International conference on construction engineering and project management
/
2015.10a
/
pp.714-715
/
2015
Drill and blast method has been most widely used in tunnel excavation, after NATM (New Austrian Tunneling Method) was introduced in 1983. The NATM method utilized mass of shotcrete to secure the bearing capacity of tunnels. Overbreak defined how much larger the actual excavation was than the planned. When it became larger, more shotcrete was required to fill in it Here, payline fixed allowable overbreak, referring to payable amounts of shotcrete. Since owner was not responsible for shotcrete exceeding payline, it was important to properly establish the standards for payline. Although the standards were provided in 'Poom-sam'(standardized quantity per unit), they did not properly reflect the actual conditions for excavation. Thus, this study reviewed existing domestic and foreign standards for overbreak, and estimated overbreak for each type of support using survey data, and finally provided the improvements on the current standards.
Most VE operation related to construction project is progressed in stage of planing or design phase, especially in case of domestic. It is encouraging fact and if you have VE process in stage of planning and design, you'll have experience a reduction of about 70% of total saving cost in which total construction process may occurred. However, recently the work of construction in overseas increase and almost is only construction-work, except planning and design process. As this reason, VE process for construction-work phase only is demanded in high necessity. VE in construction phase comes to accomplish intensively in the part which the design change does not follow, through know-how, equipment operating method and method of temporary-structure erection at the established construction-site learned, builders will be the possibility of reduction from 3% to 10% in constructive expense. This paper describes VE performing example in OO company's construction-work phase, and propose the methodology of VE performance in the phase of construction. And also it is aimed to extending VE applications into the overseas construction enterprise.
Journal of Korean Society of Industrial and Systems Engineering
/
v.26
no.3
/
pp.24-30
/
2003
As domestic buildings have been large-scaled, diversified and high-rise, there have been a consistent demand for design, development of construction technology and accident prevention activity as well as quality enhancement. In spite of governmental and related institutions' efforts for reducing national losses which come from numerous accidents, there have been endless small and large accidents on the construction site and thus, it is urgent to conduct empirical researches in this area. Currently safety supervision system in construction industry has enforced harm and danger prevention planning system, however it merely stick to other existing materials. In addition, it is difficult to put it into practice in that it requires bearing too much burden to draw out the planning itself in a case of large construction work. Consequently in this paper we select evaluation criteria by construction progress, classify into several categories, and regard potential danger which often occurs, as a evaluation criterion. Further step is to allow workers or collaborated companies to express their expert opinions or experiences and to encourage quality and process control and autonomous safety control by applying PSM(Process Safety Management) method using AHP(Analytic Hierarchy Process) and to development of PSM evaluation method in the construction. The reason why PSM method should be quantitative and substantial progress is because it contributes Korean constructing companies to enhancing their safety control ability and to taking an equal stance just like developed countries, thereby strengthening their competitive edges. Boost of safety control system by PSM method could make an enormous contribution to preventing construction accidents on the site by establishing and securing an autonomous safety control system.
Proceedings of the Korean Geotechical Society Conference
/
2005.03a
/
pp.781-787
/
2005
Recently, disaster that is earthquake, sever rainstorm and the tidal wave were increased by abnormal weather. These influence which is the slope stability of the completed slope as well as under construction slope is affected by disaster. But the management standard for the construction slope is incomplete. Also, the standard connected with construction slope is not integrated with the important public paper organic enemy and it is duplicated and the standards which conflict are being scattered. In this research which it sees consequently the inside and outside of the country construction slope the maintenance civil official relation law and standard investigation it leads and the problem point and a improvement program of management criterion and to sleep the construction slope which is suitable in domestic actuality it prepares and propose.
This study is to investigate the degree of field awareness of how each provision of the Serious Disaster Punishment Act will affect accident prevention. As a result of conducting a survey of construction site workers, it was analyzed that construction site workers had a low sense of safety and did not voluntarily engage in safety activities. And it can be seen that they are taking a very passive position that it is efficient to implement safety under the supervision of the supervisor. Workers who need voluntary construction site safety activities are most aware of the situation at the site, but the problem was pointed out as "lack of procedures for listening to opinions and preparing improvement measures" for these problems. Future research is needed to see if this is a problem for individual workers or for those in charge of safety and health who do not correct it even though active opinions have been submitted.
Kim, Seon-Hyung;Choi, Jae-Hwi;Kim, Sun-Kuk;Lee, Dong-Hoon
Proceedings of the Korean Institute of Building Construction Conference
/
2010.05a
/
pp.9-12
/
2010
Conventional apartment building projects have favored wall slab structure for the ease of construction and economic viability. However, wall slab structure, consisting of bearing walls, makes remodeling a difficult challenge. In addition, as the amendment to the Building Act in November, 2005 incentivized easy-to-remodel Rahmen structure design for apartment building in terms of floor area ratio and the number of stories, were are seeing more use of PC construct method in apartment building projects gradually. However, PC construction method requires complex connections between beams and columns, making it difficult to install and remove formwork. Furthermore, it is not possible to reuse forms after removal, generating lots of construction wastes, and it is necessary to install new forms again when the size of connection changes in line with modification of column cross-section. Researchers in Korea and elsewhere in the world have focused on structural performance of connection in PC construction method, with little attention to alternative approaches to improving connection forms for PC construction method. Accordingly, this research aims to study an approach to improving connection forms for PC construction method.
Park, Yang-Heum;Nam, Dong-Hun;Kim, Byung-Soo;Park, Jungjoon;Kim, Sungjin
Proceedings of the Korean Institute of Building Construction Conference
/
2023.11a
/
pp.53-54
/
2023
Because irregular shaped buildings are designed with various three-dimensional curves, the difficulty of design and construction is very high, and more construction drawings are needed to reduce construction errors. General 2D drawings may have limitations in conveying the information necessary for construction. By utilizing BIM, it is possible to three-dimensionally design parts that are not expressed on 2D drawings and additional structurall components required for the construction of the curved exterior finishing materials. This study examines the necessity of BIM at the construction stage, its performance through it, and how it can be linked to smart construction technology through construction BIM being applied to the new construction site of Sejong-Pocheon Line Cheoin Rest Area.
Proceedings of the Korean Institute of Building Construction Conference
/
2015.11a
/
pp.198-199
/
2015
In Korea, it raised the need of the specification of unit modular construction, because there are no standard or manual. And it is urgent that the specification of unit modular construction is needed to develop in the domestic. Therefore, this study aims to propose the manual framework of the construction method. In the future, this framework will be based on the development of the manual on the unit modular construction method.
Proceedings of the Korean Institute of Building Construction Conference
/
2017.05a
/
pp.33-34
/
2017
The purpose of this case study is to reduce the flaw and reconstruction occur at the level of construction by determining the propriety of estimate and error on a drawing and specification at working design level through case studies of BIM application at the level of design review. As a preliminary to apply BIM technology, it is needed to review the drawing, and then it is required to define BIM range by selecting the section in which construction error occurs frequently except for the type of part that is constructed repeatedly. At the execution level, the drawing is reviewed vertically, horizontally and spatially by proceeding structure and finish modeling on the defined BIM range, and also the propriety of estimate and error on the drawing and specification are examined. We aim to raise the completion rate, improve quality of construction, reduce the cost for construction and shorten period of construction by preparing for the error on the drawing and specification in advance through this review procedures.
Proceedings of the Korean Institute of Building Construction Conference
/
2019.05a
/
pp.159-160
/
2019
Reinforced concrete construction is one of the labor intensive construction projects and its productivity is very low. It is necessary to increase the productivity of rebar construction for improving the productivity of construction work. Therefore, in this study, the rebar drawings of apartment buildings are analyzed to prefabricate wall rebar unit shaped mesh in the factory and installing it on site. If the proposed wall rebar unit is applied to apartment construction working time of wall rebar can be reduced by 50% or more.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.