A study of the factors affecting delay in apartment projects in Vietnam

  • Luu, Truong-Van;Kim, Soo-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.718-721
    • /
    • 2007
  • Construction schedule plays a key role in project management due to its influence on the project success. Thus, it is important to identify factors affecting construction delay. The major objective of this study is to identify and evaluate factors affecting construction delay in apartment projects in Vietnam. The findings confirmed that financial difficulties of owners and contractors, contractors without adequate experience, non-available materials on time, slow site clearance, inappropriate construction methods, defective works and reworks, and lack of capable owners/project managers are the major causes of delay in apartment projects.

  • PDF

Relationship between Types of IT Investment Decision and Organizational Performance : Focus on Public Sector (정보화 투자의사결정 유형과 조직성과의 관계에 관한 연구 : 공공기관을 중심으로)

  • Hong, Seung-Tae;Min, Daihwan;Kim, Hyoung-Jin
    • Journal of Information Technology Services
    • /
    • v.12 no.3
    • /
    • pp.289-309
    • /
    • 2013
  • Korea has been ranked at the top consecutively in UN e-Government Survey. This fact reflects consistent efforts by public institutes in Korea. However, there were some duplicate efforts and inefficiency in the investment into IS(information systems). In other words, management and decision making on e-government have yet to improved. Accordingly, governmental institutes have long been promoting policies for EA in order to carry out and manage effectively IT projects including the e-Government projects. EA is being regarded as a means to facilitate IT Governance for systematic management of IT projects, A major objective is to firmly establish the decision making process for IS investment through EA, since the each institute is a large organization with so complicated and specialized demand for IS. As a result, systematic decision making is becoming quite difficult. Thus, this study attempts to identify different types of IT investment decision making and to figure out the relationship between the decision types and the organizational performance of public institutes where EA was implemented.

A Conceptual Framework to Study the Effectiveness of Interface Management in Construction Projects

  • KEERTHANAA, K.;SHANMUGAPRIYA, S.
    • Journal of Construction Engineering and Project Management
    • /
    • v.9 no.3
    • /
    • pp.1-21
    • /
    • 2019
  • The management of mega construction projects which incorporate a large number of stakeholders, technologies, data, work culture etc., is cumbersome. The experts in the construction arena advocate that interface management serves as a precise tool in resolving these conflict points due to the intricate nature of the construction projects. Interface management is a current trending management practice in the construction industry which is also a beneficiary to mega/fast track projects in enhancing the project performance. The main objective of this study is to validate a model for assessing the relationships among interface management, IT applications, project performance & project benefits. The mediating effect of interface management in relationship between project performance & interfacial factors was also investigated. The research model was validated using PLS-SEM (Partial Least Square-Structural Equation Modelling) approach. Data were collected from clients, contractors, consultants in large scale projects through questionnaire survey and smart-PLS software was used to analyse the conceptual model. The research model comprises eleven hypothesis and the significance of these hypothesis were tested using T- statistics values. The research implies that people/participants factor is greatly influenced by interface management with the path coefficient of 0.608 and also enhancement of project's schedule performance due to the interface management is strongly appealing (Path coefficient = 0.711). The results also reveal IT application is significantly associated with interface management practice (Path coefficient =0.723) and also the effect of IT application on project performance (schedule, cost, quality & safety) is successfully mediated through interface management practice. The practical application of this validated model was done through case study. The case study aims at measuring the impact of interface management on interfacial factors and role of interface management in improving the project performance in the construction organisations.

The Carbon Stock Change of Vegetation and Soil in the Forest Due to Forestry Projects (산림 사업에 의한 산림 식생 및 토양 탄소 변화)

  • Heon Mo Jeong;Inyoung Jang;Sanghak Han;Soyeon Cho;Chul-Hyun Choi;Yeon Ji Lee;Sung-Ryong Kang
    • Korean Journal of Ecology and Environment
    • /
    • v.56 no.4
    • /
    • pp.330-338
    • /
    • 2023
  • To investigate the impact of forestry projects on the carbon stocks of forests, we estimated the carbon stock change of above-ground and soil before and after forestry projects using forest type maps, forestry project information, and soil information. First, we selected six map sheet with large areas and declining age class based on forest type map information. Then, we collected data such as forest type maps, growth coefficients, soil organic matter content, and soil bulk density of the estimated areas to calculate forest carbon storage. As a result, forest carbon stocks decreased by about 34.1~70.0% after forestry projects at all sites. In addition, compared to reference studies, domestic forest soils store less carbon than the above-ground, so it is judged that domestic forest soils have great potential to store more carbon and strategies to increase carbon storage are needed. It was estimated that the amount of carbon stored before forestry projects is about 1.5 times more than after forestry projects. The study estimated that it takes about 27 years for forests to recover to their pre-thinning carbon stocks following forestry projects. Since it takes a long time for forests to recover to their original carbon stocks once their carbon stocks are reduced by physical damage, it is necessary to plan to preserve them as much as possible, especially for highly conservative forests, so that they can maintain their carbon storage function.

A Study on Development of Standard Technology for Post-Evaluation of Stream Project I (하천사업의 표준화된 사후 평가 기법 개발 연구 I)

  • Jang, Chorok;Song, Juil;Jang, Moon Yup;Kim, Han Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.2
    • /
    • pp.542-550
    • /
    • 2020
  • A stream serve the functions of different water utilization, flood control, and the environment, and contributes to the development of national life and culture. On the other hand, it is difficult to efficiently evaluate various projects, such as effectiveness verification and comparison between projects, because the evaluation procedures and evaluation techniques of projects are not uniform and different for each institution. Therefore, a standardization technology was developed for a post-assessment of stream projects that can recognize stream problems and comprehensively evaluate stream-related projects. To this end, various projects, such as project evaluation techniques, national R&D projects, and social welfare projects, were compared and analyzed, and the standardization stages of the project were first suggested. In addition, based on the standardization stage, the evaluation indices for each stage were derived to develop an evaluation table that can evaluate stream-related projects comprehensively. Finally, it is possible to prevent the repeated use of failure factors in the planned projects.

A Study on the Improvement of Efficient Execution System for Cadastral Resurvey Project (지적재조사사업의 효율적인 추진체계 개선에 관한 연구)

  • Kim, Jae Myeong;Choi, Yun Soo;Yoon, Ha Su;Kim, Young Dan
    • Spatial Information Research
    • /
    • v.21 no.4
    • /
    • pp.47-62
    • /
    • 2013
  • Recently there are growing arguments about the needs to improve Cadastral Resurvey Projects more efficiently and rationally since the projects have realistically started. This study aims to analysis some problems of the projects and finds out the solutions. With this purpose, we have surveyed some literatures related to the demonstration projects, and then have examined some similar domestic urban development projects and international Cadastral Resurvey Projects in order to apply their appropriate tools to the present or future projects. Generally the execution process of Cadastral Resurvey Projects has four steps and this study arranges the main problems in each steps. In the result it suggests that some improvements should change as the followings. (1) It is more effective to take planning-based approach than project-based one. (2) The project boundary needs to be decided with the rectangular patterns not the irregular ones for the efficient project. (3) The adjusting the current baseline of agreement should be reconsidered because too high baseline may make the project difficult to progress. (4) Not only systematical public relations to promote the projects but also a variety of incentives to induce the public participations is very important to solve the problems of involvement. (5) Institutional tools for collaborate planning is also desirable to solve the conflicts among stakeholders rationally and effectively.

Successful Winning Award Factors in Early Stage of International Public Private Partnership Projects (해외개발사업 발굴단계의 수주성공요인 분석)

  • Jung, Wooyong;Han, Seungheon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.84-94
    • /
    • 2017
  • Recently, domestic construction companies have increasingly engaged in international PPP projects a result of both uncertainties in the domestic construction market and low competitiveness in international EPC project business. These international PPP projects usually require long-term preparations and substantial sales costs, which make it important for decision-makers to select winning-award potential project in early stage of the projects. However, most previous research has analyzed success factors in terms of project development across all stages. Thus, this study investigated 28 success factors of 4 categories in the early stage of 31 international PPP projects. First, results indicate that unsolicited PPP projects require better implementation capabilities and financial conditions compared to solicited PPP projects. Second, implementation capability is important because it is not easy to improve as the project proceeds. Third, commercial conditions are identified as important even if conditions are not fixed in the early stage of PPP projects. Fourth, non-commercial conditions, strategy, and public interest are not found to be meaningful in the early stage of PPP projects because they can vary as the project proceeds. This study helps to improve selection criteria aimed towards more winning-award potential project in the early stage of international PPP projects.

A Study on the Optimization Model for the Project Portfolio Manpower Assignment Using Genetic Algorithm (유전자 알고리즘을 이용한 프로젝트 포트폴리오 투입인력 최적화 모델에 관한 연구)

  • Kim, Dong-Wook;Lee, Won-Young
    • Journal of Information Technology Services
    • /
    • v.17 no.4
    • /
    • pp.101-117
    • /
    • 2018
  • Companies are responding appropriately to the rapidly changing business environment and striving to lead those changes. As part of that, we are meeting our strategic goals through IT projects, which increase the number of simultaneous projects and the importance of project portfolio management for successful project execution. It also strives for efficient deployment of human resources that have the greatest impact on project portfolio management. In the early stages of project portfolio management, it is very important to establish a reasonable manpower plan and allocate performance personnel. This problem is a problem that can not be solved by linear programming because it is calculated through the standard deviation of the input ratio of professional manpower considering the uniformity of load allocated to the input development manpower and the importance of each project. In this study, genetic algorithm, one of the heuristic methods, was applied to solve this problem. As the objective function, we used the proper input ratio of projects, the input rate of specialist manpower for important projects, and the equal load of workload by manpower. Constraints were not able to input duplicate manpower, Was used as a condition. We also developed a program for efficient application of genetic algorithms and confirmed the execution results. In addition, the parameters of the genetic algorithm were variously changed and repeated test results were selected through the independent sample t test to select optimal parameters, and the improvement effect of about 31.2% was confirmed.

Do IT Managers in Korea Think in Real Option Perspective when Considering ERP Investment Projects? (국내 IT 실무 경영자들은 실물 옵션 사고를 하는가?: 국내 ERP 프로젝트의 투자 평가에 대한 실증연구)

  • SeungHyeon Nam;Taeha Kim;Heedong Yang
    • Information Systems Review
    • /
    • v.19 no.4
    • /
    • pp.157-169
    • /
    • 2017
  • Real option thinking can provide a strategic agility, especially when IT managers consider ERP investment projects. Managing financial and IT risks is critical for the success of ERP investment projects. We examine whether Korean IT managers apply the real option thinking when considering ERP investment projects. On the basis of a survey data collection, we validate hypotheses based on existing literature in IT and finance. Notably, Korean IT managers consider only volatility among financial risk variables and two important IT risk variables, namely, requirement changes and continuous training costs.

Selection of the Optimal Building Skin-System in Remodeling Projects (그린 리모델링을 위한, 적정 외피시스템 선정에 관한 연구)

  • Shin, Young-Su;Cho, Kyu-Man
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.296-297
    • /
    • 2014
  • United Nations Framework Convention on Climate Change(UNFCCC), an international treaty to prevent the regulation and global warming, has passed through the General Assembly for 17 times from 1992 to 2011. To create a performance plan specific, such as the Kyoto Protocol, it is to promote the reduction of energy consumption and greenhouse gases worldwide. In South Korea, Korea Infrastructure Safety and Technology Corporation(KISTEC) is working and supporting for developing method of green remodeling policy. Among several solutions, "Remodeling" ensures to increase the energy efficiency of buildings and to reduce the emissions of greenhouse gases, and consequently it could maintain buildings high efficiency. For remodeling projects, it is most important to determine construction plan including remodeling scopes and methods, while the plan has been determined by the engineer's background and experience. Therefore, this study aims at developing a method for selecting optimal skin system which has remarkable influence to energy performance of the buildings.