Nowadays the diversity and large-capacity of electric appliances are strong effect on electrical fires augment in an alarming way. But, as the inactive response characteristics of the existing RCD (Residual Current protective Device) used on low voltage power distribution system, so control of overload and electric short circuit faults, major causes of electrical fires, are not enough. Therefore, this paper is confirmed the unreliability of the existing RCD by electrical fault simulator and is proposed a Electrical Fire Disaster Prevention Device (EFDPD) by using a high precision current sensor (namely, reed switch) for the prevention of electrical disasters in low voltage power distribution system caused by overload or electric short circuit faults. The sensitive reed switch in the proposed EFDPD exactly detects the increased magnetic flux with the overload or the short current caused by a number of electrical faults, and the following, the EFDPD has double protection function which operates self circuit breaker or rapidly cuts off the existing RCD. The proposed EFDPD is confirmed the excellent characteristics in response velocity and accuracy in comparison with the conventional circuit breaker through various operation performance analysis. The proposed EFDPD can also prevent electrical disaster, like as electrical fires, which resulted from the malfunction and inactive response characteristics of the existing RCD.
Park, K.Y.;Song, K.D.;Choi, Y.K.;Shin, Y.J.;Song, W.P.;Kang, J.H.
Proceedings of the KIEE Conference
/
1994.07b
/
pp.1559-1561
/
1994
At present, the principle of puffer action in high current interruption is adopted in almost of the EHV(Extra High Voltage) and UHV(Ultra High Voltage) GCB(Gas Circuit Breakers). The thermal interruption capability of these GCBs critically depends on the pressure rise in the puffer cylinder at current zero. The pressure rise in the puffer cylinder depends on the puffer cylinder volume, flow passage and leakage area in the interrupter, stroke curve etc. Recently commercial CFD(Computational Fluid Dynamics ) packages have been widely adopted to calculate the pressure distribution in the interrupter. However, there are still several problems with it, e.g. very expensive price, moving boundary problem, computation time, difficulty in using the package etc. Thus, the calculation of the puffer cylinder pressure in simple and relatively correct method is essential in early stage of GCB design. In these paper, the model ing technique and computed results for EHV class GCB (HICO, 145kV 40kA and 362kV 40kA GCB) are presented and compared with available measured results.
The Proceedings of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.11
no.6
/
pp.96-103
/
1997
This paper deals with the malfunction characteristics of the earth leakage circuit breakers(ELBs) applied by a lightning impulse voltage. In the cases of the regulation of KS C 4613 and the simulated circuits with surge protection devices, the dead operation characteristics of the ELBs against lightning impulse voltages were experimentally investigated and discussed. As a result, all the specimens(ELBs) used in this work have a cutoff performance of the lightning impulse voltage when the differential mode surges were injected at the input terminals of the ELBs owing to a surge absorber installed at the power source side of amplification circuit. Four kinds of the specimens have brought about malfunction in the condition of the lightning impulse dead operation test defined in KS C 4613, and the malfunction voltages are relatively high and are about 5-6.5[kV]. In the case of the simulated test circuit with surge protection devicesthree kinds of the ELBs have led to malfunction. Also the voltage level causing the malfunction of the ELBs is decreased by operation of surge protection devices, and it ranges from 3 to 5(kV).
The Proceedings of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.11
no.5
/
pp.44-52
/
1997
Electronic circuits with semiconductor and IC are very weak against the surge voltage and currents. The surge protective devices for electronic circuit and AC power lines are becoming more widely used. It is possible to give rise to the malfunction of the earth leakage circuit breaker(ELB) due to the operation of surge protective devices, and the interruption of AC power lines on account of the malfunction of the ELB brings about several disadvantages such as low operation efficiency and reliability of electronic and informational systems, economical loss, and etc. The aim of the present work is to investigate the dead operation characteristics of the ELB against the surge voltages. The impulse generator of 10[kV) in an 1.2/ 50[~) voltage waveform was fabricated. The dead operation characteristics of the ELB applied by surge voltages were measured under the conditions of KS C 4613 and the test circuit with a varistor. As a consequence, the peak value of the zero-phase sequence circuit of the ELB is increased as the surge voltage and stray capacitance increase. All of the ELBs used in this work were satisfied with the lightning impulse dead operation test condition defined in KS C 4613. However one specimen only did not bring about dead operation in the condition of the test circuit with a varistor. There is high possibility that a large portion of the ELB installed at the AC power lines with the surge protective devices bring about the dead operation.
Because on the high-tension underground distribution line of an electric railway high voltage XLPE Cable two or three circuits between railway stations with a standard as receiving transformer facilities are established at a $30km{\sim}50km$ interval, reactive power in which the phase of a current is larger than that of a voltage is supplied when trains are not working, so when there are no loading or low loading as night. Due to the long-distance trend of the underground distribution system on an alternating current railway distribution line, the terminal voltage of a transformer is over the standard voltage, and after all, commercial cycle overvoltage is continued. To solve this problem, the shunt reactor is installed in middle of power distribution lines to maintain receiver voltage meted under the allowance regulation through control of the reactive power. Also, in case that the thickness of single cable is over $60mm^2$ and length of line is about over 30km, a circuit breaker is broken by shorting shunt ability of charging current in excess of shunt current(31.5A.rms). Therefore, this thesis presents installing the location of shunt reactor for quantitative analysis by using optimum algorism for compensation and control of the charging current.
Journal of the Korean Institute of Electrical and Electronic Material Engineers
/
v.26
no.3
/
pp.216-220
/
2013
The rated voltage has been rising in order to minimize the losses in power transmission. The high voltage electric machines should be minimized due to the constraints of space. Therefore, the temperature of high voltage electric apparatuses easily exceeds the temperature limits. In this paper, it is investigated that how to minimize the internal temperature rising of a high voltage switchgear by adjusting the arrangement of bus bars. High voltage switchgears consist of a circuit breaker, a CT, a PT, a earthing switches, bus bars, and so on. It is very difficult to estimate the electromagnetic properties of a high voltage switchgear due to these various environments and structures. In this paper, analyses are focused on the electromagnetic characteristics of bus bars according to the arrangement method and the enclosures to simplify the electromagnetic characteristics of a switchgear. It is found that the characteristics of electric field intensity and electromagnetic losses in bus bars are influenced by the arrangement method of bus bars. However, it is confirmed that the electromagnetic characteristics of enclosures are not affected by the arrangement of bus bars. In this paper, the arrangement methods of bus bars to minimize the electric field intensity and electromagnetic losses are suggested. It is expected that the research results are helpful to design and develop an electrically reliable high voltage switchgear.
Kim, Jong-Gyeum;Jeong, Jong-Ho;Cho, Hyoun-Gil;Lee, Eun-Woong
Proceedings of the KIEE Conference
/
1994.07a
/
pp.15-17
/
1994
As VCB has many advantages which is an excellent interruption capability, compact structure, easy maintenance and light weight, it has been widely used as a load breaker. But steep-fronted surge voltage due to high frequency extinguishing capability in switching has been occurred. If it impinges into induction motor, it acts on the electrical stress, and causes to deteriorate winding insulation. In this research, in order to protect motor insulation from the steep-fronted reignition surge, the occurring condition, the cause of the reignition surge and the influence of circuit parameters which have been an effect on the occurrence of reignition and multiple reignition surge has been also analyzed.
The Transactions of the Korean Institute of Electrical Engineers B
/
v.51
no.6
/
pp.267-272
/
2002
This Paper deals with the short circuit tests of the three-Phase DC reactor type fault current limiter (FCL) in changing of turns ratio of transformers. The experiment of this paper is a preliminary step to develop the FCL's faculties for an application to high voltage transmission line. So, superconducting coil was made of Nb-Ti, low temperature superconductor, and the ratings of the power system of experimental circuit are 400V/7A class. A three-phase DC reactor type FCL consists of three transformers, six diodes, one superconducting coil and one cryostat. The important point of experimental analysis is transient period, the operating lagging time of circuit breaker. As the results of the experiment, the values are referred to the limitation rate about 77% and 90% when the turns ratio of transformer was 1:1 and 2:1 respectively.
Fault current problems is considered a serious issue in the power system because large fault currents not only cause many side effects to the equipments of power system but also lead to severe problems, such as blackouts. This paper deals with the structural analysis and 3-phase fault current stability of the future Seoul metropolitan power system. The simulation composition and analysis are performed with the 4th KEPCO power supply planning data using PSS/e. Through the results of the simulations, it can be observed that the future Seoul metropolitan system results in a fault current which exceeds the circuit breaker (CB) rate. This unremovable fault current can cause critical damage to power system. To resolve the problem, the algorithm for the application of Voltage Sourced Converter Back-to-Back High Voltage Direct Current (VSC BTB HVDC) is being proposed. where the most suitable location for solving fault current problem in Seoul metropolitan area is being implemented.
Kim, Dong-Uk;Lee, Ho-Yun;Park, Kyu-Hoon;Kim, Sungmin;Lee, Bang-Wook;Cho, Youngpyo;Kim, Juyong
Proceedings of the KIPE Conference
/
2019.07a
/
pp.299-300
/
2019
본 논문에서는 MVDC(Medium-Voltage DC) 차단기의 성능평가를 수행하기 위해 사용되는 단락 시험 설비의 새로운 구조를 제시한다. 단락 시험 설비는 직류 고전압과 고전류를 발생시키고 이러한 조건에서 차단기의 개폐 성능을 검증한다. 고전압과 고전류를 단일 회로로 합성하는 구조의 경우, 단락 시험 설비의 규모와 전력용량이 매우 크다. 제시하는 단락 시험 설비는 별개의 회로인 고전류원과 고전압원으로 구성된다. 각 회로에서 직류 고전압과 고전류를 발생시켜 단락 시험을 수행하는 구조이다. 제시하는 단락 시험 설비의 구조와 동작 원리를 설명하고 시뮬레이션 분석을 통하여 그 성능을 검증하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.