Risk-sharing Strategies on EPC Contracts: Lessons-learned from Sabine Pass Liquefaction Project

  • Yoon, Sang-Moon;Lee, Jung-Heon;Lee, Eul-Bum
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.629-630
    • /
    • 2015
  • 'Sabine Pass Liquefaction Project (SPL Project)', a case study in this report, is the first construction project of a U.S. liquefaction facility for shale gas export overseas. This study analyzes the SPL Project to give understanding and a guideline to Korean EPC companies by benchmarking about effective risk-sharing strategies on EPC contracts. This study consists of three parts. The first summarizes the liquefaction process adopted on the SPL Project, named the 'ConocoPhillips Optimized Cascade Process', and compares it with other competitive liquefaction processes. The second introduces the unique features of the SPL EPC contract by comparing it with two other EPC forms of contracts: a FIDIC Silver Book for onshore plant projects and a contract of an offshore oil production (FPSO) project. The third focuses on the complexity of project financing (PF), especially lenders control and impact on the EPC contract such as covenant provisions to constrain variations and changes on the EPC Contract. From these conclusions, it is anticipated that this case study can provide a guideline for successful performance of Korean EPC contractors overseas.

  • PDF

해저터널 시공중 지반조건별 위험 시나리오 관리기법 (Management of Risk Scenarios based on Ground Conditions under Construction of a Subsea Tunnel)

  • 박의섭;신희순;신용훈;김택곤
    • 터널과지하공간
    • /
    • 제19권4호
    • /
    • pp.275-286
    • /
    • 2009
  • 해저터널을 굴착할 때 다양한 지반조건에서 발생하는 기술적인 위험에 대한 원인 규명과 조치를 수립하기 위해서는 예상되는 위험 시나리오를 구성하는 것이 중요하다. 또한, 위험 시나리오를 분류할 때 터널 굴착노선 전반에 걸쳐 발생되는 시나리오와 일부 구간에 국한하여 발생되는 시나리오를 함께 고려함으로써 프로젝트관리 측면에서 체계적이고 조직적인 대응을 할 수 있는 논리적인 틀을 제공할 수 있다. 본 연구에서는 위험 시나리오에 대한 관리기법으로 프로젝트 위험 시나리오와 프로젝트 관리요소를 구성하고 파일럿 프로젝트를 선정하여 프로젝트 일정을 수립하였다. 특히 해저터널에서 예상되는 위험 시나리오를 일반 위험 시나리오와 특정 위험 시나리오로 분류하고 프로젝트 관리요소와 연계할 수 있는 개념을 도출하였다.

A PROFIRABILITY MODEL BASED ON PRIMARY FACTOR ANALYSIS IN THE EARLY PHASE OF HOUSING REDEVELOPMENT PROJECTS

  • Kyeong-Hwan Ahn;U-Yeong Gim;Jong-Sik Lee;Won Kwon;Jae-Youl Chun
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.497-501
    • /
    • 2013
  • An important decision-making element for the success of housing redevelopment projects is a prediction of the profitability of redevelopment. Risk factors influencing profitability were deduced through a review of the literature about profitability and a risk analysis developed by a survey of maintenance projects. In addition, a profitability prediction depending on the analysis of risk factors is necessary to judge the business feasibility of a project in the planning stages. A profitability prediction model of management and disposal method, which is calculated by proportional rate and which helps estimate contributions to profitability, is proposed to prevent difficulties in business development. The proposed model has the potential to prevent interruptions, reduce the length of projects, generate cost savings, and enable rational decision-making during the project period by allowing a judgment of profitability at the planning stage.

  • PDF

건설프로젝트의 파트너링 적용에 관한 연구 (Application of Partnering in Construction Project)

  • 정병화;김성철
    • 한국건설관리학회논문집
    • /
    • 제5권1호
    • /
    • pp.149-156
    • /
    • 2004
  • 효과적인 리스크관리를 수행하기 위하여 국내 건설회사의 리스크관리 실태를 설문조사와 인터뷰를 통하여 분석하였다. 그 결과 리스크인자를 규명하고 그 제어 및 대응책으로 개선된 건설 계약방식을 제시하고자 한다. 개선된 계약방식의 파트너링은 건설프로젝트에 사용이 증가하고 있으며 파트너링은 건설프로젝트를 수행함에 있어 계약당사자들의 갈등해소, 능률적이고 긴밀한 관계유지, 신뢰하는 분위기로 프로젝트를 수행하는 것을 의미한다. 파트너링에 의해 건설계약을 체결한다면 리스크인자를 경감하게 되어 공기단축, 품질향상, 공사비절감, 안전한 시공을 할 수 있는 건설프로젝트의 계약방식을 제시하였다.

IT프로젝트 위험 요인 식별 및 분석 프레임워크 연구 (A Framework for Identifying and Analyzing IT Project Risk Factors)

  • 최장호;곽찬희;이희석
    • 경영정보학연구
    • /
    • 제19권4호
    • /
    • pp.87-110
    • /
    • 2017
  • IT프로젝트 관리에 가장 중요한 요소 중 하나는 위험 관리이다. IT프로젝트 수행 중 발생할 수 있는 위험을 예측하고 대처하는 것이 프로젝트 성공 여부를 결정짓는 중요한 요소로 작용하기에, IT프로젝트 위험 요인은 학계와 업계에서 꾸준히 주목을 받는 주제이다. 이에 연구자들은 우선순위를 포함한 위험 요인 체크리스트 도출, 위험 요인들의 원인 관계 분석 및 프로젝트에 미치는 영향도 도출 등의 연구를 수행하였다. 그러나 위험 요인의 발생 확률과 영향도를 동시에 고려하는 위험 노출도의 관점에서 IT프로젝트 위험 요인을 체계적으로 분류한 연구는 미비하다. 본 연구는 문헌 연구 및 IT프로젝트 전문가 인터뷰를 바탕으로 IT프로젝트 위험 요인 53개를 도출하고, 도출된 위험 요인을 위험 노출도 관점에서 조사하였다. 나아가 프로젝트 관리자 140명의 설문을 통해 얻은 데이터로 군집분석을 실시해 4영역(HIHF, HILF, LIHF, LILF)으로 구분된 IT프로젝트 위험 요인 분류체계 프레임워크를 개발하였다. 또한 IT프로젝트를 프로젝트 성격 및 분야별로 위험 요인의 노출도 및 우선순위를 비교 분석하였다. 본 연구의 결과는 IT프로젝트 관리자들의 효율적 위험 관리 전략 수립을 돕고 IT프로젝트 실패를 줄이는데 활용될 수 있을 것이다. 또한 위험 요인의 발생 확률과 영향도를 동시에 고려했다는 측면에서 학문적인 의의를 가진다.

Risk Critical Point (RCP): A Quantifying Safety-Based Method Developed to Screen Construction Safety Risks

  • Soltanmohammadi, Mehdi;Saberi, Morteza;Yoon, Jin Hee;Soltanmohammadi, Khatereh;Pazhoheshfar, Peiman
    • Industrial Engineering and Management Systems
    • /
    • 제14권3호
    • /
    • pp.221-235
    • /
    • 2015
  • Risk assessment is an important phase of risk management. It is the stage in which risk is measured thoroughly to achieve effective management. Some factors such as probability and impact of risk have been used in the literature related to construction projects. Because in high-rise projects safety issues are paramount, this study has tried to develop a quantifying technique that takes into account three factors: probability, impact and Safety Performance Index (SPI) where the SPI is defined as the capability of an appropriate response to reduce or limit the effect of an event after its occurrence with regard to safety pertaining to a project. Regarding risk-related literatures which cover an uncertain subject, the proposed method developed in this research is based on a fuzzy logic approach. This approach entails a questionnaire in which the subjectivity and vagueness of responses is dealt with by using triangular fuzzy numbers instead of linguistic terms. This method returns a Risk Critical Point (RCP) on a zoning chart that places risks under categories: critical, critical-probability, critical-impact, and non-critical. The high-rise project in the execution phase has been taken as a case study to confirm the applicability of the proposed method. The monitoring results showed that the RCP method has the inherent ability to be extended to subsequent applications in the phases of risk response and control.

INFLUENCE FACTOR-BASED RISK ASSESSMENT METHODOLOGY FOR CONSTRUCITON

  • Hyunsoo Kim;Hyunsoo Lee;Moonseo Park;Kwang-pyo Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1231-1236
    • /
    • 2009
  • Many work-related risk factors can cause construction site hazards. Therefore, safety management begins with measuring the magnitude of risk involved in a project. This study proposes a methodology for risk assessment of major trades at a particular construction site. To assess risk, this methodology integrates hazard severity and frequency, and their magnitude is calculated based on actual work-site hazards. This methodology also considers the influence factors that affect the frequency of work-related hazards. To select the appropriate influence factors, a two step approach is deployed. First, the predominant factors are identified through a literature review. Second, a selective process filters out the influence factors that are difficult to analyze quantitatively, and these extracted factors are weighted using expert surveys. Finally, the factors are combined and a quantitative risk assessment methodology is proposed.

  • PDF

도시재생사업 참여주체별 위험인지 체크리스트 개발 (A Development of Risk Identification Checklist for Stakeholder in Urban regeneration-Projects)

  • 박규영;김선규
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.487-490
    • /
    • 2008
  • 최근 활발히 진행되고 있는 도시재생사업과 같은 대규모 복합개발사업은 사업기간이 길고 다양한 사업주체들이 참여한다. 이러한 특성 때문에 사업추진 과정상 많은 위험요인들을 내포하게 되고 이를 관리하는 것은 사업의 성패에 큰 영향을 미친다. 그러므로 도시재생사업에서 위험을 인지하고 대응하는 일련의 위험관리 과정은 정확하고 체계적으로 수행되어야 한다. 위험관리과정에서 위험인지단계는 다양한 위험요인을 인지하고 그 위험의 성격을 규정하는 첫 단계이다. 위험을 인지하는 기법 중 체크리스트는 가장 보편적이고 실용적인 방법이라고 할 수 있다. 따라서 본 연구에서는 도시재생사업의 개발단계에서 사업주체들의 업무를 분석하고, 위험을 도출하여 사업주체별로 위험을 분류하는 체크리스트를 제안하였다. 이러한 주체별 위험요인 체크리스트는 실무자가 쉽게 위험을 파악할 수 있는 도구로써, 도시재생사업과 같이 다양한 사업주체들이 자신은 물론 다른 사업 참여자들의 위험을 인지하는데도 효과적일 것이라고 기대된다.

  • PDF

공공건설임대주택사업의 현금흐름에 대한 리스크분석 (A Study of the Analysis and Identification of Risk Factor in Regard to Cash Flow in Public Rental Housing Development Project)

  • 이상곤;이재영;이학기
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.423-426
    • /
    • 2004
  • 공공건설임대주택의 사업비는 국민주택기금, 임대료, 임대보증금, 공사비, 금융비용 등 다양한 수익과 비용이 복합적으로 나타나게 된다. 따라서 공공건설임대주택 사업은 그 특성상 유동성과 재무탄력성에 대한 유용한 정보를 제공해 줄 수 있는 현금흐름예측이 필요하다. 그러나 현금흐름분석은 일부 시행하고 있었으나, 이를 예측 $\cdot$ 관리하고 있는 곳은 전무한 것으로 나타났다. 현금흐름 예측을 위한 일반적인 사항들은 실적자료와 문헌을 통하여 알 수 있으나, 현금흐름 예측의 정확성을 높이기 위한 리스크에 대한 연구는 전무한 실정이었다. 기존의 리스크에 대한 연구는 사업 전체에 대한 연구로 현금흐름과 정확한 상관관계를 알 수 없었다. 따라서 본 연구에서는 수익성 측면에서의 사업성분석 방법으로 현금흐름 예측방법을 제안하고 공공건설임대주택사업의 정확한 현금흐름예측과 관리를 위하여 현금흐름 각 항목에 영향을 미치는 리스크 인자들을 식별 $\cdot$ 분석 하고 그 대응방안을 모색하고자 한다.

  • PDF

A MODEL OF RISK MANAGEMENT PLAN AND SYSTEM FOR THE CONSTRUCTION PHASE

  • Seon-Gyoo Kim;Chan-Jeong Park ;Moon-Serk Yang;Jin-Bong Kim ;Hyung-John Shin
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.341-346
    • /
    • 2005
  • After the IMF shock, some major construction companies in Korea have been motivated to avoid and mitigate various risk factors which could be critical and catastrophic events to corporate revenue and organization internally or externally. It means that they are trying to introduce and set up a risk management plan and system suitable to their organization and culture. L construction co. ltd. is one of major construction companies that have been searching methodologies or technologies to manage various risk factors surrounding corporate marketing and project operation. This paper presents an unique approach to develop a model of risk management plan and system suitable to L construction itself focused on the construction phase.

  • PDF