Historical archived traffic data management system enables a long term time-series analysis and provides data necessary to acquire the constantly changing traffic conditions and to evaluate and analyze various traffic related strategies and policies. Such features are provided by maintaining highly reliable traffic data through scientific and systematic management. Now, the management systems for massive traffic data have a several problems such as, the storing and management methods of a large volume of archive data. In this paper, we describe how to storing and management for the massive traffic data and, we propose methodology for logical and physical architecture, collecting and storing, database design and implementation, process design of massive traffic data.
본 연구는 공공시설과 교육시설을 대상으로 시설관리자의 효율적인 유지관리 업무수행과 유지관리 주체 간의 원활한 정보교환을 위한 웹기반 건축물 유지관리 이력정보관리 시스템 개발을 목적으로 한다. 시설 노후화와 성능판단의 근거로 활용할 수 있는 유지관리 이력정보 관리과정상 발생하는 문제점을 인식하고 각 시설의 시설관리 담당자 면담조사를 통하여 시설별 유지관리 이력관리 현황을 분석하여 이를 근거로 통합 유지관리 업무프로세스를 도출하였다. 또한 시설관리 전문가 집단의 요구사항을 수렴하여 공공시설과 교육시설의 특성을 반영한 유지관리 업무 수행 효율화를 극대화와 현장실무적용, 유지관리 이력DB의 활용을 유도할 수 있는 건축물 유지관리 이력정보관리 시스템을 제안한다.
Construction industry is faced with the problems such as the quickly changeable circumstance and increasing construction companies due to regulation mollification of company registration. In order to overcome these problems, new estimation system based on historical estimation cost is ready to introduce by government step by step. But the time of transition for estimation system causes another problems such as chaos addition to simultaneity of a standard of estimation system and new estimation system, lack of related regulation, accumulation of historical extensive cost data, and adjustment methodology when historical estimation data is applied to next projects. The purpose of this study is to suggest the change factors by activities for estimating historical cost for apartment housing projects. New estimation system is based on historical construction data. For application of this system, the standard adjustment methodology system is necessary. and extensive cost data should be accumulated under an unified construction work classification system. Therefore in this study, according to the construction work classification system, every apartment housing project was classified to 16 work classifications, and 7 major composed items which occupy more than 85% of construction costs are analyzed by detailed activities and by average ratio and maximum ratio each of them. In the result of the study, furniture work, foundation work and masonry work are the works which have big gap of costs between average ration and maximum ratio. In addition to suggestion of change factor by work species, 5 qualified construction specialists are interviewed and change factors in 7 major works are analyzed.
새로운 지식창출 수단으로서의 집단지성은 인터넷 시대의 핵심 화두가 되고 있다. 그러나 집단지성이 모든 부분에서 유용한 것은 아니다. 이 논문에서는 집단지성을 활용하여 흩어져 있는 역사 자료를 수집하고 원형을 복원하는 부분에 초점을 맞추어 그 복원 가능성 및 복원 과정에서 참여자의 가치관과 이해관계에 따른 왜곡 가능성을 최소화 할 수 있는 방안을 살펴보았다. 역사 자료를 복원하는 것은 역사 연구뿐만 아니라 역사적 사실을 밝히는 기초가 된다. 과거에는 이것이 열정을 가진 몇 몇 연구자 개인의 역량에 많은 부분을 의존하였다. 때문에 연구의 진척이 느릴 뿐 아니라 복원되어 축적되는 정보의 양에도 한계가 있을 수밖에 없었다. 또한 그 결과를 검증하기도 쉽지 않았다. 그러나 인터넷을 통해 수많은 연구자 및 관심 있는 일반인들이 사료의 복원이라는 하나의 주제에 협업을 할 수 있게 됨으로써 역사 자료의 복원은 양과 질 면에서 더욱 탄력을 받을 수 있는 환경이 되었다. 이 논문에서는 이러한 다수의 협업에 의한 사료 복원 사례로 한국역대인물종합정보DB의 무과 급제자 정보 복원 과정을 고찰하였다. 고찰해 본 결과 이용자들은 자료의 직접 제공, 자료 소장처 제보, 자료 내용 속의 급제기록 제보 등의 방법으로 참여하여 흩어져 있던 상당수의 사료를 복원하였고, 복원된 사료의 정확성도 매우 신뢰할 수 있음을 확인 하였다. 그리고 이 복원 과정이 더욱 효율적으로 이루어지기 위해서는 이용자들의 적극성, 운영자의 전문성, DB의 신뢰성이 덧붙여져야 함을 확인하였다.
무선 센서 네트워크는 공간상에 분포되어 거의 무제한적이고, 연속적으로 데이터를 발생시키며, 주로 샘플링이나 시놉시스 등을 이용하여 수집되는 데이터를 저장한다. 그러나 이러한 방법은 원시 데이터의 정확한 저장 및 장기간 수집된 이력 데이터로부터의 분석을 요구하는 응용환경에는 적합하지 않다. 따라서 이 논문에서는 센서로부터 수집된 데이터를 손실 없이 저장하는 동시에 시간에 따라 누적되는 센서 데이터의 이력을 효율적으로 관리할 수 있는 저장 기법을 제안한다. 제안된 방법에서는 센서의 측정값이 변경된 시점을 기준으로 동일한 값이 지속된 기간을 Time-segment와 Time- point로 저장한다. 이러한 방법은 센서의 모든 측정값을 정확하게 저장할 수 있고, 특정 시간에 걸쳐 중복되는 데이터들을 하나의 튜플에 저장하기 때문에 장기간 동안 수집된 데이터를 메모리에서 유지할 수 있다.
Estimating the productivity of labor has relied on the experience and intuition of an estimator, or productivity data, such as standard in practical estimation. However, when new technologies and new construction methods employed in the construction industry, Dependence of a quantity surveyor's intuition is increased. This is because of the lack of a systematic methodology which models, estimates, and measures the labor productivity, Due to the historical productivity data is unavailable. Even thought project history data contains information that is important to predict the performance of a project, It can not provide valuable information to model, estimate, and measure the labor productivity. This is because 1) the absence of the productivity measurement system with consistency, 2) the difficulty of reusability of historical data collected. Therefor, this study suggests a methodology which build a productivity model by measuring the productivity of labor and collecting the historical data systematically. In addition, this methology is applied to develop a productivity model of shop-drawing and manufacturing process using descrete event simulation.
There are many factors that affect the wind speed. In addition, the randomness of wind speed also leads to low prediction accuracy for wind speed. According to this situation, this paper constructs the short-time forecasting model based on the least squares support vector machines (LSSVM) to forecast the wind speed. The basis of the model used in this paper is support vector regression (SVR), which is used to calculate the regression relationships between the historical data and forecasting data of wind speed. In order to improve the forecast precision, historical data is clustered by cluster analysis so that the historical data whose changing trend is similar with the forecasting data can be filtered out. The filtered historical data is used as the training samples for SVR and the parameters would be optimized by particle swarm optimization (PSO). The forecasting model is tested by actual data and the forecast precision is more accurate than the industry standards. The results prove the feasibility and reliability of the model.
Communications for Statistical Applications and Methods
/
제13권3호
/
pp.685-699
/
2006
Commercial banks and other related areas have developed internal models to better quantify their financial risks. Since an appropriate credit risk model plays a very important role in the risk management at financial institutions, it needs more accurate model which forecasts the credit losses, and statistical inference on that model is required. In this paper, we propose a new method for estimating a default rate. It is a Bayesian approach using the power prior which allows for incorporating of historical data to estimate the default rate. Inference on current data could be more reliable if there exist similar data based on previous studies. Ibrahim and Chen (2000) utilize these data to characterize the power prior. It allows for incorporating of historical data to estimate the parameters in the models. We demonstrate our methodologies with a real data set regarding SOHO data and also perform a simulation study.
지능형 교통체계는 실시간 교통자료를 수집하고 방대한 양의 이력자료를 축적한다. 그러나 방대한 이력자료는 효율적으로 관리/이용되지 않고 있는 실정이다. ADMS와 같은 자료관리시스템이 도입되면서, 이력자료의 잠재적 활용성은 급격히 증대되고 있다. 그러나 자료관리스템의 교통자료는 다량의 누락자료를 포함하고 있다. 누락자료는 장기간에 걸쳐 빈번하게 교통자료를 이용할 수 없게 하기 때문에, 이력자료를 활용하는데 있어 주된 장애요인 중 하나이다. 따라서 누락자료 추정기법은 자료관리시스템에서 주요한 역할을 수행하게 된다. 이러한 한계를 극복하기 위하여, 본 연구에서는 자료관리스템에 탑재가 용이하며 이력자료에 포함된 누락자료를 추정하기 위한 누락자료 추정모형을 개발하였다. 개발모형은 비모수회귀식(NPR)을 기반으로 개발되었으며, 이력자료의 다양한 교통자료 패턴을 이용하고 현실적인 요구사항(변수 최소화, 연산속도, 다양한 형태의 누락자료 보정, 다중대체)을 충족하도록 설계되었다. 모형의 평가는 다양한 누락자료 형태의 상태에서 수행되었으며, 자료관리시스템에 탑재되기 위해 요구되는 정확도, 연산 수행속도에서 기존에 보고된 모형보다 우수한 성능을 보였다.
본 연구는 간헐 수문사상인 시간강수계열의 구조적 특성을 고찰하여 강수발생의 군집성을 고려한 강수발생과정에 대한 추계학적 모의발생 모형을 개발한 것이다. 먼저 강수사상의 발생패턴을 기술하기 위해 Poisson 군집과정을 사용하였고, 이 과정에서 군집간의 시간과 군집내의 사상 수는 지수분포로 기술하였다. 둘째로 사상의 지속기간과 군집내에서 사상간의 시간은 음대수혼합분포로 기술하였다. 마지막으로 이상과 같은 시간강수사상의 발생패턴과 사상기간내의 강수의 종속구조를 구명하기 위해 서울을 대상으로 하여 실적강수자료를 분석하였다. Monte Carlo 모의결과는 모형이 강수발생의 계절적 패턴, 사상특성의 주변 및 조건부 분포를 잘 재현하고 있음을 보여주었다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.