Construction of Time - Cost Model for Building Projects in Vietnam

  • Long, Le-Hoai;Lee, Young-Dai;Cho, Jeong-Wook
    • 한국건설관리학회논문집
    • /
    • 제10권3호
    • /
    • pp.130-138
    • /
    • 2009
  • Bromilow's time-cost (BTC) relationship was examined for building projects in Vietnam using actual construction time and total construction cost. Data set was collected from 77 historical building construction projects completed between 1999 and 2005 which were adjusted by consumer price index (CPI) to 2000 price. Time-cost equations were specified respected to two sectors, public and private, in Vietnamese construction industry and all cases. It is shown that a public funded building project has the longer construction duration than a similar budget private funded project. The resulting models are statistically significant. The adjusted R-square coefficients of all cases, public and private projects models are respectively 0.403, 0.436 and 0.377 mean that the BTC regression lines moderately fit the data set.

공사규모에 따른 공공건축물 공사비의 산정방법 (Cost Estimating Method of Public Building Construction through Construction Scale)

  • 임진호;박준모;김옥규
    • 한국건축시공학회지
    • /
    • 제15권3호
    • /
    • pp.307-316
    • /
    • 2015
  • 공공건축물공사의 실적공사비제도에서 공사규모에 대한 건축공사비 차이가 크게 나타나므로, 산정방식에서 많은 문제점으로 제기된다. 이에 공사규모에 따라서 선별적, 차등적으로 적용할 예측모형의 개발이 필요하다. 이에 본 연구는 조달청에서 2011~2012년에 발주한 이미 준공된 42개 현장의 실적자료에서 공사규모 $5,000m^2{\sim}20,000m^2$으로 선정하여, 회귀분석을 통해서 추정된 모형을 도출하였다. 이를 근거로 신규공사에 적용하여 검증함으로써 합리적인 건축공사비 예측모형을 제시하였다.

건설공사비지수의 산정을 위한 수량기반 기준시점 가격지수의 개발 (Development of Quantity based Base Period Price Index(QBPPI) to calculate Construction Cost Index)

  • 박성철;구교진;현창택
    • 한국건설관리학회논문집
    • /
    • 제7권5호
    • /
    • pp.77-84
    • /
    • 2006
  • 지수는 여러 산업분야에서 오랜시간 동안 경제지표 또는 성과지표로서 중요한 역할을 담당해 왔으며, 실적공사비 적산방식이 적용 확대됨에 따라 2004년 2월부터 시간에 대한 보정을 위하여 건설공사비지수를 사용하고 있다. 건설공사비지수를 산출하기 위한 구성요소는 지수산정식과 자료원으로 구분된다. 기존의 건설관련 공사비지수에서는 물가지수산정에 사용하는 라스파이레스(Laspyeres)지수를 산정식으로 적용하고 산업연관표, 공사비 내역서를 사용하여 가중치를 산정하였다. 그러나, 기존의 방법은 물가변동이 중복 적용되고 대상프로젝트의 특성을 효과적으로 반영하지 못하는 문제점이 발생된다. 본 연구에서는 라스파이레스지수를 비롯한 기존 지수 산정식들을 분석하고, 공동주택공사의 사례를 통하여 기존 지수산정식 및 자료원의 적정성을 분석한 후, 건설공사의 특성을 효율적으로 반영하고 물가변동을 반영할 수 있는 새로운 지수를 제안한다.

공간단위 공사비 산정방법에 관한 연구 - 공종별 공사비의 공간정보 부재로 인한 한계점 개선을 중심으로 - (A Study on the Cost Estimating Method based on Spatial Unit Focused on Improving Limitation Caused by Lack of Spatial Information of the Cost Based on Work Type)

  • 이기상
    • 한국건설관리학회논문집
    • /
    • 제12권3호
    • /
    • pp.131-139
    • /
    • 2011
  • 본 연구는 공공시설공사에서 VE의 코스트모델과 공사현장의 진도관리, 그리고 공사비 분쟁에서 공간정보의 부재로 인한 공종별 공사비 내역 정보의 한계를 인식하고, 이를 극복하기 위하여 공사비의 인식체계를 공간단위로 전환하는 개선 방안의 하나로 제안하는 건축물 세부공간단위의 공사비 원가계산방법에 관한 것이다. 본 연구를 통해 제시한 공간단위의 공사원가 산정 시스템은 공사비를 구성하는 모든 공간 단위에서, 모든 공종, 공종을 구성하는 모든 자재, 노무 및 모든 비용 항목에 대한 정밀하고도 다차원적인 파악이 가능하게 하는 것이다.

공종별 특성을 고려한 대·소규모 공사의 실적공사비 비교 및 보정방안 (A Compensation Method and Comparative Analysis of Historical Unit Price Considering Work Types for Large and Small-Scale Projects)

  • 홍성호;이동욱
    • 대한토목학회논문집
    • /
    • 제34권1호
    • /
    • pp.293-303
    • /
    • 2014
  • 현재 실적공사비 단가는 한국건설기술연구원에 의해 발표되고 있으며, 대규모 공사에서 수집된 공사비 자료를 분석하여 작성되고 있다. 따라서 소규모 공사의 경우 현행 실적공사비 단가를 적용함에 있어 불합리한 문제점이 발생하고 있다. 이러한 문제점을 분석하기 위해, 본 연구에서는 대 소규모 토목, 건축, 기계설비공사에 대한 실적공사비를 상호 비교하였다. 그 결과, 소규모 공사의 실적공사비는 대규모 공사에 비해 평균적으로 26.6%가 높음을 확인할 수 있었다. 한편, 노무비에 의한 대 소규모 공사의 실적공사비 차이는 18.4%이고, 재료비 경비에 의한 차이는 8.18%인 것으로 분석되었다. 또한 본 연구에서는 이를 시정하기 위한 소규모 공사의 실적공사비 보정방안을 제안하였다.

오브젝트-파라미터 통합 오피스 마감공사비 개산견적 모델 (Object-Parameter Integrated Schematic Estimation Model for Predicting Office Building Interior-finishing Costs)

  • 박성호;구교진;박성철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2008년도 추계 학술논문 발표대회
    • /
    • pp.159-165
    • /
    • 2008
  • For deciding the profitability and feasibility of the construction project, the schematic estimation has to not only link the design decision-making but also estimate the cost with reliability. The Object-based schematic estimation system was developed for easily linking with design-making and supports to evaluate the design alternatives in the design development stage but didn't consider the cost estimated by object supplementary and parameter work item. This research presents the Integrated Object-Parameter Schematic Estimation Model in the design development stage that can lead to more accurately estimate the cost through analyzing historical data from the high-storied office buildings. For the development of the proposed model for schematic estimation, after analyzing and classifying the work items from the Bills of Quantities(BOQs) and drawings of historical data, this research proposed the methods of estimating cost in accordance with attributes of each work item using regression analysis. In addition, a case study is performed for the effectiveness as comparing the proposed model with the previous estimating model.

  • PDF

공동주택 건설공사의 표준품셈과 실투입 노무량 비교 분석 - 미장, 방수, 조적, 타일공사를 중심으로 - (Comparison between Labor Inputs by Quantity per Unit Method and by Actual Data Method in the Apartment Housing Construction Work - Focusing on Masonry Plaster Waterproofing Tile Labors -)

  • 전상훈;구교진
    • 한국건설관리학회논문집
    • /
    • 제16권1호
    • /
    • pp.110-118
    • /
    • 2015
  • 표준품셈은 우리나라 건설공사에 있어 가장 기본적인 요소이지만, 표준품셈이 공동주택 건설공사에서 실제 투입 되는 노무량과 큰 차이를 나타내고 있다. 따라서 실적공사비방식에 의해 공사비를 산정하는 것이 합리적인 대안이 될 수 있으나 원가계산서상에 각종 경비 등에는 정확한 노무량을 파악하여야 비용이 산출될 것이며 공사 진도 관리를 위해 투입 노무량을 정확히 파악할 필요가 있다. 본 연구는 2000년 이후 준공 된 수도권에서 공동주택 건설공사에서 표준품셈과 실투입 노무량을 조사하여 비교한 결과 다음과 같은 결과를 얻을 수 있었다. 실제 투입 노무량은 조적공 1.184인/천매, 미장공 0.048인/$m^2$, 방수공 0.039인/$m^2$, 타일공 0.059인/$m^2$이다. 표준품셈 대비 투입율은 보면 조적공 59.8%, 미장공41.3%, 방수공 31.5%, 타일공 34.3%이다. 방수공의 투입 비율이 가장 낮고 조적공이 비교적 높았다. 따라서 우리나라 공동주택 건설공사의 노무량은 실적공사비를 토대로한 원가계산이 바람직하지만, 공사관리에서 노무량이 주요 변수인 만큼 실제에 근접한 표준품셈을 지속적인 보완이 필요할 것으로 보인다.

공공아파트 실적데이터 기반의 지역지수 산정 모델 개발 (Development of a Calculating Model for Local Index Based on Historical Data of Public Apartment Buildings)

  • 임대희;이승훈;서용칠
    • 한국건축시공학회지
    • /
    • 제10권2호
    • /
    • pp.75-80
    • /
    • 2010
  • 국내 주택건설시장은 가격 경쟁의 심화와 함께 형태 구조적인 다양화가 동반되어 사업의 불확실성이 증가하고 있다. 이로 인해 건설사업 기획단계의 중요성이 강조되고 있으며, 점점 더 높은 정확도를 가진 개산견적을 요구하고 있다. 현재 초기 기획단계의 공사비 산정에 관한 연구나 프로그램 개발이 다수 이루어지고 있으나, 지역성을 고려하여 결과를 도출한 경우는 많지 않다. 비용 산정 시 지역적 보정이 함께 이루어진다면 보다 정확한 비용 추정이 가능하고, 이는 곧 성공적인 프로젝트 수행에 큰 역할을 할 수 있을 것이다. 따라서 본 연구의 목적은 공공아파트 실적데이터를 기반으로 하여 지역지수 산정 방법론 및 산정 모델을 구축하고, 공사비 추정 시 활용할 수 있는 지역지수를 도출하는 것이다.

정부공사 건설 사업관리 용역의 대가 산정에 관한 연구 (A study on the estimate of construction management cost for public construction project in the CM for fee contract)

  • 정재영;윤태권
    • 한국건축시공학회지
    • /
    • 제6권3호
    • /
    • pp.115-122
    • /
    • 2006
  • This study is aimed to get clear model for CM fee level in public construction project. For the practical use and main target, CM for fee contract only is assessed and analysed. Cost estimate by percentage of total contract sum and method based on the historical construction data have significant deficiency. An regression model and probabilistic model are suggested with 9 independent variables. In the case of limited work scope, an element based floor area model is suggested and concluded with fish-bone scheme.

시계열을 이용한 실적단가 예측방안에 관한 연구 (A Study on the Time Series Analysis of the Actual Unit Cost based on the Bid Prices)

  • 박원영;서종원;강상혁;최봉준
    • 한국건설관리학회논문집
    • /
    • 제10권4호
    • /
    • pp.50-57
    • /
    • 2009
  • 공공 건설사업의 계약에 있어 합리적이며 적정한 예정가격의 산정이 가장 중요한 요소라 할 수 있다. 공공 공사 예정가격 산정 근거로 사용되어 온 표준품셈과 더불어 실적공사비 제도를 단계적으로 확대 도입키로 했다. 본 논문에서는 과거에 낙찰되었던 계약단가 뿐 아니라 모든 입찰단가 자료를 활용하여 산출한 실적단가의 변동패턴을 분석하여 예측하는 일련의 절차 및 방법론을 제시하였다. 본 연구에서는 신뢰성 있는 자료 확보를 위해 저가입찰 등과 같은 전략적 입찰단가를 제거한 실적단가를 활용하여 시계열 자료를 구성하여 이 시계열을 웨이블릿 분석을 통해 변동 패턴과 추세를 파악하고 신경망을 이용하여 공사비를 예측하는 방안을 주요하게 다루고 있다. 건설 공사비는 매우 다양한 특성을 내포하고 있으므로 그 예측이 어려울 뿐만 아니라 그 오차 또한 매우 클 것으로 예상된다. 이에 본 연구에서는 웨이블릿 변환을 통하여 다양한 특성의 변동을 찾아내어 이를 예측에 이용함으로써 예측력을 높이고자 하였다. 다만 시계열이 매우 단기간의 자료로 구축되어 변동의 양상이 정확하게 분석될 수 없었으나 지속적으로 실적공사비 자료기 축적되어 장기간의 자료를 바탕으로 시계열이 구축된다면 향후 수행될 건설사업의 기획 시 개략적인 공사비 산출에 참고할수 있는 유용한 자료로 활용될수 있을 것이다.