• Title/Summary/Keyword: IS프로세스

Search Result 4,668, Processing Time 0.035 seconds

Design and construction method of an employment support management system for college students - A case study (대학생들을 위한 취업지원관리시스템의 설계 및 구축안-사례 연구)

  • Kim, Jae-Saeng;Kim, Kyung-Hun;Kyung, Tae-Won
    • Journal of Digital Convergence
    • /
    • v.12 no.11
    • /
    • pp.329-338
    • /
    • 2014
  • Today, one of the important factors that determine the university rating is the employment rate. The jobseekers are using online or offline recruiting services in order to get the desired job information. There are lots of employment supporting systems as like web-based employment agencies and University's job centers, but they are focusing more on providing job information rather than on managing the employment support. In addition, those are insufficient to support business process associated with MOU companies, industry field training, mentoring processors, etc., and to continue to manage and to update the information (resume, personal statement, etc.) about the students which the companies want, and the information about the companies which jobseekers want. Therefore, it is required that the employment supporting system which not only storages the initial data (student and corporate information), but also assist the career placement. In this paper, we considered the specific employment rights management features of the existing employment support system, it could receive real-time job information in the smart phone, we presented the design and construction of the system linked to the Bachelor Information System.

The Impact on the Business Performance of CRM System -Using the Balanced Scorecard- (고객관계관리(CRM) 시스템이 경영성과에 미치는 영향 -균형성과표(BSC)를 활용한 성과측정-)

  • Lee, Jae-Sik
    • Management & Information Systems Review
    • /
    • v.29 no.3
    • /
    • pp.97-121
    • /
    • 2010
  • Many enterprises introduce CRM as a new process accessible to customers. And BSC forces managers to focus on balanced measures of business performance that are most critical. The purpose of this study is to find out the determinants of CRM adoption through the analysis which examine the relationship among the key success factors, and business performance using the BSC perspective. This study also gives the suggestion for the effective CRM implementation in the korean companies. This study has been conducted using the data collected from 115 companies implementing CRM. By analyses of the questionnaires, empirical results shows that the implementation of CRM has positive effect on business performance with 4 perspectives of BSC. The contribution of this study is that it provides a conceptual framework and empirical evidence of the causal relationship between key success factors, and business performance with 4 perspectives of BSC concept. This study showed that more consideration are essential to obtain balanced business performance for companies with CRM adoption plan.

  • PDF

Typological Analysis of Sustainable Renovation for Long-term Public Rental Housing (장기공공임대주택의 지속가능한 리모델링 유형 분석)

  • Lee, Ji-Young;Yoon, Young-Ho;Lee, Ji-Eun
    • Land and Housing Review
    • /
    • v.4 no.1
    • /
    • pp.55-63
    • /
    • 2013
  • The remodeling of long-tern public rental housing (LPRH) have been acknowledged followed by the introduction of th Act of the Life Quality Improvement of the Residents in Long-tern Public Housing. Likewise, the feasible direction of LPRH remodeling should be discussed in order to improve the quality of life of the dwellers and housing facilities. Therefore a purpose of this study is to suggest the remodeling types for increasing their quality of life with regard to sustainability of remodeling. To do so this study employs various cases of public housing remodeling from the UK, France and USA and performed quantitative research that was subject to the residents in 9 LPRH in Seoul and Gyeong-gi. The findings of the analysis demonstrate that comprehensive and sustainable remodeling considering both physical and social environment factors are needed, and that the residents have needs of improvement of deteriorated facilities and negative perception of the public on LPRH. With regard to this, seven types of the LPRH remodeling types are drawn on the combination between physical and social environment factors. Thus it is expected that the types will ultimately be able to increase of the quality of the life of the residents and guarantee sustainable remodeling.

A Productivity Analysis Method of Curtain Wall Works Using Construction Simulation (건설 시뮬레이션을 활용한 커튼월 적층공법의 생산성 분석방안)

  • Park, Dong-Geun;Lee, Kyung-Suk;Yu, Byung-In;Kim, Young-Suk;Han, Seung-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.256-261
    • /
    • 2008
  • The curtain-wall work has been more frequently applied in the construction industry since demand of high-rise buildings has been increased. The curtain-wall work is usually performed with the frame work simultaneously for reducing construction period, but it might be delayed because of several problems caused by interference of process. However, there is not an appropriate tool which can be used by a work manager for adjusting quantity of the construction equipments or the workers when the curtain-wall work was delayed. To resolve this problem a construction simulation anticipating and analyzing potential problems before starting the work can be applied in the curtain wall work. This research suggests a general model for the curtain-wall work by using construction simulation and produces a combination of construction equipments and workers which can estimate optimum work productivity.

  • PDF

The Present Status and Vision of Virtual Construction System Development (가상 건설 시스템 개발 현황과 비전)

  • Kim, Jae-Jun;Choi, Cul-Ho;Shin, Hyun-Mok;Jin, Sang-Yoon;Lee, Kwang-Myung
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.170-175
    • /
    • 2008
  • The research team for the virtual construction development was established with the support of Korea Ministry of Construction and Transportation, and KICTEP (Korea Institute of Construction and Transportation Technology Evaluation and Planning). Its aims are to develop system that is to improve productivity & quality, to create a higher value-added business, and to cultivate international competitiveness in the construction industry. The virtual construction system is a design, engineering, and construction management information system that allows the project participants to effectively share the information throughout the construction life cycle with the support of 3D and design information. To achieve this, the research team focuses on developing several systems. First, the team focuses on developing for the pre-planning, the structural engineering, MEP, and the 3D based estimation system. Second, they focus on developing a simulation system for the construction process planning and feasibility study with help of the virtual reality technologies. Third, they focus on developing the CPLM (Construction Project Life-cycle Management) system for managing construction project data, and the decision support system that makes the collaboration among the project participants based on 3D technologies and information. We also focus on developing the SDAI (Standard Data Access Interface), the localized guideline for 3D design, and a training program. In addition, we focus on developing the undeveloped area of the commercial system and building an environment that can support the communication and collaboration in the construction life-cycle rather than developing the existing and commercialized system.

  • PDF

Performance Analysis of Electronic Personal Dosimeter(EPD) for External Radiation Dosimetry (전자개인선량계(EPD)의 외부피폭방사선량 평가 성능분석)

  • Lee, Byoung-Il;Kim, Taejin;Lim, Young-Khi
    • Journal of Radiation Protection and Research
    • /
    • v.40 no.4
    • /
    • pp.261-266
    • /
    • 2015
  • As performance of electronic personal dosimeter (EPD) used for auxiliary personal dosimeter in nuclear power plants (NPPs) has been being continuously improved, we investigated application cases in Korea and other countries and also tested it in NPPs to assess the performance of EPD for external radiation dosimetry. Result of performance tests done in domestic NPPs was similar to those obtained by IAEA in cooperation with EURADOS (IAEA-TECDOC-1564). In addition, EPD/TLD dose ratio has shown similar tendency of EPD/Film-badge dose ratio from the research by the Japan Atomic Power Company (JAPC) and EPD provided more conservative value than TLD or Film-badge. Although some EPD's failures have been discussed, EPD has shown continuous improvement according to the report of Institute of Nuclear Power Operation (INPO) and data from domestic NPPs. In conclusion, It is considered that the general performance of EPD is adequate for external radiation dosimetry compared with that of TLD, providing appropriate performance checking procedure and alternative measures for functional failure.

Absolute Age Determination of One of the Oldest Quaternary(?) Glacial Deposit (Bunthang Sequence) in the Tibetan Plateau Using Radioactive Decay of Cosmogonic $^{10}Be$ and $^{26}Al$, the Central Kavakoram, Pakistan: Implication for Paleoenvironment and Tectonics (방사성 우주기원 동위원소를 이용한 티벳고원에서 가장 오래된 제4기(?) 빙성퇴적물인 Bunthang sequence의 절대 연대측정과 이의 고환경 및 지반운동에 대한 의미)

  • Seong, Yeong-Bae
    • Journal of the Korean Geographical Society
    • /
    • v.42 no.2 s.119
    • /
    • pp.165-176
    • /
    • 2007
  • Absolute age of the deposition of 1.3 km-thick Bunthang sequence within the Skardu intermontane basin of the Central Karakoram was determined using radioactive decay of cosmogonic $^{10}Be$ and $^{26}Al$ burial dating. The Bunthang sequence deposited around 2.65 Ma, which is the oldest glaciation in the region. The timing of deposition of the Bunthang sequence is consistent with the previous suggestion that the basin filling took place between Brunhess and Matuyama chrons. Four major sedimentary facies interfinger within the Bunthang sequence: glacial diamict, lacustrine, fluvial and lacustrine facies upward. This sedimentary distinctiveness and the lack of evidence on the faults for alternative pull-apart basin model around the Bunthang sequence, suggest that the depressional basin was formed by deep subglacial erosion during the exrtensive Bunthang Glacial Stage and subsequently the sediments underlain by basal diamict, was quickly deposited by preglacial and paraglacial processes. Temporary ponding of the Indus River due to tectonic uplift in the downstream or blockage by mass movements might make the basin filing more possible. The hypothesis that the single ice sheet developed on the Tibetan Plateau during the global last glacial cycle should be refuted by the existence of the older extensive Bunthang glacier Furthermore, the extensive glaciation during the early Quaternary (and thus progressive decrease in extent with time) suggests that there may have been significant uplift of the Pamir to the west and Himalaya to the south, which would have reduced the penetration of westerlies and Indian summer monsoon and hence moisture supply to the region.

A Study on the Architecture Modeling of Information System using Simulation (시뮬레이션을 이용한 정보시스템 아키텍쳐 모델링에 관한 연구)

  • Park, Sang-Kook;Kim, Jong-Bae
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2013.10a
    • /
    • pp.455-458
    • /
    • 2013
  • The conventional design of the information system architecture based on the personal experience of information systems has been acted as a limit in progress utilizing appropriate resource allocation and performance improvements. Architecture design depending on personal experience makes differences in variance of a designer's experience, intellectual level in related tasks and surroundings, and architecture quality according to individual's propensity. After all these problems cause a waste of expensive hardware resources. At working place, post-monitoring tools are diversely developed and are running to find the bottleneck and the process problems in the information operation. However, there are no simulation tools or models that are used for expecting and counteracting the problems at early period of designing architecture. To solve these problems we will first develop a simulation model for designing information system architecture in a pilot form, and will verify validity. If an error rate is found in the permissible range, then it can be said that the simulation reflects the characteristic of information system architecture. After the model is developed in a level that can be used in various ways, more accurate performance computation will be able to do, getting out of the old way relying on calculations, and prevent the existence of idle resources and expense waste that comes from the wrong design of architecture.

  • PDF

Design Development Management in the Design-Build Project by Cast-Study (사례 분석을 통한 턴키 프로젝트 실시설계 업무 관리방안)

  • Lee Hwang-Ku;Kim Young-Jae;Kim Kyung-Rai;Park Chan-Sik;Shin Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.128-136
    • /
    • 2003
  • The contractors which execute the design-build project have difficulties in design management and contract administration in the pre-construction phase because they have managed construction projects focused on only construction phase so far. Moreover, they have to manage the design development stage without any contingency following-up various design revisions from the design reviews of outside experts. Therefore, the design management in the design development stage is a critical success facto. of the design-build project. The objective of this study is to structure the problems in the management skill for design development phase in the domestic design-build projects and to suggest a design development management method to settle the problems. To achieve these objectives, this study 1) analyzes the prior studies about the design-build procurement methods, 2) designs and performs a case study to embody the problems of the domestic design-build projects, and 3) proposes a method of design development management by analyzing the results of case study and interviewing experts.

THE ROOT CAUSE ANALYSIS PROCESS FOR SCHEDULE DELAY IN CONSTRUCTION (건설공사의 작업지연 원인분석 프로세스)

  • Ji, Kun-Chang;Kim, Chang-Duk;Yu, Jung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.138-148
    • /
    • 2006
  • In constructing projects, there exist various kinds of work interferences, which cause a delay of the outset and completion of planned schedule because of some attributions, such as variability, uncertainty and complexity, and so schedule delay has been treated as a natural phenomenon. To reduce or prevent the schedule delay, a constant confirmation of schedule delay and a preparation of counter plans for finding out the cause structure of schedule delay should have been done. However, all this time the research has been mostly done on the calculation method or claim cases of schedule delay, and the range of analysis method of the cause structure of schedule delay has been multifarious from industrial views to views of specific work. Moreover, the classifying system and analysis method did not consider the trait, which cause the schedule delay, in constructing projects. For this reason, it is difficult to compare the cause of delay factors of the projects and to understand the effect of schedule delay by each factor. This paper restricts the range of the cause analysis of schedule delay to the field of site management in the projects and divides the cause structure of schedule delay into the cause objects and cause attributes of schedule delay according to the input elements. The system of classifying causes of schedule delay is examined by interviews with experts and questionnaire. Additionally, this paper analyzes the attributes of cause attributes and cause subjects and presents the analysis method and procedure of schedule delay with the application of VSM.