철도사업의 종합사업관리 국제경쟁력 강화방안에 대한 연구 (A Study on the Improvement of Project Management System for International Competitive Power and Global Business Strategy of Rail Project)

  • 이영주;장성용
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.1595-1600
    • /
    • 2004
  • High speed railroad project management has been almost completed by starting operation of Seoul-Busan high speed railroad with the exception of a few constructing blocks currently in April, 2004. After Korea Rail Network Authority was established in 2004, it needs to develop new project management system for both conventional railroad construction and high speed railroad construction for domestic railroad projects, while it plans to invest in overseas railroad project for logistics innovation and improvement in passenger transport services on a large scale. Therefore this paper provides the method that we can adapt the project management system for high speed railroad containing experiences and know-how from construction of high speed railroad for both conventional railroad construction and high speed railroad construction or improve project management system for high speed railroad to use it as project management system for overseas railroad projects.

  • PDF

지하 구조물에 적용되는 역타설용 방수시트재의 성능 평가에 관한 연구 (A study on waterproofing method using waterproofing sheet Top-Down method in underground structure)

  • 송제영;곽규성;김정일;오상근
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2005년도 봄학술 발표회 논문집(II)
    • /
    • pp.301-304
    • /
    • 2005
  • The waterproofing in slab and wall of underground structure, have a couple of construction methods which are inside waterproofing methods for inner surface, and outside waterproofing methods for out wall and slab surface waterproofing. In resent years, however, it has been adapted the inside waterproofing construction method, as increasing of construction expenses cost and low workability and technology, nevertheless, outside waterproofing has set a most high value construction method. In inside waterproofing construction method, it is difficult to repair and assure durability and safety for concrete which has direct water-press. So, It is necessary for adopt the outside waterproofing method.

  • PDF

공공건축물 실적자료 분석에 따른 중위수를 활용한 총공사비의 적정보정율 추정방법 (Presumption Method for Optimum Correction Rate of Total Construction Cost Using the Median based on Historical Data Analysis in Public Office Buildings)

  • 임진호;박준모;김옥규
    • 한국건축시공학회지
    • /
    • 제14권5호
    • /
    • pp.415-422
    • /
    • 2014
  • 본 연구는 공공건축물의 실적공사비 분석을 통해 총공사비에 대한 적정보정율을 기초자료로 제시하고자 한다. 이에 대해 조달청에서 발주한 2009~2011년에 준공된 53개 프로젝트를 연구 대상으로 하였다. 공사비 분석은 주요 공정인 건축, 기계, 전기, 통신, 부대시설에 대하여 빈도론적 관점에서 중위수를 활용한 절대오차율을 기반으로 총공사비에 대해 비교 분석하였다. 이를 통해 적합회귀모형을 선정하고 보정율을 책정하였다.

현장관리 업무체계의 실태조사 연구 - 준공 후 업무를 중심으로 - (A Field Study on the Preference in the Construction Management - Focused after construction Stage -)

  • 이두진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2003년도 학술.기술논문 발표회
    • /
    • pp.85-89
    • /
    • 2003
  • With the social demands for tall building, the level of techniques for construction become high and there are various building materials. Also, the construction system become very complicated with the increase of worker. In spite of above facts, the method of construction management depends on the experimental capacity of a construction manager, and there are many unreasonable elements. These elements prevent well-going in construction process. To solve this problem, it is necessary to make a new system of construction management which is adequate for the condition of company and the contents of construction. In this study, the characteristic of production system and the present condition of construction management were investigated with the help of survey. Thus, the new method of construction management which can clear the previous problems was proposed.

  • PDF

현장관리 업무체계의 실태조사 연구 - 준공 후 업무를 중심으로 - (A Field Study on the Preference in the Construction Management - Focused after construction Stage -)

  • 이두진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2003년도 학술.기술논문발표회
    • /
    • pp.85-89
    • /
    • 2003
  • With the social demands for tall building, the level of techniques for construction become high and there are various building materials. Also, the construction system become very complicated with the increase of worker. In spite of above facts, the method of construction management depends on the experimental capacity of a construction manager, and there are many unreasonable elements. These elements prevent well-going in construction process. To solve this problem, it is necessary to make a new system of construction management which is adequate for the condition of company and the contents of construction. In this study, the characteristic of production system and the present condition of construction management were investigated with the help of survey. Thus, the new method of construction management which can clear the previous problems was proposed.

  • PDF

공동주택 토목공사의 책임기술자와 품질의 상관관계 분석 (Correlation analysis of the quality and civil construction engineer in apartment house)

  • 정상훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 추계 학술논문 발표대회
    • /
    • pp.70-71
    • /
    • 2015
  • Construction period is longer than the non-disclosure in civil construction of apartment house. And this process is intensive at the beginning and end of construction. Because this project management expertise is required. Nevertheless, subsidiary work(Working avoid a tendency of advanced technician, Frequent turnover and employment contracts, etc.) management attention of construction is at a lower level. Because of, there are the bad factors(trial and error, finish degradation, etc.). Therefore, this study analyzed Hindrance Factor of quality control on apartment complex construction work and presented importance of civil construction engineer's role. Also, forms of civil construction engineer, Performance experience and technical Strength of apartment complex construction was investigated for the construction. To this end, It analyzes the relationship between forms of civil construction engineer, Performance experience and technical Strength of apartment complex construction and Construction of evaluation as required by Construction Technology Management Act.

  • PDF

건설경기와 건설업체 부실화 간의 관계성 분석 (Analysis of Correlation between Construction Business and Insolvency of Construction Company)

  • 서정범;이상효;김재준
    • 한국건설관리학회논문집
    • /
    • 제14권3호
    • /
    • pp.3-11
    • /
    • 2013
  • 건설경기의 악화에 따른 건설업체 경영상태의 악화는 단순히 건설업체만의 문제가 아니다. 즉, 건설산업은 건설업체뿐만 아니라 공공기관, 금융기관, 가계 등 다양한 시장참여자가 공동으로 관계하고 있기 때문에 심각한 경제적 손실을 야기할 수 있다. 이러한 관점에서 건설경기 변동과 건설업체 부실화 변화 과정 사이의 관계를 살펴보는 것은 중요한 의미를 지니게 된다. 이에 따라 본 논문에서는 건설업체 부실화 정도와 건설경기 간의 관계성을 실증분석하는 것을 목적으로 한다. 본 논문에서는 먼저 KMV 모형을 활용하여 예상부도확률을 측정하고 이를 건설업체 부실화의 대리변수로 활용하였다. 건설경기 변수들의 경우 공사종류별로 세분화하였다. 즉 주거용, 비주거용, 토목용 건설투자액을 공종별 건설경기를 대리하는 변수로 활용하였다. 이러한 변수들을 활용하여 본 논문에서는 벡터오차수정모형(VECM)을 활용하였다. 분석결과를 통해 살펴본 바, 건설업체들은 먼저 사업포트폴리오를 다양화할 필요가 있을 것으로 판단된다. 또한 건설업체의 경영상태가 악화되게 되면 시장상황이 좋아지더라도 이를 원래 상태로 회복하는 것은 상당히 힘든 것으로 판단된다. 즉 건설업체의 경영상태가 양호해지기 위해서는 시장상황즉, 외부환경의 변화도 매우 중요하겠지만 그보다 더 기업내부적인 역량강화가 절실할 것으로 판단된다.

VIRTUAL CONSTRUCTION OF TRANSFER FLOORS IN REINFORCED CONCRETE BUILDING USING BIM

  • Kwangho So;Bohwan Oh;Yongjik Lee;Hyungeun Lee;Taehun Ha
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.12-16
    • /
    • 2011
  • Building Information Modeling (BIM) is being widely spread in AEC industry worldwide and also in South Korea. Although the creation of digital model is better to be started at design stage, it can also improve the productivity of construction by simulating the actual construction process and environment. This paper presents application of BIM-based simulations related with design changes to transfer floors in 58-storey reinforced concrete office building. Transfer floor is not only a structurally important part of the building but also a challenging part of the actual construction in terms of sequence and period due to the complexity of the work. Preconstruction of rebar, mechanical, and plumbing is performed to review the construction drawings and to perform clash detection. Each item of application is evaluated for its effectiveness on actual construction and for the development potential.

  • PDF

시공단계에서의 BIM 도입 저해요인에 관한 기초연구 (A Study on Obstacle Reasons of BIM in Construction Phase)

  • 김지선;유승규;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.61-62
    • /
    • 2011
  • Construction plans for large construction projects are problems such as Incompatibility of information, omissions due to technical limitations of 2D CAD. In addition to, Plan established for the validation such as process, cost and construction technology plan is difficult. By occurring Frequent changes in the course of business, Inefficiency of management has occurred. In the construction process, there is occurred costs and construction delays due to reconstruction or communication error. In this study, It was deemed BIM will complement Existing 2D CAD problem. And, BIM case studies in the construction phase of domestic construction were analyzed, How to apply BIM in the construction phase investigated.

  • PDF

호주 어워드 시스템과 국내 건설공사 시중노임단가 체계 비교연구 (Comparative Study on Awards System of Australia and Wage Rate in Construction of Korea)

  • 임채연;백승호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.70-71
    • /
    • 2018
  • The labor cost on construction project of Korea is calculated based on the Wage Rate in Construction of Korea which is published by Construction Association of Korea. The Wage Rate in Construction of Korea does not have any variation on the wage following skill level of labor although it has 123 work categories. In addition, the classification on skill level and career of construction labor in Korea does not defined. Therefore, to establish the concept of the classification on skill level and career of construction labor, this study aim to compare the difference between Wage Rate in Construction of Korea with Award system which present grade on skilled labor.

  • PDF