• Title/Summary/Keyword: High-speed rail

Search Result 819, Processing Time 0.026 seconds

A Study on the Improvement of Project Management System for International Competitive Power and Global Business Strategy of Rail Project (철도사업의 종합사업관리 국제경쟁력 강화방안에 대한 연구)

  • Lee Young-Joo;Jang Seong- Yong
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1595-1600
    • /
    • 2004
  • High speed railroad project management has been almost completed by starting operation of Seoul-Busan high speed railroad with the exception of a few constructing blocks currently in April, 2004. After Korea Rail Network Authority was established in 2004, it needs to develop new project management system for both conventional railroad construction and high speed railroad construction for domestic railroad projects, while it plans to invest in overseas railroad project for logistics innovation and improvement in passenger transport services on a large scale. Therefore this paper provides the method that we can adapt the project management system for high speed railroad containing experiences and know-how from construction of high speed railroad for both conventional railroad construction and high speed railroad construction or improve project management system for high speed railroad to use it as project management system for overseas railroad projects.

  • PDF

Strengthening strategies for railway accessibility (철도의 접근성 강화전략)

  • Moon Dae-Seop;Chung Byun-Hyun;Kim Kyung-Tae
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.365-369
    • /
    • 2004
  • This paper is designed the accessibilities at rail station and near facilities without distinguishing transportation handicapped or not handicapped people. Therefore, I would like to refer that this study is the just beginning such as the development for sustainable railway. This primary paper intends to present alternatives of trans-modal systems as the final goal in an attempt to set a direction for future policy making in the high speed rail sector. The alternatives recommended in this report stress two important elements for maximized utility of high speed rail at the station areas.

  • PDF

Core Contents&Superiority of Localized Point-Machine for High Speed Rail (고속철도용 전철기 국산화 개발 핵심 내용 및 우수성)

  • 윤호석;신기태;김대학;김영필
    • Proceedings of the KSR Conference
    • /
    • 2002.05a
    • /
    • pp.492-497
    • /
    • 2002
  • This study presents the core contents and superiority of localized Point-Machine which Alstom transferred its technology to Samsung SDS for High Speed Rail, developed based on existing MJ8l Point-Machine that is used in France and other countries. The scope of study includes introducing performance improvement of Localized MJ8l and conducting comparative analysis between Localized MJ8l and french products as well as NS type Point-Machine that has been deployed in the existing rail link. Moreover, the general architecture, features and test run results of Localized MJ8l are described.

  • PDF

Implementation of a High Speed Comparator for High Speed Automatic Test Equipment (고속 자동 테스트 장비용 비교기 구현)

  • Cho, In-Su;Lim, Shin-Il
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.19 no.3
    • /
    • pp.1-7
    • /
    • 2014
  • This paper describes the implementation of high speed comparator for the ATE (automatic test equipment) system. The comparator block is composed of continuous comparator, differential difference amplifier(DDA) and output stage. For the wide input dynamic range of 0V to 5V, and for the high speed operation (1~800MHz), high speed rail-to-rail amplifier is used in the first stage. And hysteresis circuits, pre-amp and latch are followed for high speed operation. To measure the difference of output signals between the two devices under test (DUTs), a DDA is applied because it can detect the differences of both common signals and differential signals. This comparator chip was implemented with $0.18{\mu}m$ BCDMOS process and can compare the signal difference of 5mV up to the frequency range of 800 MHz. The chip area of the comparator is $620{\mu}m{\times}830{\mu}m$.

Technical specification of Tilting train EMU for speed UP on existing lines (기존선 속도향상을 위한 틸팅차량시스템 기술사양(안) 제시 연구)

  • Han, Seong-Ho;Park, Kwang-Bok;Lee, Su-Gil;You, Won-Hee;Eeum, Ki-Young
    • Proceedings of the KIEE Conference
    • /
    • 2002.07b
    • /
    • pp.1298-1300
    • /
    • 2002
  • This paper suggested that the technical specification of tilting train EMU for speed up on existing lines. High speed strategy of existing lines are the modification of railway system which are made on cant, lengths of transition curves, the catenary system and train system. Tilting technology is more useful a strategy for speed increases on existing lines with low investment needed. We performed a feasibility study which is considered out real track conditions and designed propulsion and braking system of tilting EMU system.

  • PDF

Design and Construction Method Considering Turnout for High-speed on The Bridge with Concrete Track (콘크리트궤도에 고속분기기 설치를 고려한 교량설계 및 시공기법)

  • Kim, In-Jae;Oh, Sei-Young;Joo, Hwan-Joong
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.71-79
    • /
    • 2008
  • The concrete track is being used at the Phase II of the Kyeongbu High Speed Railway and New Constructed Honam High Speed Railway. When it makes a decision of bridge type, It has to consider about longitudinal forces of Continuous Welded Rail, Displacement at the end of bridges, Up-lift forces for fastener on the track. If it is installed turnout on the bridge, There is likelihood of the deck twist by applying the each difference longitudinal forces at the 4 each rails and the buckling by concentration of rail stress at the turnout. Moreover, If it is installed turnout on the continuous bridge and REJ(Rail Expansion Joint) on the main track or turnout track. It is hard to keep a safety for rail because of coming to twist or folding at the expansion of deck on the turnout track. Therefore when it is a design of bridge with turnout. It need to take bridge type to minimize an additional axial force and a displacement at the turnout. This paper makes a study of the composite steel arch bridge that is able to resolve criteria requirements of safety for track with turnout and suggest a helpful design method for bridge considering track with turnout by being based on design and construction method of Eonyang Bridge at the north part of Ulsan Station in Phase II of the Kyeongbu High Speed Railway.

  • PDF

Reformation of Korea Rail Network in $21^{st}$ century (21세기 한국철도망 정비방향)

  • Sin Chong-Seo
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1624-1626
    • /
    • 2004
  • On the 105th year of the Korean Railroad, Korea railroad is at the advent of the high speed operation with an commercial operation of KTX(Korea Train eXpress), the fifth high speed line in the world, between Pusan and Seoul at the speed of 300km/hr. In order to enhance nation competitiveness in $21^{st}$ century, Korea Railroad is faced with a task of improving the railroad network in the areas of new line constructions, betterment of existing rail lines, increasing the operation speed and transportation capacity and modernization of rolling stock fleet.

  • PDF

Control Strategy for High Speed Operation in Light Rail Transit (경량전철용 구동시스템의 고속영역운전을 위한 추진제어기법)

  • Lee Eun-Kyu;Choi Jae-Ho
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.53 no.10
    • /
    • pp.634-640
    • /
    • 2004
  • In this paper, the control strategy for high speed operation in light rail transit system is proposed. Recently, the vector control strategy is used to get high capacity control characteristic in low speed area. But Six step mode that is one pulse mode is used in high speed region to use DC link voltage to the maximum. Therefore, in high speed area, the vector control can not be used but scalar control method is used. To get a driving performance to be stabilized, the method of smooth mode change between the low speed and high speed area and PWM control is desired. So this paper proposes the control strategy using vector control include the one pulse mode. And also proposes overmodulation method that makes to change in one pulse mode softly. The performance of traction system will be verified by simulation results using MATLAB and experimental results.

A Study on Behavior of Concrete Slab Track subjected to High Speed Train Loads (고속열차하중을 받는 슬래브궤도의 동적거동에 관한 연구)

  • 조병완
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2000.04a
    • /
    • pp.485-492
    • /
    • 2000
  • In the rail facilities the rail track consists of rail tie fastening accessories and bed,. The rail track is largely divided into Ballast Bed Track(BBT) and Concrete Bed Track(CBT) according to the type of bed. In this thesis among Concrete Bed Track slab track which is used for the Japanese high speed railway is a target of this study. Dynamic analysis by using finite element method are performed. where moving rain load is periodic function. Then through parametric study some conclusions are obtained as follow. Cement Asphalt Mortar(CAM) affects contrary mechanical behavior to rail and slab greatly. Therefore change of CAM spring coefficient should be handled with care, For slab thickness thin slab is more profitable to reduction of vibration of rail than thick one but mechanical capacity of slab is deteriorated, Improved structural type is proposed then structural analysis is performed for this one. This type is effective to reduction of vibration of railway system.

  • PDF

Parametric Study on the Safety of CWR Track over High-Speed Railway Bridges (매개변수해석을 통한 고속전철교량상 장대레일궤도 안전성 검토)

  • 강재윤;김병석;김영진;박성용;조정래;최은석;진원종
    • Journal of the Korean Society for Railway
    • /
    • v.5 no.1
    • /
    • pp.1-9
    • /
    • 2002
  • Where the track is continuously welded over the bridge, the longitudinal forces will be distributed interactively between the track and the sub-structure by the rail-bridge interaction mechanism. The ratio between the longitudinal forces transmitted in each elements depends on the magnitude of the ballast resistance and the stiffness of the sub-structures. In this paper, the main factors affect on the longitudinal rail force are discussed and the parametric study for the behavior of CWR(Continuous Welded Rail) track was executed. It is concluded that the horizontal ballast resistance and the stiffness of the bridge sub-structure are the significant parameters affecting the stability of the continuous welded rail track.