• Title/Summary/Keyword: Historical Construction Cost

Search Result 98, Processing Time 0.037 seconds

Comparative Analysis on Unit Price based on Historical Cost Data Estimating for Large and Small-scale Civil Engineering Works (대·소규모 토목공사의 실적공사비 비교 분석)

  • Hong, Sung Ho;Shin, Juyeoul;Kim, Chang Hak;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1707-1718
    • /
    • 2013
  • Historical cost data estimating system has been introduced since 2004 in the construction industry. Based on contract prices of past projects, this estimating system estimates construction cost according to work types. The Korea Institute of Construction Technology (KICT) announces the historical cost data twice a year annually. The unit price of a small construction project is higher than large construction project due to the increase on production cost per work unit, equipment and labor cost, etc. However, the historical cost data estimating system is applied to project estimation uniformly regardless the construction project's size. This study compared and analyzed the historical cost data of large and small construction project to indicate the problem of historical cost date estimating system. The study derived that the unit price of a small construction project is 21.8% higher than that of large construction project.

A Study on the Change Factors by Activities for Estimating Historical Cost on Apartment Housing Projects (공동주택 실적공사비 산정시 공종별 변동요인에 관한 연구)

  • You, Yong-Hwan;Lee, Kyoo-Hyun;Kim, Chong-Woen;Choi, In-Seung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.4
    • /
    • pp.117-126
    • /
    • 2004
  • Construction industry is faced with the problems such as the quickly changeable circumstance and increasing construction companies due to regulation mollification of company registration. In order to overcome these problems, new estimation system based on historical estimation cost is ready to introduce by government step by step. But the time of transition for estimation system causes another problems such as chaos addition to simultaneity of a standard of estimation system and new estimation system, lack of related regulation, accumulation of historical extensive cost data, and adjustment methodology when historical estimation data is applied to next projects. The purpose of this study is to suggest the change factors by activities for estimating historical cost for apartment housing projects. New estimation system is based on historical construction data. For application of this system, the standard adjustment methodology system is necessary. and extensive cost data should be accumulated under an unified construction work classification system. Therefore in this study, according to the construction work classification system, every apartment housing project was classified to 16 work classifications, and 7 major composed items which occupy more than 85% of construction costs are analyzed by detailed activities and by average ratio and maximum ratio each of them. In the result of the study, furniture work, foundation work and masonry work are the works which have big gap of costs between average ration and maximum ratio. In addition to suggestion of change factor by work species, 5 qualified construction specialists are interviewed and change factors in 7 major works are analyzed.

A Study on Development of Cost Index Model for Military Facilities Construction (군 시설공사의 공사비지수 개발에 관한 연구)

  • Park Jong-Won;Son Bo-Sik;Lee Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.256-260
    • /
    • 2004
  • As a large portion of defence budget are alloted for military facility construction, reasonable budget estimation in the planning stage has been officers' main concerns. However the proper estimation of construction cost is difficult to be carried out due to the absence of systematic criteria. To improve the budget estimation for military facility construction, this study proposes a cost index model which can convert historical cost to current cost. Thus the developed cost index would enhance effectiveness of budget estimation process 3nd support reasonable decision making. This cost index model is developed by analyzing historical cost data with statistical methodology The study is executed by following process. First, factors which affect construction cost for the most are selected by analyzing historical cost data. second, the selected factors are categorized material cost, labor cost and equipment cost, and weights of those factors are calculated by dividing the cost of each factor by total item costs. Last, cost index is developed by using weighted average method.

  • PDF

A Profit Calculating Analysis and a Proposal of Estimation System of Historical Cost Data in the Electrical Construction Works (실적공사비에서 전기공사의 적정이윤율 분석에 관한 연구)

  • Seo, S.S.;Jang, Y.G.;Kim, K.G.;Hyun, S.Y.;Wang, Y.P.;An, J.H.;Park, M.Y.;Sohn, H.K.
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.2129_2131
    • /
    • 2009
  • Since Jan. 2004, the Ministry of Construction and Transportation has partly introduced estimation system of historical cost data in order to reflect result cost of construction market to cost estimation for public construction. It is expected that the purpose of the introduction would be evaluated considering the long-term development of domestic construction industry. In article 3, paragraph 4 of the planning criteria of estimated cost of financial regulation related to government contract rule, the profit estimated by historical cost data indicates sales profit and it is calculated by multiplying the sum of direct cost, indirect cost and general overhead by rate of profit. Finally, it is said that rate of profit cannot exceeds 10%. However, there are a lot of constructions for electronic equipment in the electronic construction and the proportion of government furnished material is very high, not like engineering works or constructions. Therefore, as the proportion of material cost over direct cost is relatively lower, if current rate of profit (10%) is applied, there would be a wide difference of cost in the items of profit under the estimation system of historical cost data. This paper was conducted to examine estimation methods of the items of profit under the estimation system of historical cost data and suggest reasonable applications.

  • PDF

A Profit Calculating Analysis and a Proposal of Estimation System of Historical Cost Data in the Electrical Construction Works (전기분야 실적공사비 적산제도에서 이윤산정 분석 및 제안)

  • Seo, S.S.;Lim, S.H.;Kwon, Y.M.;Kim, H.G.;Kim, J.H.;Sohn, H.K.;Park, I.P.
    • Proceedings of the KIEE Conference
    • /
    • 2007.04b
    • /
    • pp.155-159
    • /
    • 2007
  • Since Jan. 2004, the Ministry of Construction and Transportation has partly introduced estimation system of historical cost data in order to reflect result cost of construction market to cost estimation for public construction. It is expected that the purpose of the introduction would be evaluated considering the long-term development of domestic construction industry. In article 3, paragraph 4 of the planning criteria of estimated cost of financial regulation related to government contract rule, the profit estimated by historical cost data indicates sales profit and it is calculated by multiplying the sum of direct cost, indirect cost and general overhead by rate of profit. Finally, it is said that rate of profit cannot exceeds 10%. However, there are a lot of constructions for electronic equipment in the electronic construction and the proportion of government furnished material is very high, not like engineering works or constructions. Therefore, as the proportion of material cost over direct cost is relatively lower if current rate of exceeds (10%) is applied, there would be a wide difference of cost in the items of profit under the estimation system of historical cost data. This paper was conducted to examine estimation methods of the items of profit under the estimation system of historical cost data and suggest reasonable applications.

  • PDF

An Institute for Weight and Price index of Estimation System of Historical Cost Data in the Electrical Construction Works (실적공사비 적산제도에서 전기공사비지수의 적정 가중치 및 가격지수에 관한 연구)

  • Seo, S.S.;Jang, Y.K.;Ryu, K.H.;Kim, K.G.;Choi, S.D.;Kim, D.S.;Baek, S.H.;Won, S.H.;Sohn, H.K.;Park, I.P.
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.2092-2093
    • /
    • 2008
  • Since Jan. 2004, the Ministry of Construction and Transportation has partly introduced estimation system of historical cost data in order to reflect result cost of construction market to cost estimation for public construction. And KEPCO started estimation system of historical cost data in the electrical construction works. Electrical construction cost index a matter of great importance. This paper was conducted to examine estimation methods of the items of the price index estimation system of historical cost data and suggest reasonable applications.

  • PDF

Development of a Cost Index for Site Developing Project (단지조성공사용 공사비 지수의 개발)

  • Bae Keon;Lee Tai-Sik;Park Jong-Hyun;Lee Won-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.423-426
    • /
    • 2002
  • The foundation for developing a cost estimation system based on historical data has been being prepared in Korea. Historical data is a priori of developing a cost estimation model. Cost Index, one of the historical data, is used to estimate construction cost and to adjust the amount of contract money in the foreign country, whereas it is not used in domestic except for the road construction project in Korea. Construction cost indices can be used by an estimator in tender analysis, pricing, price adjustment, cost planning, and forecasting. In this regards, this paper identified the problems in developing Cost Index evaluation process by comparing the standard of framing Cost Index used in British to the one used in Korea. Then, the scheme for improving a Cost Index required for Site Developing Construction was proposed. Twenty-two cases of engineering estimate data were used to compare the domestic standard to the foreign one in deriving a Cost Index.

  • PDF

Problems and Improvement Schemes to Historical Cost Fluctuation Ratio Calculation According to the Escalation (물가변동에 따른 실적공사비 등락률 산출의 문제점 및 개선방안)

  • Jeong, Ki-Chang;Kim, Young-Ai;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.540-545
    • /
    • 2008
  • The purpose of this study is to suggest problems and improving plan of process of calculating escalation rate of the Historical Cost by price fluctuation. In order to implement this research, we analyzed problems by calculating the rate of price fluctuation with Historical Cost and measurement applying method making on-site with historical cost data were included as samples and suggested improving plan to the adjustment of contract cost. The results of research according to this are same as followings:1) Of all construction details, it is more appropriate to calculate price fluctuation by applying measurement method to the contents of historical cost unit. 2) To avoid confusion in calculating method, it was indicated that amendment in part should be achieved in order to calculate by measuring the part of calculating escalation rate of Historical Cost at related law and regulation.

  • PDF

Application of Probabilistic Risk Analysis for Profitability-Evaluation of Apartment Reconstruction Projects (아파트 재건축사업의 수익성평가에 대한 확률적 위험도 분석 모형 적용방안)

  • Woo, Kwang-Min;Lee, Hak-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.167-176
    • /
    • 2006
  • It was found that Korean Standard of Estimate which has been used as the only basis of cost estimate of public construction projects had some side effects such as jerry-build construction and over-estimation because it failed to reflect the current price and the state-of-the-art construction methods in a changing construction environment. Therefore, the government decided to gradually introduce historical construction cost into cost estimate of public construction projects from 2004. This paper presents analytic criteria and a process model for deducing more current and reasonable historical construction cost for contract items from not only previous contract prices but also all of the other bid prices that were not contracted. The procedure of estimating actual unit cost proposed in this paper focuses on the removal of abnormal values including strategically too low or high prices and the time correction. In addition, basic research is conducted for the correction of actual unit cost through the analysis of fluctuation of bid price depending on bidding types and rates of successful bid. It is anticipated that the effective use of the proposed process model for estimating actual unit cost would make the cost estimation more current and reasonable.

Development of Electrical Construction Cost Index for Historical Construction Costs Estimation System (실적공사비 적산제도 활용을 위한 전기공사비지수 개발)

  • Sohn, H.K.;Lee, H.K.;Park, M.Y.;Park, I.P.;Kwon, Y.M.;Seo, S.S.;Kim, K.G.;Kim, J.H.
    • Proceedings of the KIEE Conference
    • /
    • 2005.07e
    • /
    • pp.37-39
    • /
    • 2005
  • When we have been estimated construction costs, till now, we are used to costs accumulating method of each items based on standard labors rates. But there are some problems of its methods. Our governments are applied to a historical construction costs estimation system for building construction and civil engineering works from January 2004. The electrical construction works are forecasted that applied to historical construction cost estimation systems. This paper is showed to development of electrical construction cost index for estimation of historical costs and contract prices.

  • PDF