• Title/Summary/Keyword: IMPLEMENTATION PLAN

Search Result 1,284, Processing Time 0.024 seconds

Climate Change Vulnerability Assessment in Rural Areas - Case study in Seocheon - (농촌지역 기후변화 취약성 평가에 관한 연구 - 서천군을 대상으로 -)

  • Lee, Gyeongjin;Cha, Jungwoo
    • Journal of Korean Society of Rural Planning
    • /
    • v.20 no.4
    • /
    • pp.145-155
    • /
    • 2014
  • Since greenhouse gas emissions increase continuously, the authorities have needed climate change countermeasure for adapting the acceleration of climate change damages. According to "Framework Act on Low Carbon, Green Growth", Korean local governments should have established the implementation plan of climate change adaptation. These guidelines which is the implementation plan of climate change adaptation should be established countermeasure in 7 fields such as Health, Digester/Catastrophe, Agriculture, Forest, Ecosystem, Water Management and Marine/Fisheries. Basically the Korean local governments expose vulnerable financial condition, therefore the authorities might be assessed the vulnerability by local regions and fields, in order to establish an efficient implementation plan of climate change adaptation. Based on this concepts, this research used 3 methods which are LCCGIS, questionnaire survey analysis and analysis of existing data for the multiphasic vulnerable assessment. This study was verified the correlation among 7 elements of climate change vulnerability by 3 analysis methods, in order to respond climate change vulnerability in rural areas, Seocheon-gun. If the regions were evaluated as a vulnerable area by two or more evaluation methods in the results of 3 methods' comparison and evaluation, those areas were selected by vulnerable area. As a result, the vulnerable area of heavy rain and flood was Janghang-eup and Maseo-myeon, the vulnerable area of typhoon was Janghang-eup, Masan-myeon and Seo-myeon. 3 regions (i.e. Janghang-eup, Biin-myeon, Seo-myeon) were vulnerable to coastal flooding, moreover Masan-myeon, Pangyo-myeon and Biin-myeon exposed to vulnerability of landslide. In addition, Pangyo-myeon, Biin-myeon and Masan-myeon was evaluated vulnerable to forest fire, as well as the 3 sites; Masan-myeon, Masan-myeon and Pangyo-myeon was identified vulnerable to ecosystem. Lastly, 3 regions (i.e. Janghang-eup, Masan-myeon and Masan-myeon) showed vulnerable to flood control, additionally Janghang-eup and Seo-myeon was vulnerable to water supply. However, all region was evaluated vulnerable to water quality separately. In a nutshell this paper aims at deriving regions which expose climate change vulnerabilities by multiphasic vulnerable assessment of climate change, and comparing-evaluating the assessments.

Feasibility of operating a curriculum for young children aged 0 to 5 years old and training teachers for young children aged 0 to 5 years old according to the early childhood education and care integration implementation plan (유보통합 실행계획안에 따른 0~5세 영유아교육과정 운영 및 0~5세 영유아 교원 양성 타당성)

  • Park, Ji-Hee;Kim, Dae-Wook
    • The Journal of the Convergence on Culture Technology
    • /
    • v.10 no.5
    • /
    • pp.601-608
    • /
    • 2024
  • The integration of early childhood education and care is in progress. Accordingly, it is necessary to develop the curriculum for 0-5 year olds. The implementation plan for the integration of early childhood education and care was announced in June 2024. The operation of the curriculum for 0-5 year olds was proposed. The curriculum for 0-2 year olds and 3-5 year olds is similar in content and was developed with the same standards. It is natural for the two curricula to be combined. When merging the curriculum, it is necessary to consider the content of the curriculum, teacher qualifications, and finances together. As the curriculum for 0-5 year olds is developed, teacher qualifications should also be set as 0-5 year olds teachers. The conclusions of the study are as follows: First, the curriculum should be unified into the curriculum for 0-5 year olds. Next, teachers who will teach the curriculum for 0-5 year olds should be trained as 0-5 year olds teachers.

유조선의 부두 하역 작업시 접지 안전성 연구와 적용

  • Baek, Myeong-Gi;Jo, Won-Cheol;Lee, Tae-Sik
    • 한국방재학회:학술대회논문집
    • /
    • 2008.02a
    • /
    • pp.771-774
    • /
    • 2008
  • This study shows the new findings against a electrical bonding risk between the tanker and the jetty they've generally done. According to this new theory, a new preventive plan will be proposed. Also, a new preventive plan will be shown as the result of practical implementation in which it could guide the same kind of working people.

  • PDF

A Methodology for Global ERP Implementation Based on GSI(Global Single Instance) and Its Application (GSI(Global Single Instance)기반의 Global ERP 구축 방법론 및 적용 사례)

  • Lee, Jae-Kwang;Cho, Min-Ho
    • Journal of Information Technology Services
    • /
    • v.7 no.3
    • /
    • pp.97-114
    • /
    • 2008
  • Many companies have implemented ERP systems to enhance their process competitiveness. Since most ERP systems down to date are implemented and managed on each separated business-unit or company level, such systems run short of the consideration about global business processes and global system managements. In order to integrate a successful global ERP, it is essential to apply the well-systematic implementation methodology which considers global standardization and global IT requirements. It is, however, the actual circumstance that such well-structured methodologies for global ERP implementation are hardly shown not only from domestic site but from foreign one. This paper indicates the global ERP implementation guideline with integrated approach including; the standard process design for efficient execution of global business; the ERP implementation method considering global IT requirements; and, the management method for global system operation. GSI ERP methodology is composed of 3 Phase:Global Strategy Planning, Global Template Construction and Global Roll-Out. Phase1; Global Strategy Planning contains Environment Analysis, GSI direction and Implementation Plan. Phase2; Global Template Construction contains Business blueprint, GSI operation design and Global template implementation. Phase3; Global Roll-out contains local business analysis, local ERP implementation and Global ERP Operation.

A Study on the Business Plan Changes of Housing Complex evaluated by the "Housing Performance Grading Indication System" (주택성능등급표시제도의 개선을 위한 인정 단지의 사업계획변경 현황에 대한 실태조사 연구)

  • Lee, Sung-Ok;Bae, Cheol-Hak
    • KIEAE Journal
    • /
    • v.11 no.6
    • /
    • pp.43-51
    • /
    • 2011
  • This study aims to analyze on the change status in the project plan of the housing complex as evaluated through the Housing Performance Grading Indication System. This a a system for assessing quantitatively the comprehensive, unified performance of housing by an objective standard from the design stage since January 9, 2006. As housing is a composite with various performances, it is required necessary to objectively assess the various performances from the design stage for building better housing. Thus, this study analyzed the change status and objectively described objectively it centering on the construction and structure drawings for 12 items posted in the Facility Management System_(FMS) out of examples recognized by 2011 since the implementation of the system. The changes were analyzed though observing each performance item-specific characteristics and confirming the books approved for use. In various parts, such as the site area, landscape plan, plane plan for unit, supplementary welfare facility plan, finishing materials, window size and location, the project plan was changed. These changes may result in a grading change in of the performance items of the system. This study purpose is for it to be used as a basic resource required for future system development by supplementing the limitation of the design phase and then through playing a basic role for the assessment after completion.

Establishment of Role Between Central and Local Government for Implementation of Total Maximum Daily Load (수질오염총량관리제 시행에 있어서 중앙정부와 지방자치단체 간 역할정립)

  • Yi, Sang-Jin
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.33 no.5
    • /
    • pp.378-383
    • /
    • 2011
  • The policy of total maximum daily load (TMDL) was adopted to manage water pollutants so as to keep the total amount of pollutants in the watersheds within established target water quality. While the TMDL was implemented in all four major river basins, various problems occurred. Even though the corrections for problems were conducted, the role between central and local government was not established exactly. This study was presented to suggest a role between central and local governments for effective implementation of TMDL. When the central government establishes the environmental criteria with water quality standards and pollutants in the main rivers, the local government should establish the level of target pollutants in the watershed. Also, the local government should be continuously implementing the water quality and flowrate monitoring of the tributaries to find out the degree of water quality improvement in the tributaries. Especially, the basic plan of TMDL for the whole watershed should be established by the river basin environmental office at the central government. The local government should be established the implementation plan of TMDL for the watershed where exceeds the established target water quality. The performance assessment of TMDL should be implemented every year to the water quality and flowrate monitoring of the tributaries for satisfaction assessment of target water quality in the watershed by the lower-lever government. The performance assessment report of TMDL included with an analysis of causes for the excess water quality in the watershed should be submitted to the river basin environmental office at the end of the TMDL planning period.

스톡홀름시의 혼잡통행료 징수 체계

  • Byeon, Wan-Hui;Kim, Hui-Sam
    • Transportation Technology and Policy
    • /
    • v.1 no.2
    • /
    • pp.71-84
    • /
    • 2004
  • In Europe, London, Edinbergh, Copenhagen has adopted the traffic congestion charge system, and now the Stockholm City Council started the implementation of a similar system of its own. According to the Swedish National Road Administration, the system implementation starts in 2004 and will be completed by 2005, and so starting 2006, this charge system will be running as planned. Unlike the system of London, that of Stockholm charges the drivers differently depending on when to pass a control point, and not only that, the City Council has a plan to adopt the emerging RFID technology. Following is the summary of both technical and policy-wise considerations of the traffic congestion charge system in Stockholm, Sweden.

  • PDF

A Study on the Determination of Key Issues in the ERP - enabled BPR Implementation in Korea (한국기업의 ERP관리 이슈에 관한 탐색적 연구 -A사의 사례를 중심으로-)

  • 김효근;성종선;강소라
    • Journal of Information Technology Applications and Management
    • /
    • v.9 no.2
    • /
    • pp.81-106
    • /
    • 2002
  • As more organizations undertake IT-enabled business process reengineering(BPR), IT-enabled BPR projects become a major concern. Especially, one of IT, Enterprise Resource Planning System (ERP) is recognized as a revolution solution. But the success cases of ERP project are rarely reported. In this study, ERP implementation is defined as a IS implementation project based on BPR concepts To explore the issues of implementing ERP systems, a company implementing ERP successfully in Korea is selected. The research framework consists of four components: 1) strategic plan dimension , 2) organizational environment dimension, 3) implementation process dimension, and 4) IT dimension. On this framework, to implement ERP systems successfully, the analysis of the results clearly suggests appropriate planning, top management support, change management, appropriate methodology , ERP specialist commitment, management of standard process and master data, and the extent of IT localization.

  • PDF

A Study on Implementation Delay Factors of the Block-unit Housing Renewal Project - Focused on the Incheon Metropolitan City - (가로주택정비사업의 사업시행 지연요인에 관한 연구 - 인천광역시 사례를 중심으로 -)

  • Han, Young Hoon;Na, In Su
    • Journal of KIBIM
    • /
    • v.12 no.4
    • /
    • pp.32-40
    • /
    • 2022
  • The block-unit housing renewal project was presented as an alternative method to overcome the side effects of large-scale renewal projects while improving poor residential conditions. However, projects implementation is prolonged and even the pace of projects, which was considered an various incentives, is being delayed for the most part. In this study, delay factors are drawn by eight; conflict among association members, contract delay of joint implementation, participation paucity of constructor, inadequate project guidelines, alteration of project plan, lack of renewal project professionals, stricter loan restriction of HUG, lack of capacity of project operator. We categorized those eight factors to three aspects such as implementation, participants and proposition and suggested improvement alternatives according to three aspects.

Comparative Case Study on Urban Climate Change Plans (기후변화 대응계획 도시사례 비교연구: 창원시와 포틀랜드시를 대상으로)

  • Choi, Joon-Sung;Park, Cheon-Bo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.1
    • /
    • pp.539-546
    • /
    • 2014
  • The purpose of this paper is to suggest policy implications for the development of climate change plan in city scale. For a comparative case study, Changwon city in Korea and Portland city in U.S.A. were chosen. Climate change plans of both cities were analysed and compared in the perspectives of framework, climate strategies, and implementation. The findings from the comparative case study are suggested for policy implications as the followings. Firstly, the framework should be more simple and clearly integrated from goal to action plans. Secondly, more caution must be exercised for the major GHG triggers and adaptation policy measures. Finally, establishment of clear timeline is the first step of leadership in climate change plan. Coordination agencies and sustainable assessment systems for monitoring each policies are essential for the successful implementation of climate change plan.