• 제목/요약/키워드: IS Development and Operations

검색결과 1,934건 처리시간 0.034초

VERIFICATION ON THE PERFORMANCE OF COMS SOC S-BANDSSPA

  • Park, Durk-Jong;Yang, Hyung-Mo;Ahn, Sang-Il
    • 대한원격탐사학회:학술대회논문집
    • /
    • 대한원격탐사학회 2007년도 Proceedings of ISRS 2007
    • /
    • pp.482-485
    • /
    • 2007
  • The S-Band SSPA is front-end equipment to transmit both LRIT and HRIT to COMS. To provide the required EIRP, S-Band SSPA is designed to generate maximum 1kW power at its 1dB gain compression point (P1dB). Due to the operation for 24 hours per seven days, the verification on the performance of S-Band SSPA was performed thoroughly. This paper presents that major requirements such as maximum 1kW power, maximum -26dBc of IMD characteristic at 500W output and around -57dBc of coupling factor were verified through proposed test configuration.

  • PDF

A Study on the Determinants of Continuance Intention in Mobile Internet Service: A Relationship Development Perspective

  • Kim, Hee-Woong;Kwahk, Kee-Young
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 2007년도 추계학술대회 및 정기총회
    • /
    • pp.273-287
    • /
    • 2007
  • The mobile Internet (M-Internet) service is a form of subscription-based information Systems (IS) services in which usage continuance is essential for the eventual success of the service providers. However, previous research on IS continuance has focused mainly on the technology user aspects despite the fact that the user plays a dual role of being a technology user and service consumer in many IS usage contexts. This study thus aims to examine IS continuance based on the theoretical foundation of dedication-based and constraint-based customer relationship development in the context of M-Internet service. Four customer relationship development factors (satisfaction, perceived value, familiarity, and switching costs) are identified and tested on how they affect continuance intention from a survey conducted on M-Internet service users. Then, the results of this study are discussed along with its limitations and implications.

  • PDF

STRUCTURAL CHANGES IN DYNAMIC LINEAR MODEL

  • Jun, Duk B.
    • 한국경영과학회지
    • /
    • 제16권1호
    • /
    • pp.113-119
    • /
    • 1991
  • The author is currently assistant professor of Management Science at Korea Advanced Institute of Science and Technology, following a few years as assistant professor of Industrial Engineering at Kyung Hee University, Korea. He received his doctorate from the department of Industrial Engineering and Operations Research, University of California, Berkeley. His research interests are time series and forecasting modelling, Bayesian forecasting and the related software development. He is now teaching time series analysis and econometrics at the graduate level.

  • PDF

의사 솔리드 모델의 절단 및 불리안 작업 개발 (Development the Boolean and Sectioning Operations on Pseudo-Solid Model)

  • 장진우;이상헌;이강수;박상근;허영무;양진석
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 2002년도 춘계학술대회 논문집
    • /
    • pp.715-718
    • /
    • 2002
  • This paper describes the Boolean and sectioning operations on pseudo-solid models. A pseudo-solid model is defined as a sheet body that looks like a solid model but cannot comprise a solid model due to tolerance. Most of CAD models imported from the other CAD system are pseudo-solid models and have to be repaired for further stolid modeling operations. However, healing a pseudo-solid model is a very tedious and cumbersome process. To solve this problem, we devised and implemented the Boolean and sectioning operations on pseudo-solid models. Using these operations, mold and die design can be performed more efficiently, as healing work is reduced greatly.

  • PDF

복합쇼핑몰 개발과정에서 각 사업단계간의 관련성 분석 (Analysis on the Relationship between Each of the Steps in the Complex Shopping Mall Development)

  • 이찬호
    • 디지털융복합연구
    • /
    • 제13권8호
    • /
    • pp.83-89
    • /
    • 2015
  • 본 연구는 복합쇼핑몰 개발에 있어서 각 사업단계(사업기획단계, 분양준공단계, 관리운영단계)들이 개발사업의 전체적 관점에서 일관성 있는 최종 목적을 위해 그 연관관계가 목적달성에 적합하게 이루어지고 있는가에 대한 실태 분석을 목적으로 구조방정식모형을 이용하여 검정하였다. 분석결과 사업기획단계가 분양준공단계에 양의 영향을 미쳐, 성공적 준공 및 분양을 위해서는 사업기획이 충실히 준비되어야함을 알 수 있었다. 그러나 사업기획단계와 관리운영단계 및 성공정도, 분양준공단계와 관리운영단계 및 성공정도, 관리운영단계와 성공정도 간에는 유의수준 0.05하에서 통계적으로 유의한 관련성을 나타내지 않아서 우리나라 복합쇼핑몰 개발에서의 각 사업단계들이 프로젝트 전체적인 관점에서 일관성 있는 목표달성을 위해 긴밀히 연관되지 못하고 각 단계 자체만의 수익창출을 위해 근시안적으로 업무가 수행되고 있다는 점을 보여주었다.

포병진지 구축을 위한 공병장비 최적배정 모형 (Optimum Allocation Model of Military Engineer Equipments for Artillery Position Development)

  • 장영초;이문걸
    • 경영과학
    • /
    • 제34권2호
    • /
    • pp.103-113
    • /
    • 2017
  • The artillery is a key element of the ground forces operation during wartime, and the military engineers support the artillery position development operation to support the smooth operation of the artillery. In establishing the artillery position development operation plan, the commander requires more than his intuition to find the best option reflecting a number of elements of the battlefield situation which changes every minute. Moreover, the number of available equipment is smaller than the number of required position developments, and the effective equipment operation becomes essential element of this issue. This study quantified the capability of the available engineering equipment, organized a number of teams enabling equipment to put out the maximum capacity based on the quantified figures, and formed the model which allocates the team to the developing points to minimize the developing time. The goal programming method was applied to resolve the problem. The developed model was applied to compare the total mission duration following the number of teams, the variable for commander's decision, and the result of this study can be used as the quantitative data for commander's decision making process in establishing the artillery position development support operation through effective equipment management.

수술통합시스템 시뮬레이터 개발과 자동조명시스템의 설계 (Development of simulator for Computer-integrated Robotic Surgery system and Design of its Auto-illumination system)

  • 이수강;정구봉;이병주;김희국
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 학술대회 논문집 정보 및 제어부문
    • /
    • pp.456-458
    • /
    • 2004
  • Recent medical robot systems perform surgery operations, by following the preplanned trajectory and surgical procedures. Depending on the complexity of surgery operations, they are operated in manual, semi-automatic or full automatic mode. To improve the performance of those medical robot systems, development of the simulator and more advanced auto-illumination system, in which intensity of light, direction and focal point can be controlled automatically according to the varied environments during surgical operations. are required. Therefore, in this paper, the simulator for SPINEBOT system which is a computer-intergrated robotic surgery system are developed. And further, an auto-illumination system which will be integrated to the SPINEBOT system is investigated and its preliminary design is described.

  • PDF

Gantry Robot with Extended Workspace for Pavement Sign Painting Operations

  • Hong Daehie;Lee Woo-Chang;Chu Baeksuk;Kim Tae-Hyung;Choi Woo Chun
    • Journal of Mechanical Science and Technology
    • /
    • 제19권6호
    • /
    • pp.1268-1279
    • /
    • 2005
  • The current method for pavement sign marking operations is labor-intensive and very dangerous due to the exposure of workers to passing traffic. It also requires blocking traffic for a long period of time resulting serious traffic jam. This paper deals with the development of a robotic system for automating the pavement sign painting operations. The robotic system consists of gantry frame equipped with transverse drive rail and automatic paint spray system. The workspace of the gantry robot is extended to one-lane width with the transverse rail system. This research also includes the development of font data structures that contain the shape information of pavement signs, such as Korean letters, English letters and symbols. The robot path is generated with this font data through the procedures of scaling up/down and partitioning the signs to be painted depending on the workspace size.

정보시스템 개발방법론 성과에 관한 연구 : 혁신이론 관점으로 (A Study on the Performance of Information System Developmint Methodology : Innovation Theory Perspective)

  • 장윤희;이재범
    • 한국경영과학회지
    • /
    • 제24권4호
    • /
    • pp.27-47
    • /
    • 1999
  • Many enterprises are interested in using the IS development methodologies as a means of increasing system performance and solving the problems of delayed delivery time, excessive budget, and failure of integrated systems. Even if previous researches showed that the system productivity and quality improvement using the system development methodologies are very poor, we tried to find that the methodologies are meaningful as an innovative means for IS performance. We defined that the IS development methodology as a technical and managerial innovation for IS department. We intended to study the relationship between the implementation process of the IS development methodology divided into four steps and IS performance. A cross-sectional field survey with IS departments of domestic companies was conducted, and we used LISREL 8.12a to perform the structural equation model analysis and hypothesis verification. We found the meaningful relationship between the development methodology and qualitative performance. We reconfirmed that the relationship between the development methodology and quantitative performance is not meaningful as expected, which is the same result with the previous researches. But the qualitative performance affects very strongly to the quantitative performance. As a results, we suggest that IS managers and developers keep the principles of the IS development methodologies to get the quantitative performance through the qualitative performance improvement.

  • PDF

A development methodology for heterarchical control of flexible manufacturing systems

  • 한영근
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 1995년도 춘계공동학술대회논문집; 전남대학교; 28-29 Apr. 1995
    • /
    • pp.776-782
    • /
    • 1995
  • This paper presents a methodology for development of a heterarchical control system in Flexible Manufacturing Systems (FMS) environment. A Petri net based model is applied for development of control software. A real-time scheduling methodology for the heterarchical system is also developed and it is used as a software entity in the overall architecture. The partition of generic and specific modules in control software development is emphasized. The control system performs its control tasks in two stages: (1) generation of generic control code and distribution of them to each controller entity prior to system execution; (2) generation of specific control code according to job arrival and its process plan. The control software and the scheduling algorithm are evaluated by a simulation program.

  • PDF