An Institute for Weight and Price index of Estimation System of Historical Cost Data in the Electrical Construction Works
실적공사비 적산제도에서 전기공사비지수의 적정 가중치 및 가격지수에 관한 연구
- Seo, S.S. (KECA(Korea Electrical Contractors Association)) ;
- Jang, Y.K. (KECA(Korea Electrical Contractors Association)) ;
- Ryu, K.H. (KECA(Korea Electrical Contractors Association)) ;
- Kim, K.G. (KECA(Korea Electrical Contractors Association)) ;
- Choi, S.D. (KECA(Korea Electrical Contractors Association)) ;
- Kim, D.S. (KECA(Korea Electrical Contractors Association)) ;
- Baek, S.H. (KECA(Korea Electrical Contractors Association)) ;
- Won, S.H. (KECA(Korea Electrical Contractors Association)) ;
- Sohn, H.K. (KERI(Korea Electrotechnology Research Institute)) ;
- Park, I.P. (KERI(Korea Electrotechnology Research Institute))
- 서순석 (한국전기공사협회) ;
- 장영길 (한국전기공사협회) ;
- 류기현 (한국전기공사협회) ;
- 김광곤 (한국전기공사협회) ;
- 최승동 (한국전기공사협회) ;
- 김대식 (한국전기공사협회) ;
- 백성현 (한국전기공사협회) ;
- 원성호 (한국전기공사협회) ;
- 손홍관 (한국전기연구원) ;
- 박인표 (한국전기연구원)
- Published : 2008.07.16
Abstract
Since Jan. 2004, the Ministry of Construction and Transportation has partly introduced estimation system of historical cost data in order to reflect result cost of construction market to cost estimation for public construction. And KEPCO started estimation system of historical cost data in the electrical construction works. Electrical construction cost index a matter of great importance. This paper was conducted to examine estimation methods of the items of the price index estimation system of historical cost data and suggest reasonable applications.