• Title/Summary/Keyword: High productivity

Search Result 2,959, Processing Time 0.028 seconds

Comparison on the Application of Various Productivity Analysis Methods for a Curtain wall Operation in High-rise Building Construction (초고층 커튼월 공사의 생산성 분석 기법에 대한 적용성 비교)

  • Lee, Tae-Hee;Ko, Yong-Ho;Kim, Young-Suk;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.211-212
    • /
    • 2011
  • The construction industry has become larger and higher in size. The process of high-rise building construction is complicated and has various conditions affecting productivity. Analysing productivity in high-rise buildings is difficult despite the various productivity analysis methods. In this study, data was collected from actual construction site to analyse the productivity of curtain wall operation by means of Work sampling and Method Productivity Delay Model. As a result, this paper suggests advantages and disadvantages deducted from comparing the two productivity analysis methods.

  • PDF

EVALUATING PRODUCTIVITY-AFFECTING FACTORS ON FINISHING WORKS IN HIGH-RISE HOUSING CONSTRUCTION

  • Chi-Joo Lee;Jae-Jun Kim;In-Suk Park;Sang-Hyo Lee;Yoon-Sun Lee
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.398-406
    • /
    • 2007
  • Constructing high buildings is a global trend, and skyscrapers for residing are also increasing. But a period of works for finish construction is different depending on a company while a period of works for frame construction of skyscrapers for residing in the country is regular when considering a difference of a method of construction, and the increase of repeated construction for high buildings and number of related process for finish construction are stressing the importance of improving productivity through construction management and plan for works. Because there are many compositive factors affecting productivity other than technical factors, we should intensively study the way of improvement and prevention preferentially through analyzing factors affecting productivity. So in this study, we present important management factors for making systematic strategy and plan for improvement of productivity by finding factors affecting productivity depending on the degree of importance unifying factors affecting productivity of plan factor(internal factor of construction process) and management factor(outer factor of construction process).

  • PDF

Differences in Productivity among Wheat, Barley and Rye for Forage

  • Kwon Byung-Sun
    • Plant Resources
    • /
    • v.8 no.1
    • /
    • pp.9-12
    • /
    • 2005
  • TO select the most suitable crop and variety of forage for productivity at the southern part of Korea, The crops of wheat, barley and rye were grown from Oct. 1999 to June 2000. Paldanghomil variety of rye crop was shown to have the highest productivity in comparison to other varieties of crops used in this experiment. It showed relatively high plant height, number of tiller, forage yield and dry matter yield. There fore, it was concluded that Paldanghomil of rye crop was the most suitable crop with high yield in the southern part of Korea. The heritabilities of all characters were estimated to be high.

  • PDF

Measuring Korea's Industry-level Productivity Change Due to Tariff Cuts using a CGE Model

  • Roh, Jaewhak;Roh, Jaeyoun
    • Journal of Korea Trade
    • /
    • v.25 no.3
    • /
    • pp.48-64
    • /
    • 2021
  • Purpose - This study examined the effect of tariff cuts on productivity in Korea's manufacturing industries and the effect of initial productivity level before tariff cuts on productivity improvement after tariff cuts. We also attempted to identify whether import-driven or export-driven factors are more important for productivity improvement, especially in low productivity industries. Design/methodology - Since tariff reduction is a policy decision that can affect cross-industry, its impact is spread across all industries beyond the scope of a single firm through the input and output network of industry structure. Accordingly, we proposed a new method to measure the change in productivity to reflect the impact of tariff cuts across industries. Through an Armington CGE analysis, changes in endogenous variables can be directly measured after the exogenous shock of tariff reduction, and the amount of movements in productivity triggered by tariff cuts can also be calculated. We can thus assess the effectiveness of exogenous policy, such as tariff cuts, through the difference between the benchmark and counterfactual values of endogenous variables. Findings - This study confirmed that tariff reduction positively affected productivity improvement in Korea's manufacturing industries. It also confirmed that productivity gains occur in Korea's leading export industries. Finally, greater productivity gains were recorded in the group with additional high-export-share or high-import-share conditions for low productivity industries. These results are, in a limited sense, consistent with the existing studies that emphasize the importance of exports and imports on productivity improvement, especially for low productivity industries. Originality/value - The results of our experiments are different from those of non-CGE studies, which measure the industry-level change in productivity with dummy coefficients, in terms of directly calculating the amount of change in productivity. In addition, we propose that the Armington CGE model is more appropriate than the Melitz CGE model to directly measure the productivity after tariff cuts. This is because the Melitz CGE model assumes the given specific productivity density, which does not change after an overall drop of tariffs. To the best of our knowledge, this approach to directly calculating productivity by reflecting the impact of tariff reduction across industries through CGE analysis, is unprecedented in this literature.

Work Productivity Analysis of High-performance PC Slab Installation

  • Shin, Young-su;Cho, Kyuman;Cho, Chang-geun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.616-617
    • /
    • 2015
  • Demand is increasing for large, high-rise, and complex buildings, which is leading to advances in the development of high-performance structural systems. In this context, precast concrete (PC) technology has received a large amount of attention owing to its benefits in terms of schedule reduction, high quality, and easy installation. In addition, advanced methodologies that improve the PC performance by the addition of various materials have recently been reported. Research on analyzing the effects of such high-performance PC on the construction process and productivity is very limited. This makes it difficult for decision-makers to apply PC to particular projects. Thus, the aim of this research was to analyze the work productivity of the high-performance PC slab installation process by using a construction simulation tool to resolve critical issues. In this study, a real construction project that adopted PC slab installation work was analyzed, and a sensitivity analysis was performed to confirm the reliability of the analysis results.

  • PDF

An Analysis about determinants of Total Factor Productivity and Technical Efficiency in Manufacturing Industries : Non-parametric Malmquist Approach (제조업의 총요소생산성과 기술적효율성 결정요인분석 : 비모수적 맴퀴스트 생산성 지수에 의한 분석)

  • Jung, Kyung-Hee;Cho, Jai-Rip
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2009.04a
    • /
    • pp.337-350
    • /
    • 2009
  • Using the Malmquist productivity index, this paper compares the productivity of Korean manufacturing industries from 1999 to 2006. The malmquist productivity index has more advantages than previous methods such as solow model, endogenous growth theory. The malmquist productivity index can be decomposed productivity into two parts. The first part is an index of the technical efficiency change. This index has high value when the elements of production is used more efficiently. The second part is an index of technical change. This index has high value if the advent of new technology and process innovation occur.

  • PDF

Critical Factors for Container Terminal Productivity

  • Park, Nam-Kyu;Kim, Joo-Young
    • Journal of Navigation and Port Research
    • /
    • v.33 no.2
    • /
    • pp.153-159
    • /
    • 2009
  • The awareness of the high-value industry for container terminal leads competitiveness of container terminals to keep high fiercely. In regards to competitive factors of container terminal, the most important point among several factors is seemed to be the speed of container loading and unloading on quayside. In container terminals in Korea, the productivity shows big difference even though its condition is similar to each terminal. The objective of this paper is to find the critical factors of container terminal productivity, which is dependant upon the capability, quantity of quay crane, transfer vehicle, and so on. For this purpose, we have researched related literatures, and collected data about container terminals in South Korea. Furthermore, we tested sensitive analysis to evaluate the extent of productivity by changing independent variable. And then we established the regression model to evaluate which factor has had the biggest impact on productivity. The results of this paper can give terminal operators guideline to improve productivity.

Relationship among Egg Productivity, Steroid Hormones (Progesterone and Estradiol) and Ovary in Korean Native Ogol Chicken

  • Kang, W.J.;Yun, J.S.;Seo, D.S.;Hong, K.C.;Ko, Y.
    • Asian-Australasian Journal of Animal Sciences
    • /
    • v.14 no.7
    • /
    • pp.922-928
    • /
    • 2001
  • There exists considerable evidence that steroid hormones are involved in the regulation of ovulation rate and oviductal development in poultry. However, the effect of steroid hormones on egg productivity of Korean Native Ogol Chicken (KNOC) has yet to be studied. Therefore, this study was performed to relate the expression of steroid hormones, especially progesterone ($P_4$) and estradiol ($E_2$), with egg productivity during the laying period. Egg production and egg weight of 70 KNOC were recorded from 20 to 60wk. Blood was taken every 10 wk and serum $P_4$ and $E_2$ were measured by radioimmunoassay. Based on egg productivity and steroid hormones levels up to 60 wk, chickens were divided into two groups, high and low. Compared to the low egg production group, a significantly higher expression of $P_4$ at 30 wk was detected in the high group. Moreover, egg production in the high $P_4$ group significantly differed from that in the low group at 30 wk. On the other hand, a Significant difference (p<0.05) in $E_2$ expression was found between high and low egg weight groups at 30 wk. Although a significant difference in egg weight between two groups by $E_2$ was not detected, the high $E_2$ group showed a higher level of egg weight than the low $E_2$ group except for 25 wk. In the comparison of ovary weight and small yellow follicle number, the group with high egg productivity and steroid concentration showed greater levels than the low group. Taken together, the results indicate that $P_4$ is related to egg productivity whereas expression of $E_2$ is associated with egg weight in KNOC.

The Impacts of Technology Transfer on Productivity Growth of Firms based on Malmquist Productivity Index

  • Han, Jaeseung;Kwon, Youngkwan;Lee, Sang-Yong Tom
    • Asia pacific journal of information systems
    • /
    • v.26 no.4
    • /
    • pp.542-560
    • /
    • 2016
  • This study determines whether or not firms can achieve high productivity growth through external technology acquisition. It also identifies the key factors affecting adopting firms' productivity growth by employing the Malmquist productivity index (MPI) methodology, which features computational ease, low data dependency, and decomposition of productivity growth into technical efficiency change and technical change. Results showed that the effects of productivity growth arising from technology transfer became stronger over time. Moreover, patent transfer guaranteed firms' productivity growth, but no evidence was found that factors such as age and size could increase productivity. Finally, cultural similarity could be another factor conditioning the effectiveness of technology transfer in the productivity of adopting firms.

Regression Technique-based Productivity Estimation conducting Construction Delay Factor Analysis on Interior Works in High-rise Building Construction (공기지연요소분석을 이용한 회귀분석 기반 초고층 내부공사의 생산성 예측)

  • Kim, Hyun-mi;Kim, Tae-Hyung;Shin, Young-Keun;Kim, Young-Suk;Han, Seungwoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.191-192
    • /
    • 2011
  • The construction projects contain a lot of variables and risk affecting productivity. The duration of the project must be recognized important as for quality, unit cost and safety. There is need for improving work efficiency by investigating relationship of works to prevent delay. This study focuses on analysing the delay factors of steel staircase system to suggest regression model that enables construction productivity estimation. The position of the observers and construction delay factors were expressed by the independent variable of the regression model and productivity was expressed by a dependent variable. This paper suggests quantitative productivity and it is expected that will be helpful estimating application in construction new technologies.

  • PDF