housing interior finish work. After modeling process, the interference examination on each work of construction has finally completed modeling. The Unit modular utilizing BIM modeling can make easy housing maintenance through systematic control with preparing manual of unit module information, and securing accurate and speedy construction information. And it will promote design credibility and create maximum effect of unit modular construction method, such as construction period reduction and upgrade of construction quality, etc., through the computer simulation as real as construction environment in cyber space, and with the interfering examination.

ON THE C1-CONSTRUCTION

  • Song, Youngkwon
    • Korean Journal of Mathematics
    • /
    • v.8 no.2
    • /
    • pp.193-198
    • /
    • 2000
  • In [4], it is proved that the algebra ($S,k^{14}$) is not a $C_1$- construction if the field is the real number field. In this paper, we will introduce a different proof of the fact that the algebra ($S,k^{14}$) is not a $C_1$-construction.

  • PDF

PROCESS RESEARCH FOR DEVELOPMENT OF STRUCTURAL COST ESTIMATING MODEL BASED QUANTITY - FOCUSED ON PUBLIC OFFICE BUILDING PROJECT -

  • Soo-Min Kim;Jung-Kyu Seo;Sung-Uk Kim;Chang-Hyun Shin;Yung-Jin Kim;Jae-Youl Chun
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1170-1175
    • /
    • 2009
  • When managers estimate exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But, the current of public construction cost estimation and management is concentrated almost after detailed design phase. Therefore, construction cost management in design development phase to generally use approximate estimating is not correct. Also, the existing construction cost used the method that estimated by gross floor area-based cost estimates at design development phase. So, it is difficult to show the specific amount of materials and basis about the estimated cost of the construction. This study derived problems and limits of construction management at design development phase in case of public office building project through review of literature and current survey, and suggested estimating process model process of structural construction cost go improve these matters.

  • PDF

Comparative Analysis of the Environmental Management Cost in Building Construction Sites (건축공사 환경관리비 운영체계 비교 분석)

  • Koo, Jakon
    • KIEAE Journal
    • /
    • v.10 no.4
    • /
    • pp.111-116
    • /
    • 2010
  • The environmental management is essential for construction projects. The environmental management cost for construction projects is used for various purposes to control the environmental pollution and treat the wastes generated from the construction sites. Six construction cases were analyzed to compare the environmental management cost. The proportion of environmental management cost for total construction budget should be higher than 0.70% in redevelopment projects and 0.30% in newly constructed buildings, respectively, but every six construction cases did not meet the legal requirement. Redevelopment projects expanded more environmental management cost than the newly constructed projects especially in noise control and wastes treatment. In case of apartment construction projects, the proportion of environmental management cost of redevelopment buildings is 2.4 times higher than the newly constructed buildings, but in all cases, paid more attention to the noise and waste controlling measures than the wastewater treatment. It is needed to ensure the cost-effectiveness of environmental management for achieving the eco-friendly construction sites.

Applicability Analysis of Photovoltaic System in the Construction Phase of High-rise Buildings (초고층 건축물 시공단계를 위한 태양광시스템의 적용성 분석)

  • Kang, Go-Une;Kim, Tae-Hoon;Cho, Hun-Hee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.21-22
    • /
    • 2011
  • Recently, the development of alternative energy technologies has been actively conducted for energy conservation and CO2 emission reduction. Especially, photovoltaic energy has been applied practically in construction industry, and research on the building-integrated photovoltaic system (BIPV) that can replace fossil fuel for building operation and maintenance has been performed. However, this vibrant research has been limited to the use phase of buildings, and few studies have been carried out in the construction phase. The construction duration and the scale of the sites have increased along with the high-rise trend of buildings, and it is forecasted that the temporary electricity use and CO2 emission in the construction phase is increasing. In sight of these developments, this research analyzed applicability of the photovoltaic system for the construction phase that can replace the electricity used on the high-rise construction site.

  • PDF

Setting the New Trends for BIM in Construction: Productivity, Performance, Competitiveness, and Innovation

  • Wang, Xiangyu;Moon, Sungkon
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.21-22
    • /
    • 2015
  • Productivity has been a wide-ranging challenge for the construction industry, both in Australia and globally. Particularly in Western Australia's construction and resources sectors, continuously low productivity will potentially discourage future investments. The emergence of the global marketplace necessitates that the supply chain needs to focus on the concept of the holistic efficiency. The isolated geographical position of Australia only exacerbates this phenomenon. In recent years, Building Information Modelling (BIM) has been suggested as an efficient way to help productivity improve and information management throughout supply chains. This keynote talk will focus on discussing ways of implementing BIM to enhance site productivity focusing on Western Australia's construction projects. It will show new trends of its applications to accomplish an innovative way in construction project management. The talk will also give an insightful summary of integrated methods with state-of-the-art technologies backboned by the BIM cases from construction and oil and gas industry projects.

  • PDF

An Adaptive and Real-Time System for the Analysis and Design of Underground Constructions

  • Gutierrez, Marte
    • Geotechnical Engineering
    • /
    • v.26 no.9
    • /
    • pp.33-47
    • /
    • 2010
  • Underground constructions continue to provide challenges to Geotechnical Engineers yet they pose the best opportunities for development and deployment of advance technologies for analysis, design and construction. The reason for this is that, by virtue of the nature of underground constructions, more data and information on ground characteristics and response become available as the construction progresses. However, due to several barriers, these data and information are rarely, if ever, utilized to modify and improve project design and construction during the construction stage. To enable the use of evolving realtime data and information, and adaptively modify and improve design and construction, the paper presents an analysis and design system, called AMADEUS, for underground projects. AMADEUS stands for Adaptive, real-time and geologic Mapping, Analysis and Design of Underground Space. AMADEUS relies on recent advances in IT (Information Technology), particularly in digital imaging, data management, visualization and computation to significantly improve analysis, design and construction of underground projects. Using IT and remote sensors, real-time data on geology and excavation response are gathered during the construction using non-intrusive techniques which do not require expensive and time-consuming monitoring. The real-time data are then used to update geological and geomechanical models of the excavation, and to determine the optimal, construction sequences and stages, and structural support. Virtual environment (VE) systems are employed to allow virtual walk-throughs inside an excavation, observe geologic conditions, perform virtual construction operations, and investigate stability of the excavation via computer simulation to steer the next stages of construction.

  • PDF

Construction 3D printing SoP Design and Verification Using Material Extrusion Additive Manufacturing Technology (압출식 적층제조 기술을 적용한 건축 3D 프린팅 운영절차의 설계 및 검증)

  • Park, Jinsu;Kim, kyung taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.1
    • /
    • pp.106-112
    • /
    • 2022
  • Additive manufacturing (AM, also known as 3D printing) technology gets attention for various effects in the construction industry. It reveals abilities of process automation, high traceability of resource management, construction period precision improvement, and worker safety. However, unlike the existing construction technology, the development of AM construction process causes trial errors and unpredictable accidents. In the present study, the construction AM process is designed for on-site construction, and it performs with empirical tests. Also, we analyzed the causes of qualitative experimental results.

A study on effects of resting facility on the Reduction of Disasters in Construction Projects (건설 사업장 휴게시설이 재해감소에 미치는 영향에 관한 연구)

  • Kim, Jong-Min;Kang, Kyung-sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.4
    • /
    • pp.141-148
    • /
    • 2017
  • This researcher selected basic variable to investigate the effective relations of establishment and management of resting facility on reduction of constructional disasters and safety accidents and improvement of working efficiency for construction workers. Based on the measured variables, this researcher investigated phenomenon, recognition and satisfaction for using and demanding resting facility by long-term construction in construction site for workers of huge construction site in Seoul, conducted survey of total 219 questionnaires so as to grasp implications of workers' resting facility demanded in long-term huge construction site and effects on reduction of disasters and conducted structural equation analysis. As a result, resting faciity factor, management factor, and hygienic service factor were significant and resting and food factors were not significant. Therefore, it's expected to reduce personal disaster by improving quality of constructional resting facility, hygienic service, and resting facility management and especially, resting facility management factor makes lots of effects on prevention of personal disasters, so it was a strongly main factor. By suggesting the guideline of establishment and management service of proper resting facility through this research, positive recognition and constructional disaster reduction can be expected in construction site.

A Study on the construction quality infra and it's core confidency priority for enhancing construction certification system (건설공사 품질인증시스템 향상을 위한 품질인프라 및 핵심역량 도출에 관한 연구)

  • Lee, Kab-Soon;Bae, Young-Ju
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.4
    • /
    • pp.189-208
    • /
    • 2017
  • This study is for figuring out major components of construction quality infrastructure and suggesting improvement plan by benchmarking global best practice model and analyzing gap between the model and sample practice. Based on improvement plan, researcher could derive major characters and components of construction quality infrastructure, and also about the priority among core competency components of construction quality experts. The result showed that the 'human resource' was ranked the best priority followed by 'method' 'environment', 'equipment' among major characters and components of construction quality infrastructure. Also, for core competency components of construction quality experts, 'number of years in work places' was the best priority, and the 'professional knowledge on engineering' was another priority ranked. Far from general perception on competency components, 'academic education' ranked the last. It may allude that the current education system in this country is not effective in developing competency of quality engineers. In summary, this study shows professionalism of quality engineer is the most important thing in all the components.