A PROFIRABILITY MODEL BASED ON PRIMARY FACTOR ANALYSIS IN THE EARLY PHASE OF HOUSING REDEVELOPMENT PROJECTS

  • Kyeong-Hwan Ahn (Dept. of Architectural Engineering, Dankook University) ;
  • U-Yeong Gim (Dept. of Architectural Engineering, Dankook University) ;
  • Jong-Sik Lee (Dept. of Architectural Engineering, Dankook University) ;
  • Won Kwon (Dept. of Architectural Engineering, Dankook University) ;
  • Jae-Youl Chun (Dept. of Architectural Engineering, Dankook University)
  • Published : 2013.01.09

Abstract

An important decision-making element for the success of housing redevelopment projects is a prediction of the profitability of redevelopment. Risk factors influencing profitability were deduced through a review of the literature about profitability and a risk analysis developed by a survey of maintenance projects. In addition, a profitability prediction depending on the analysis of risk factors is necessary to judge the business feasibility of a project in the planning stages. A profitability prediction model of management and disposal method, which is calculated by proportional rate and which helps estimate contributions to profitability, is proposed to prevent difficulties in business development. The proposed model has the potential to prevent interruptions, reduce the length of projects, generate cost savings, and enable rational decision-making during the project period by allowing a judgment of profitability at the planning stage.

Keywords