• 제목/요약/키워드: IEC Standards

검색결과 516건 처리시간 0.02초

IEC 61400 풍력표준을 적용한 제주도 김녕 난류강도 특성분석 (Analysis on Turbulence Intensity Characteristics at Gimnyeong, Jejudo by Applying IEC 61400 Wind Turbine Standards)

  • 김현구;정태윤;장문석
    • 한국태양에너지학회 논문집
    • /
    • 제30권6호
    • /
    • pp.59-65
    • /
    • 2010
  • Analysis on turbulence intensity profile depending on wind speed is an important process to set up design condition of wind turbine in terms of fatigue load. This paper tests goodness of fit of turbulence intensity empirical equations suggested by the IEC 61400 Standards with Jejudo Gimnyeong met-tower measurement, which is erected at a seashore. Therefore sea breeze and land breeze coexist. Sea breeze case showed apparent increasing trend of turbulence intensity in a high wind speed regime due to increase of sea surface roughness. However, neither inland wind turbine standard IEC 61400-1 nor offshore wind turbine standard IEC 61400-3 fit such a trend adequately. On the other hand, the modified empirical equation of turbulence intensity of IEC 61400-3 derived from Germany FINO1 application study by considering turbulence intensity behavior in a high wind speed regime showed good agreement with the measurement. Therefore, we can reconfirm and conclude that IEC 61400-3 Ed.1 legislated in 2009 needs to be modified.

DWB를 이용한 배전자동화 기반의 전기품질 모니터링 시스템 구축 (Power Quality Monitoring System Using DWB on Distribution Automation System)

  • 강문호;이흥호
    • 조명전기설비학회논문지
    • /
    • 제25권9호
    • /
    • pp.86-93
    • /
    • 2011
  • The necessity of Power Quality(PQ) Management grow bigger because the disturbance strength in power system is increasing, on the other hand, the tolerance of electrical components is reducing with widely use of the IT and digital equipments. The domestic management standards on power quality are enacted based on the IEC standards in recent. Since the IEC standards defines the measurement and evaluation point on PQ as PCC(Point of Common Coupling) which is normally the point of penetration between customer and power company, the PQ monitoring system(PQMS) should be made to measure and manage the PQ of custom effectively. In this paper, therefore, the economical construction plan on PQMS using the wireless communication channel in distribution automation system is suggested, and the usefulness of the PQMS are shown by analyzing the PQM data with IEC standards.