• Title/Summary/Keyword: Hydraulic injection test

Search Result 104, Processing Time 0.024 seconds

Rock Permeability Estimation from Hydraulic Injection Tests in a Sealed Borehole Interval

  • Quach, Nghiep Q.;Jo, Yeonguk;Chang, Chandong
    • The Journal of Engineering Geology
    • /
    • v.28 no.1
    • /
    • pp.1-9
    • /
    • 2018
  • We propose a borehole test technique to estimate permeability of rocks in borehole. The borehole tests are hydraulic injection tests such as leak-off test and hydraulic fracturing tests, which are originally conducted for stress or casing integrity assessment and not for permeability measurement. We use one-dimensional radial diffusion equation to interpret fluid injection test results in terms of permeability. We apply this technique to a leak-off test conducted at a depth of 700 m in a wellbore, where rock formation is mudstone. The estimated permeability is at an order of $10^{-16}m^2$, which is somewhat high but within the range reported for mudstones previously. Quantitative rick assessment suggests that an accurate measurement of open hole section length is important to improve reliability of results. More data may be needed to ensure the reliability of this technique. If validated, however, this technique can provide cost-effective estimation of in situ permeability without conducting independent permeability tests in borehole.

A Study on the River Discharge Measurement Techniques (하천유량 측정기법에 관한 연구)

  • 김성원;지홍기
    • Journal of Environmental Science International
    • /
    • v.7 no.6
    • /
    • pp.793-801
    • /
    • 1998
  • In this study, the Dilution Method is used to measure river discharge through the hydraulic model test. the dilution method is divided into Constant-Rate-Infection Method and Slug-Injection Method in the river discharge measurement techniques. When the dilution method is applied in the hydraulic model flume, it is analyzed that the estimated error of constant-rate-injection method is less than that of the slug-in-jection method, and the result shows that floodflow analysis is more efficient than lowflow analysis as compared observed discharge with calculated discharge. The result of statistical error analysis shows that the constant-rate-injection method is appropriate technique for the measurement of the river discharge. Therefore, the dilution method among the river discharge measurement techniques can be applied for the river basin which can't be measured with current meter or unsteady-flow regime in the urban-small drainage or hydraulic structure equipment area and can be obtained more exact results than any other discharge measurement techniques.

  • PDF

A Study on the Application Method of Artificial Injection Test according to the Hydraulic Conductivity of Aquifer (대수층 수리지질특성에 따른 인공함양시험 적용 방법에 관한 연구)

  • Chae, Dong-Seok;Choi, Jin-O;Jeong, Hyeon-Cheol;Kim, Chang-Yong
    • The Journal of Engineering Geology
    • /
    • v.31 no.4
    • /
    • pp.589-601
    • /
    • 2021
  • Artificial recharge technology is a method for solving problems such as groundwater level drop and ground subsidence caused by groundwater withdrawal. This study investigated the applicability of using the hydraulic conductivity of an aquifer to predict injection test results for aquifer restoration. Pumping and injection tests were performed under the same conditions as those for the artificial injection facility located in Icheon, Gyeonggi-do. The hydraulic conductivity of the aquifer, which plays a decisive role in restoring the groundwater level, was derived from the pumping test. A numerical model of a simplified on-site aquifer was constructed, and a transient analysis was applied with the same conditions as the pumping test. The correlation between the measured and the resulting model values is strong (R2 = 0.78). The injection test was performed in a sedimentary layer composed of silt sand and clay sand. From the results of the injection test, an empirical formula was derived using Theim's formula, which is a common well analysis solution to determine the parameters of the aquifer from time-level data. The model values from the empirical formula have a high degree of correlation (R2 = 0.99) with measured values. Under specific conditions, for areas where it is difficult to conduct an injection test, the formula from this study, which relies on the hydraulic conductivity of the aquifer determined through the pumping test, may be used to predict reliable injection rates for groundwater restoration.

A Study on Injection and Combustion of D.I. Diesel Engine with Electronic-hydraulic Fuel Injection System (전자유압식 분사계를 갖는 D.I. 디젤기관의 분사 및 연소에 관한 연구)

  • Kim, Hyun-Gu;Ra, Jin-Hong;Ahn, Soo-Kil
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.9 no.1
    • /
    • pp.83-97
    • /
    • 1997
  • Diesel engine is widely used for ship and industry source of power because of its high thermal efficiency and reliability and durability. However it lead to air pollution due to exhaust gas, and it is important to develop diesel engine of lower air-pollution to decrease the hazardous exhaust gas emissions. As one of the ways, the study for practically using the high pressure of fuel injection and variable injection timing system is being processing. The high pressure injection, which is said to be an effective means for reducing both NOx and particulate emissions, and great improvements in combustion characteristics have been reported by many researchers. In this study, electronic-hydraulic fuel injection system and hydraulic fuel injector system have been applied to the D.I. test engine for high pressure injection and variable injection timing. The injection pressure and injection rate depending upon accumulator pressure were measured with strain gage and Bosch injection rate measuring system before fitting the system into test engine, and analyzed the characteristics of the injection system. The combustion characteristics with this injection system has been analyzed with data concerning heat release rate, pressure rising rate, ignition point, ignition delay and maximum pressure value.

  • PDF

Developement of Simulation Model for Analysis of Hydraulic Systems in Injection Molding Machine (1) (사출성형기 유압시스템 분석용 시뮬레이션 모델 개발 (1))

  • 신성철;박영진;김진영;이강걸
    • Journal of the Korea Society for Simulation
    • /
    • v.11 no.4
    • /
    • pp.25-32
    • /
    • 2002
  • Hydraulic systems of injection molding machine are modelled and simulated with AMESim which is a commercial program. Detail models of hydraulic components are simulated and simulation results are evaluated with maker's test results in catalog. Sub system models which is divided according to functional operation are made and its analysis results shows how design parameters work on operational characteristics like cylinder speed, cylinder displacement, pressure, flow rates at each node and so on. Total circuit model is also made and analyzed. The prediction made by simulation will be used design of hydraulic systems of injection molding machine.

  • PDF

A Comparative Study on the Impermeability-reinforcement Performance of Old Reservoir from Injection and Deep Mixing Method through Laboratory Model Test (실내모형시험을 통한 지반혼합 및 주입공법의 노후저수지 차수 보강성능 비교 연구)

  • Song, Sang-Huwon
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.24 no.2
    • /
    • pp.45-52
    • /
    • 2022
  • Of the 17,106 domestic reservoirs(as of December 2020), 14,611 are older than 50 years, and these old reservoirs will gradually increase over time. The injection grouting method is most applied to the reinforcement method of the aging reservoir. However, the injection grouting method is not accurate in uniformity and reinforced area. An laboratory model test was conducted to evaluate the applicability of the deep mixing method, which compensated for these shortcomings, as a reservoir reinforcement method. As a result of calculating the hydraulic conductiveity for each method through the model test results, the injection grouting method was calculated as a hydraulic conductiveity value that was about 7.5 times larger than that of the deep mixing method. As a result of measuring the water level change in the laboratory model test, it was found that the water level change decreased in the injection method and deep mixing method compared to the non-reinforcement method. In addition, deep mixing method showed a water level change of about 15% based on 40 hours compared to the injection method, indicating that the water-reducing effect was superior to that of the injection method.

Integral effect tests for intermediate and small break loss-of-coolant accidents with passive emergency core cooling system

  • Byoung-Uhn Bae;Seok Cho;Jae Bong Lee;Yu-Sun Park;Jongrok Kim;Kyoung-Ho Kang
    • Nuclear Engineering and Technology
    • /
    • v.55 no.7
    • /
    • pp.2438-2446
    • /
    • 2023
  • To cool down a nuclear reactor core and prevent the fuel damage without a pump-driven active component during any anticipated accident, the passive emergency core cooling system (PECCS) was designed and adopted in an advanced light water reactor, i-POWER. In this study, for a validation of the cooling capability of PECCS, thermal-hydraulic integral effect tests were performed with the ATLAS facility by simulating intermediate and small break loss-of-coolant accidents (IBLOCA and SBLOCA). The test result showed that PECCS could effectively depressurize the reactor coolant system by supplying the safety injection water from the safety injection tanks (SITs). The result pointed out that the safety injection from IRWST should have been activated earlier to inhibit the excessive core heat-up. The sequence of the PECCS injection and the major thermal hydraulic transient during the SBLOCA transient was similar to the result of the IBLOCA test with the equivalent PECCS condition. The test data can be used to evaluate the capability of thermal hydraulic safety analysis codes in predicting IBLOCA and SBLOCA transients under an operation of passive safety system.

Manufacture of Apparatus for Coolant Mix Performance Test (냉각제 혼합성능 시험용 장치의 제작)

  • Ku, Hyoun-Kon;Bae, Young-Gwan;Kim, Jin-Hee
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.21 no.2
    • /
    • pp.73-78
    • /
    • 2022
  • The test apparatus that can be protected from the high-temperature combustion flame and coolant injection was successfully manufactured. In this study, the coolant-injection module had a controllable consistent pressure, and the entire combustion module was protected using a nonflammable composite liner. Every flange was designed in accordance with the DIN standard, and the entire body of the module was designed in accordance with the EN 13445 code. Additionally, the hydraulic pressure test was performed in accordance with the 2014/68/EU directive and EN 13445 standard. Finally, after manufacturing, performance tests (such as pressure tests) were conducted to verify the reliability and safety.

Experimental Study of SBLOCA Simulation of Safety-Injection Line Break with Single Train Passive Safety System of SMART-ITL (SMART-ITL 1 계열 피동안전계통을 이용한 안전주입배관 파단 소형냉각재상실사고 모의에 대한 실험적 연구)

  • Ryu, Sung Uk;Bae, Hwang;Ryu, Hyo Bong;Byun, Sun Joon;Kim, Woo Shik;Shin, Yong-Cheol;Yi, Sung-Jae;Park, Hyun-Sik
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.40 no.3
    • /
    • pp.165-172
    • /
    • 2016
  • An experimental study of the thermal-hydraulic characteristics of passive safety systems (PSSs) was conducted using a system-integrated modular advanced reactor-integral test loop (SMART-ITL). The present passive safety injection system for the SMART-ITL consists of one train with the core makeup tank (CMT), the safety injection tank, and the automatic depressurization system. The objective of this study is to investigate the injection effect of the PSS on the small-break loss-of-coolant accident (SBLOCA) scenario for a 0.4 inch line break in the safety-injection system (SIS). The steady-state condition was maintained for 746 seconds before the break. When the major parameters of the target value and test results were compared, most of the thermal-hydraulic parameters agreed closely with each other. The water level of the reactor pressure vessel (RPV) was maintained higher than that of the fuel assembly plate during the transient, for the present CMT and safety injection tank (SIT) flow rate conditions. It can be seen that the capability of an emergency core cooling system is sufficient during the transient with SMART passive SISs.

Estimation of the Effective Hydraulic Conductivity in the Granite Area as an Equivalent Continuum Medium (등연속체매질로서의 화강암지역의 유효수리전도도 산출)

  • 김경수;김천수;배대석
    • The Journal of Engineering Geology
    • /
    • v.12 no.3
    • /
    • pp.319-332
    • /
    • 2002
  • This study is focused on the characterization of an effective hydraulic conductivity in each hydrogeologic unit assumed as an equivalent continuum medium in the granitic area. Four boreholes of 3" diameter were installed and a Multi-packer system was facilitated in the selected borehole. Various in-situ tests including the fracture logging, constant injection and fall-off tests, slug and pulse tests were carried out. A hydrogeologic unit was defined into the upper and lower zones based on the variation of fracture properties and hydraulic conductivities. The difference of the result obtained by the various hydraulic tests and the effective characterization techniques on rock mass permeability are also discussed. The effective hydraulic conductivity of the upper unit was measured by two times(5.27E-10 m/s~7.57E-10 m/s) that of the lower unit(2.45E-10 m/s~6.81E-10 m/s)through the constant injection and fall-off tests.