• Title/Summary/Keyword: IT 프로젝트 성과

Search Result 1,255, Processing Time 0.029 seconds

Development of Project Success Model in Enterprise Using FCM (FCM을 이용한 기업프로젝트의 성공 모델 개발)

  • Park, Young-Man;Hwang, Seung-Gook;Park, Kwang-Bak;Lee, Young-Joo
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.20 no.1
    • /
    • pp.123-128
    • /
    • 2010
  • To increase the chance of the success of project, it is necessary to identify the important factors influencing the performance of project. Cognitive map has been used for analysing by investigating causal links among relevant factors. A fuzzy cognitive map (FCM) is an extension of a cognitive map with the additional capability of representing feedback through weighted causal links. Project performance is influenced by several factors such as input resources, possibility of achievement, concern of others and so on. The object of this paper is to develop the project success model of enterprise using a fuzzy cognitive map approach to investigate the degree of causal relationship between project performance and these factors.

Effects of Project Learning on Information Skills among Key-Competencies in 'Homepage Development' Lesson ('홈페이지 제작' 단원의 프로젝트 학습이 직업기초능력 중의 정보능력에 미치는 영향)

  • Kim, Minbeom;Kim, Yongbeom;Kim, Yungsik
    • The Journal of Korean Association of Computer Education
    • /
    • v.10 no.1
    • /
    • pp.31-40
    • /
    • 2007
  • The qualities that are commonly necessary in the occupation life and the abilities to cope with the changing job-world are getting more important. This study proposed the project-learning model and applied it to the homepage-developing learning of the computer course in the commercial high school. Then, this study conducted the nonrandomized controlgroup pretest - posttest design in order to verify how the model influence Information-skills of Key-competencies. At the posttest, the difference between the traditional learning group and project-learning was meaningful. Therefore, It can be confirmed that project-learning was more affirmative in enhancing information-skills of the students. Through this study, it can be concluded that the instructional method is very important and we propose there be a lot of studies about the instructional methods enhancing the various Key-competencies.

  • PDF

Construction Project-Based Material for Learning Visual Basic Using Flash and Photoshop (플래시와 포토샵을 이용한 비주얼베이직 학습을 위한 프로젝트 기반 교육컨텐츠)

  • Kim Min-Jung;Park Doo-Soon
    • Journal of Korea Multimedia Society
    • /
    • v.9 no.3
    • /
    • pp.353-359
    • /
    • 2006
  • For answering a given condition of education which tries groping various instruction way of learner-leading, project-based instruction is noticed that inducing motive and interest of study by learner maker the effect of teaming, instruction way of owner-leading which solve by themselves. In this thesis, it develops education contents for applying project-based instruction to visualbasic course. Using FLASH MX and PHOTOSHOP 6.0 program which became known web production means, in distinction from the instruction contents which is a freeze-frame, it makes prossible interaction between computer and learner, induce interest and concentration of learner. In result of applying this, it appears real effect to the learning effect.

  • PDF

The Study on the Control Combinations in IS Outsourcing Project Management (IS 아웃소싱 프로젝트 관리를 위한 조합적 통제유형에 관한 연구)

  • Lee, Sang-Kon
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2003.11a
    • /
    • pp.70-77
    • /
    • 2003
  • 본 연구는 아웃소싱 상황에서 정보시스템 개발프로젝트의 관리에 대한 이해를 목적으로, 시스템개발 프로젝트에 대한 관리를 통제(control) 또는 조정(coordination)의 관점에서 보는 기존의 연구 흐름과 같은 선상에서, IS 아웃소싱 프로젝트 관리의 문제를 조직간 통제관점에서 살펴보고자 한다. 본 연구에서는 다음의 두 가지 측면에서, 기존 연구의 확장을 시도하였다. 첫번째, 조직내부의 시스템 개발프로젝트 관리의 연구결과를 아웃소싱 상황으로 확장하여 적용하였다. 두번째, 기존 연구들이 개별 통제유형에 주목하였으나, 현실적으로는 다양한 통제유형이 동시에 존재하기 때문에, 조합적 측면에 초점을 맞추어 확장하였다. 이를 위하여 공식적 통제와 비공식적 통제를 두 가지 기준을 사용하여, 네 가지의 통제조합에 대한 이론적 유형(typology) - 역동적, 계약중심, 파트너쉽중심, 수동적 유형 - 제시하여, 35개 기업의 66개 프로젝트를 통하여 실증적으로 검증하였다. 연구결과는 파트너쉽중심 유형을 제외하고는 이론적 유형과 유사한 네 가지의 통제조합에 대한 실증적 유형(taxonomy) - 역동적, 계약중심, 중간형, 수동적 유형-이 도출되었다. 각 실증적 유형간의 차이는 역동적 유형과 계약중심 유형이 높은 것으로 나타났으며, 중간형 유형과 수동적 유형의 성과가 상대적으로 낮은 것으로 나타났다.

  • PDF

A Study of Introduction of CMMI on Design Process for Improving Collaboration (설계협업 프로세스의 개선을 위한 CMMI 도입 방안에 대한 연구)

  • Jun, Joon-Ki;Yi, June-Seong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.436-440
    • /
    • 2008
  • Evaluating the work process of the organization is necessary to improve efficiency and make high quality of results. As size of construction projects are bigger, it is also applied to design firm. By applying efficient process, design team can reduce rework and waste. To make systematic process and keep a continuous progress, process evaluation is required. On this study, CMMI(Capability Maturity Model Integration) concept is benchmarked. Originally CMMI is suggested to evaluating capability of work process of Soft Ware developing organization by SEI(Software Engineering Institute). From CMMI system, direction of making evaluating method of design project performing team is drove. After worked out the evaluation method of capability maturity of process in design team, it could contribute making progress in the design process and satisfying client.

  • PDF

Establishing the Importance Weight Model of IT Investment Evaluation Criteria through AHP Analysis (AHP 기법을 적용한 IT프로젝트 사전타당성 평가항목의 가중치 산출)

  • Kwon, Min-Young;Koo, Bon-Jae;Lee, Kuk-Hie
    • Information Systems Review
    • /
    • v.8 no.1
    • /
    • pp.265-285
    • /
    • 2006
  • The purpose of this research is to identify the major evaluation criteria of IT investment projects and establish the importance weights of criteria through AHP analysis. Seven evaluation criteria which have been drawn from prior studies and industry practices are direct costs, indirect costs, financial benefits, strategic value, risk, technical necessity, and political considerations. Data have been collected from 95 IT projects in 40 public organizations and private firms in Korea. After having applied the data reliability test, 79 projects have been selected. The results of AHP analysis show the importance weights and priorities of seven evaluation criteria as follows: financial benefits 25.2%, strategic value 22.36%, direct costs 14.34%, risk 12.10%, technical necessity 11.55%, political considerations 8.3%, and indirect costs 6.48%. And the weights of seven criteria shows considerable differences among three different IT project types such as transactional, informational, and infrastructural.

The Correlation Analysis of Factors Impact on the IT Investment Performance - Extended IS Success Model (IT 투자와 성과간의 상관관계에 대한 분석 - 발전된 IS 성공 모형 -)

  • Suh, Han-Jun;Yoon, Sung-Chul;Kim, Min-Seok
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2003.05a
    • /
    • pp.1-9
    • /
    • 2003
  • 지난 수년간, IT 비용의 지속적인 증가에 따른 IT 투자 의사결정 및 평가를 위한 성과 분석은 최근 가장 주요한 이슈가 되고 있다. IT 투자와 성과간의 상관 관계를 규명하기 위한 수많은 노력에도 불구하고 IT 투자 성과 측정의 어려움과 이에 영향을 미치는 요소들의 복합성으로 인하여 낮은 IT 투자 성과의 원인을 제시하는 것은 여전히 쉽지 않은 문제이다. 본 연구는 실제 IT 투자 규모와 IT 투자 성과간의 상관관계를 분석하고, 이에 조직, IS프로젝트, 사용자 요인들이 어떻게 영향을 미치는지 나타내고자 하였다. 2개 제조업체의 총 44개의 단위시스템들에 대하여, IT 투자 비용은 형태별로, IT 투자 성과는 정성적, 정량적인 효과를 정보, 시스템, 사용자, 조직효과 관점에서 측정하고 있다. 또한, 각 시스템을 구축하였던 업무 담당자들, 사용자들에 대한 인터뷰 및 설문을 통하여 조직, IS프로젝트, 사용자 요인을 측정하고 있다. 본 연구는 효과적인 IT 투자 성과를 얻기 위해서는, 절대적인 IT 투자 규모도 중요하지만 구체적인 정보전략계획의 수립, 경영진의 지원, 사용자의 적극적 참여와 같은 IT 투자 실행의 중요성을 제시하고 있다. 이들 결과를 바탕으로 IT 투자를 고려하고 있는 기업들에게 효과적인 투자 방안을 제시할 수 있을 것이다.

  • PDF

Do IT Managers in Korea Think in Real Option Perspective when Considering ERP Investment Projects? (국내 IT 실무 경영자들은 실물 옵션 사고를 하는가?: 국내 ERP 프로젝트의 투자 평가에 대한 실증연구)

  • SeungHyeon Nam;Taeha Kim;Heedong Yang
    • Information Systems Review
    • /
    • v.19 no.4
    • /
    • pp.157-169
    • /
    • 2017
  • Real option thinking can provide a strategic agility, especially when IT managers consider ERP investment projects. Managing financial and IT risks is critical for the success of ERP investment projects. We examine whether Korean IT managers apply the real option thinking when considering ERP investment projects. On the basis of a survey data collection, we validate hypotheses based on existing literature in IT and finance. Notably, Korean IT managers consider only volatility among financial risk variables and two important IT risk variables, namely, requirement changes and continuous training costs.

Design of Checklist for Improvement of Reliability of Uncertainty and Variability Environment (불확실성 및 가변성 환경의 신뢰성 향상을 위한 체크리스트 설계)

  • Lee, Eun-Ser
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.3 no.10
    • /
    • pp.389-396
    • /
    • 2014
  • There are many defects when we're working on a project. Especially, if we don't have experience in similar field, defects have a strong influence on the system entirely. Therefore, management of risk such like defects is important the factor for success of project. Finally, efficient management of risk can guarantee handling problems such like fault tolerancy, unexpected quality and delay of schedule. In this paper, we propose checkpoint for improvement of reliability and are willing to improve the reliability of an entire system using it.

Efficient Transmission & Substation Construction Project Management Based on ICT (ICT 기반의 효율적 송변전 건설 프로젝트 관리방안 연구)

  • Suk, Kwang-Hyun;Min, Byeong-Wook;Hwang, Jeong-Ill;Lee, Seung-Kyun;Lee, Si-Young
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.555-556
    • /
    • 2011
  • 오늘날 전기는 물과 같이 일상생활에 없어서는 안 될 생활 필수품이다. 특히 21세기는 IT, 디지털, 초정밀 산업의 시대로 순간정전에도 민감하게 반응하는 고품질의 전력이 요구되는 시대이다. KEPCO는 세계 최고 수준의 전기품질과 저렴한 요금으로 모든 국민에게 안정적으로 전력을 공급해야 하는 막중한 책임이 있다. 따라서 고품질의 전력을 주요 수요지로 수송하기 위한 송전선로와 변전소의 적기 건설을 위한 효율적이고 체계적인 프로젝트관리 중요성이 대두되었으며, KEPCO는 경영의 투명성을 제고하고 회사내부의 자원 및 업무 프로세스를 통합관리하고자 도입한 전사적자원관리(Enterprise Resource Planning; ERP) 시스템내에 송변전 건설 프로젝트 시스템(PS)을 구축함으로써 송변전건설 프로젝트 관리업무를 ERP라는 통합된 환경에서 수행할 수 있게 되었다. 그러나 최근 생활수준의 향상에 따른 송변전 건설관련 민원과 각종 건설규제 법률 강화 등으로 보다 효율적이고 통제 가능한 송변전설비 건설프로젝트 관리의 필요성에 대한 요구가 지속적으로 제기되었다. 이에 본 논문에서는 KEPCO의 효율적인 송변전 건설사업 공정관리를 위한 ICT기반의 건설 프로젝트 관리 방안에 대해 살펴보고자 한다.

  • PDF