• Title/Summary/Keyword: IT 프로젝트 성과

Search Result 1,255, Processing Time 0.025 seconds

IT 프로젝트 관리자의 리더십 유형별 역량이 프로젝트 성과에 미치는 영향

  • Kim, Hwa-Yeong;Gang, So-Ra
    • 한국경영정보학회:학술대회논문집
    • /
    • 2007.11a
    • /
    • pp.96-101
    • /
    • 2007
  • This study has examined the project managers' competency and suggests three competency factors, which are technical, human, and conceptual skills, for the success of IT projects. The study suggests that IT project managers should master three critical skills and knowledge requirements, and consider the proper leadership style for the successful implementation of IT projects. Especially this study has examined the effect of the fit between project managers' competency and leadership style on the performance of IT projects.

  • PDF

Design and Implementation of Team Project Assessment System using auto generated web survey document (자동 생성 웹 설문지를 이용한 팀 프로젝트 평가 시스템의 설계 및 구현)

  • Lee, Mi-Young;Min, Su-Hong;Cho, Dong-Sub
    • The Journal of Korean Association of Computer Education
    • /
    • v.6 no.4
    • /
    • pp.195-207
    • /
    • 2003
  • The Seventh Curriculum uses not only individual assessment but also team assessment method that organizes and solves assignments by team unit. It also helps students to learn cooperation and responsibility and share the ideas and process of the team project with other students through class presentation. It is also cooperative learning which is performed by several students together. Therefore, the assessment of team project is required to synthetically assess the performance process not the itself. This thesis will examine the actual problems about team project assessment and analyze related literatures. Then, this study designs and implements a practical system which alleviates the burden of teachers in charge of a team project assessment and improves reliability and validity in assessing team projects through multilateral assessment aiming at process as well as result objectives.

  • PDF

A Fundamental Research on Scope Definition for Efficient Landscape Architecture Construction Project (효율적 조경공사 프로젝트 수행을 위한 과업범위설정관련 기초 연구)

  • Joo, Sang-Hyun;Lee, Jae-Keun
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.36 no.3
    • /
    • pp.96-110
    • /
    • 2008
  • Differing from civil engineering and construction, landscape architecture projects are far from efforts in operation and project management. Under the circumstances, it is worthwhile to adopt scope definition from project management for construction and civil engineering in some respects. First, scope definition is able to be conducted through a simple procedure without additional investment in capital and time. Second, the output produced by scope definition is very substantial. The research scrutinized scope definition procedures accompanied by landscape architecture project execution and derived various methods in order to help scope definition for efficient landscape architecture projects. Based on the literature review, a design case study, and an exert interview, the project success elements were developed consisting of 3 sections, 8 categories and 50 elements, grounded on the theoretical base of PDRI. The elements are expected to pave a way to an adequate level of scope definition among participants of landscape architecture projects and contribute in efficient project execution.

The Influence Analysis of Metadata Management System Usage Intention on a Data Integration Project (데이터 통합 프로젝트에서의 메타데이터 관리 시스템 사용의도에 대한 영향 분석)

  • Yang, Hae-Seop;Lee, Won-Young
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2007.11a
    • /
    • pp.473-478
    • /
    • 2007
  • 본 연구는 데이터 품질개선을 위해 사용자들에게 베타데이터 관리 시스템 사용의도에 영향을 줄 수 있는 주요 요인들이 무엇이 있는지 식별해보고 요인간의 관련성을 분석 하였다. 최근 이슈화고 있는 Data Architecture, Data Integration, Data Quality 프로젝트를 계획 또는 경험이 있는 조직 IT담당자들을 대상으로 메타데이터 관리 시스템 사용의도 설문을 하였고, SPSS를 이용하여 통계적 희귀분석을 수행하였다. 분석에서 이를 설명하는 연구모형으로 정보기술수용모델(Technology Acceptance Model:TAM)을 적용하였으며, 사용 용이성(Perceived easy of use), 유용성(perceived usefulness)에 영향을 주는 외생변수로는 개인의 데이터 품질개선의도, 동기부여, 조직의 지원 등으로 나타났다. 분석결과 데이터품질 개선의도가 시스템 사용의도에 영향이 있음을 실증하였고, 사회적 요인(동기부여, 조직의 기원) 모두 유용성에는 영향을 미쳤으나 사용 용이성에는 유의하지 많은 결과를 보였다. 이 연주에서는 조직이 데이터 품질 개선을 위해 메타데이터 관리시스템을 사용하고자 할 경우 고려사항과 향후 사용자 관점의 기술수용들을 확장된 연구를 수행하여 데이터품질 개선에 방안들을 탐색할 것을 제안하였다.

  • PDF

A Cross-National Comparison of Uncertainty Profile and Software Project Performance (불확실성과 소프트웨어 프로젝트 성과에 대한 국가간 비교연구)

  • Kim, Ki-Yoon;Na, Kwan-Sik;Choi, Kwang-Don
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2002.11a
    • /
    • pp.279-285
    • /
    • 2002
  • 다양한 소프트웨어개발 위험관리 분야의 연구들 중, 미국의 소프트웨어 회사들을 대상으로 한 Nidumolu의 논문에서는 표준화와 요구사항 불확실성이 잔여성과위험이라는 매개 변수를 통해서, 소프트웨어 개발프로세스와 제품 성과에 영향을 미친다는 결과를 발표하였다. 본 연구에서는 먼저, 개발도상국인 우리나라에서도 이러한 모형이 적용될 수 있는 지를 검정하였는데, 결론적으로 잔여성과 위험이라는 매개변수는 모형에서 의미가 없는 것으로 나타났다. 이는 우리나라 소프트웨어 업체의 경우 성숙도가 상대적으로 낮아서, 프로젝트 관리자와 같은 개인의 능력에 성과가 영향을 받는 때문인 것으로 보인다. 따라서 본 연구에서는 이러한 차이의 원인에 대해서 논의하고, 나아가서 우리나라의 기업 환경에 적합한 새로운 모형을 제시하고자 한다.

  • PDF

A Research for effect on the audit quality and project performance by the service quality of information system audit (정보시스템감리의 서비스품질요인이 감리충실도와 프로젝트성과에 미치는 영향 연구)

  • Kim, Dong-Soo;Kim, Hyun-Soo;Yang, Kyung-Sik;Kang, Jae-Hwa
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2006.05a
    • /
    • pp.380-387
    • /
    • 2006
  • 정보화가 급격히 확산되면서 정보화로 인한 파급효과와 더불어 정보화의 위험과 역기능 방지와 정보시스템의 품질을 제고하기 위한 최적의 방법중 하나로서 정보시스템 감리에 대한 중요성과 그 수요가 증가하고 있다. 더불어 감리내실화와 신뢰성제고를 위한 기술연구와 제도연구도 지속적으로 수행되어왔다. 많은 감리의뢰기관이 감리자체를 시업성공을 위한 품질보증 및 생산성 향상을 도모하기 위해 실시하는 중간평가로 보지 않고 있고, 감리인의 학력.경력.자격수준 및 신기술에 대한 이해도, 숙련도 부족과 감리대상업무파악 미흡으로 현장감각이 부족하여 실제보다 형식에 치우쳐 있다. 따라서, 정보시스템 감리의 서비스품질이 상대적으로 취약하여 감리의뢰기관이나 피감리 기관으로부터 신뢰를 얻지 못하고 있다. 본 연구에서는 마케팅분야의 서비스품질평가모형을 일부 도입하여 감리서비스 품질요인과 감리품질 또는 감리충실도간의 관계를 규명하고, 나아가서 감리충실도에 영향을 끼치는 요소는 외적서비스요인과 내적서비스요인으로 구분하였으며, 이요인들이 감리충실도에 미치는 영향을 규명코자 하였다, 더불어 감리충실도가 감리효과 및 만족도와 프로젝트성과에 미치는 영향을 규명코자 하였다.

  • PDF

A Study on the Technology Collaboration between the Main Supplier and Buyer under the Dynamic Environment: The Focus on the Performance of New Product Development (역동적 환경 하에 구매사/주공급사 간의 기술협력은 신제품 개발 프로젝트 성과를 향상시키는가?)

  • Lee, Younsuk;Ham, Minjoo;Moon, Seongwuk
    • Journal of Technology Innovation
    • /
    • v.23 no.3
    • /
    • pp.397-432
    • /
    • 2015
  • This paper investigates the effects of technology collaboration between the main supplier and buyer on buyer's new product development under dynamic environment. Based on 428 Korean manufacturing firms, we conducted regression analysis. The technology collaboration between the main supplier and buyer is adopted as a independent variable and quality, cost and lead time performance of new product development projects are used as dependents variables. Environment dynamic is also used as a moderate variables. We found that the in general, technology collaboration is positively associated with the performance of buyers' new product development, but in the high degree of dynamic environment, technology collaboration is negatively associated with the performance of buyers' new product development unlike our expectation. Thus, we divide our sample into two groups; shipbuilding industry with the low degree of environment dynamic and electronic and IT device industry with the high degree of environment dynamic and conducted a post hoc analysis. As a result, in ship building industry, the technology collaboration is significant to improve NPD projects performance, while in electronic and IT device industry, the technology collaboration with a main supplier is not significant as well as coefficient is negative. In that, under the highly dynamic condition with the fast change of technology and products obsolescence the NPD collaboration with the main supplier does not works unlike a stable environment. This implies that the NPD attributes of buyer are different by their environmental factor and the fit between given environmental feature and the collaboration synergy is critical factor for improving the effect of NPD collaboration between supplier and buyer.

Development of a Conceptual Estimate Methodology for Plant Construction Projects (플랜트 건설 프로젝트를 위한 개산견적 방법론 개발)

  • Kim, Hyun-Joong;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.141-150
    • /
    • 2019
  • In the overseas plant construction market, the domain construction firms' construction capability has been greatly improved, but the capability of project management is evaluated to be insufficient compared to the technical aspect. Project management capabilities from the initial planning stage of project execution are regarded as the core competence of advanced construction companies. Among them, it is urgent to improve the capacity of conceptual estimate for domestic companies. In this study, the researchers surveyed and analyzed the methodology of estimating project cost in the planning phase of the plant project and developed an estimation method by conducting a case study analysis. Based on the logic of the cost index and parametric estimation method among the existing estimation methodology, the estimation tool was developed by deriving the input and output variables tailored to the plant project. The validity of the proposed methodology was evaluated by comparing the accuracy between the project estimate amount of the case project and the actual project amount. In order to increase the utilization of the developed conceptual estimate methodology,for plant construction project, it is necessary to systematize the data of the historical project data. Increasing the accuracy of future project cost estimates is directly related to increasing project award and profitability of the domestic construction company.

Real Options Analysis for the Investment of Floating Photovoltaic Project in Saemangeum (실물옵션을 활용한 새만금 수상태양광 투자사업의 수익성 분석)

  • Kim, Kyeongseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.1
    • /
    • pp.90-97
    • /
    • 2021
  • Saemangeum Development is the largest national project in South Korea, which has been developed for an agricultural, economic and tourist area for 30 years from 1987. In order to convert power sources that used to depend on nuclear and thermal power to eco-friendly for carbon reduction, the government plans to construct a 2.1GW floating photovoltaic project by investing 4.6 trillion won, as a public-private project. For success of the Saemangeum floating photovoltaic project, economic feasibility should be checked. This study defined the factors (construction cost, electricity selling price, power generation and maintenance cost) that give a effect to the volatility of the floating photovoltaic payoffs, and analyzed the volatility of payoffs during 20 years operation period. NPV and option value of the project were calculated by applying an option to abandon. According to NPV analysis, it is determined that projects are difficult to invest. But this project has economic feasibility through real options analysis. This study is expected to help decision-makers in the economic analysis of floating photovoltaic projects by using the real options analysis.

Opportunity Tree Framework Design For Optimization of Software Development Project Performance (소프트웨어 개발 프로젝트 성능의 최적화를 위한 Opportunity Tree 모델 설계)

  • Song Ki-Won;Lee Kyung-Whan
    • The KIPS Transactions:PartD
    • /
    • v.12D no.3 s.99
    • /
    • pp.417-428
    • /
    • 2005
  • Today, IT organizations perform projects with vision related to marketing and financial profit. The objective of realizing the vision is to improve the project performing ability in terms of QCD. Organizations have made a lot of efforts to achieve this objective through process improvement. Large companies such as IBM, Ford, and GE have made over $80\%$ of success through business process re-engineering using information technology instead of business improvement effect by computers. It is important to collect, analyze and manage the data on performed projects to achieve the objective, but quantitative measurement is difficult as software is invisible and the effect and efficiency caused by process change are not visibly identified. Therefore, it is not easy to extract the strategy of improvement. This paper measures and analyzes the project performance, focusing on organizations' external effectiveness and internal efficiency (Qualify, Delivery, Cycle time, and Waste). Based on the measured project performance scores, an OT (Opportunity Tree) model was designed for optimizing the project performance. The process of design is as follows. First, meta data are derived from projects and analyzed by quantitative GQM(Goal-Question-Metric) questionnaire. Then, the project performance model is designed with the data obtained from the quantitative GQM questionnaire and organization's performance score for each area is calculated. The value is revised by integrating the measured scores by area vision weights from all stakeholders (CEO, middle-class managers, developer, investor, and custom). Through this, routes for improvement are presented and an optimized improvement method is suggested. Existing methods to improve software process have been highly effective in division of processes' but somewhat unsatisfactory in structural function to develop and systemically manage strategies by applying the processes to Projects. The proposed OT model provides a solution to this problem. The OT model is useful to provide an optimal improvement method in line with organization's goals and can reduce risks which may occur in the course of improving process if it is applied with proposed methods. In addition, satisfaction about the improvement strategy can be improved by obtaining input about vision weight from all stakeholders through the qualitative questionnaire and by reflecting it to the calculation. The OT is also useful to optimize the expansion of market and financial performance by controlling the ability of Quality, Delivery, Cycle time, and Waste.