• Title/Summary/Keyword: High Rise

Search Result 4,469, Processing Time 0.026 seconds

Analysis of Seismic Response According to Installation Location of Seismic Isolation System Applied to High-Rise Building (고층 건물에 적용한 면진 시스템의 설치 위치에 따른 지진 응답 분석)

  • Kim, Min-Ju;Kim, Dong-Uk;Kim, Hyun-Su;Kang, Joo-Won
    • Journal of Korean Association for Spatial Structures
    • /
    • v.18 no.4
    • /
    • pp.81-88
    • /
    • 2018
  • Seismic isolation systems have typically been used in the form of base seams in mid-rise and low-rise buildings. In the case of high-rise buildings, it is difficult to apply the base isolation. In this study, the seismic response was analyzed by changing the installation position of the seismic isolation device in 3D high - rise model. To do this, we used 30-story and 40-story 3D buildings as example structures. Historic earthquakes such as Mexico (1985), Northridge (1994) and Rome Frieta (1989) were applied as earthquake loads. The installation position of the isolation device was changed from floor to floor to floor. The maximum deformation of the seismic isolation system was analyzed and the maximum interlaminar strain and maximum absolute acceleration were analyzed by comparing the LB model with seismic isolation device and the Fixed model, which is the base model without seismic isolation device. If an isolation device is installed on the lower layer, it is most effective in response reduction, but since the structure may become unstable, it is effective to apply it to an effective high-level part. Therefore, engineers must consider both structural efficiency and safety when designing a mid-level isolation system for high-rise buildings.

A Study on the Improvement of Fire Safety in high-rise Building Construction in Legal aspects (법규적 측면에서 고찰한 고층 건축물 공사현장 화재안전 확보방안)

  • Park, Chan-Seok;Jeong, Il-Kyun
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.1
    • /
    • pp.21-32
    • /
    • 2015
  • High rising of the buildings offers a number of risk factors than ever before with regard to fire prevention. Especially in the construction site of high-rise buildings, people waste golden-time during the evacuation because temporary fire fighting facilities are not installed and transferred to a large fire because of fire suppression failure. In this study, the researcher derives the problems of fire protection in high-rise buildings construction sites and proposed the measures in such the legal aspects as fire building construction code and etc. There are the legal improvements such as orders of construction suspension in the problems of fire safety, appointing fire safety manager, temporary fire protection installation standards, enhancing penalty provisions regarding the use of fire, operating self fire brigade, confirming on-site after completing fire-protection facalities, establishment or strengthening special fire-protection investigations.

A Case Study of The Design of Mega Foundations for High-rise Buildings (초고층 건축물의 대형기초 설계 사례)

  • Kim, Sung-Ho;Hong, Seung-Hyeun;Hong, Sa-Myun;Choi, Yong-Kyu
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2007.09a
    • /
    • pp.55-77
    • /
    • 2007
  • Currently a large number of high rise building projects are under plan and a mega foundation system to support this high load with safety is requiring. The foundation of a highrise building is displaced by the building load, which influence the behavior of a super structure in reverse. In this aspect, the structural interaction analysis between a foundation and a super structure is necessary. In this study, the relationship of a superstructure of building and a foundation has been reviewed, considering the tendency of design from a capacity driven design to a performance design. Two different case studies have been introduced to help understand this relationship in more specific, the first case is the high rise building founded on a mat system on rock and the second is that on large diameter bored piles on soft ground condition.

  • PDF

Citic Tower Construction Key Technology

  • Xu, Lishan
    • International Journal of High-Rise Buildings
    • /
    • v.8 no.3
    • /
    • pp.185-192
    • /
    • 2019
  • Citic Tower is the first over-500 m-tall super highrise building in the world, located in the high seismic intensity area with paek ground acceleration over 0.2g in 475 years. This project is unique in its complexity, large volume, and challenging site conditions (zero site for construction). The traditional techniques can hardly meet safty, quality and schedule requirements of the construction. This article introduces the key construction technologies that are innovatively developed and applied in Citic Tower project construction, including intelligent super-high-rise building integrated construction platform system, independently developed by the CCTEB; Jump-Lift Elevator, which is the first of the kind with service height over 500 meters; combined temporary-and-permanent fire protection systems. The BIM technology is also applied in this project. Through technical innovation, and utilization of technologies, construction speed and safety had been greatly improved.

Application of Strcutral Health Monitoring in Structual Engineering for Buildings

  • Ji Young, Kim;Hobeom, Song;Kanghyun, Park;Kwangryang, Chung
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.3
    • /
    • pp.221-226
    • /
    • 2022
  • Installation of Structural Health Monitoring (SHM) system is a legal obligation for high-rise buildings over 200 m or 50-floor high in South Korea. CNP Dongyang has developed key technologies for SHM system design, installation, and data analyzing. Also, CNP Dongyang has applied SHM technology to a plenty of South Korea's representative high-rise buildings. The SHM technology, also, could be used in safety management of construction phase, evaluation of structural performance, etc. In this paper, state of the art SHM technologies and their application examples are introduced to give insight for future research and practical use of SHM.

Application Examples of CFD at the Planning Stage of High-Rise Buildings

  • Hiroto, Kataoka;Yoshiyuki, Ono;Kota, Enoki;Yuichi, Tabata;Satoko, Kinashi
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.3
    • /
    • pp.145-156
    • /
    • 2022
  • Application examples of computational fluid dynamics (CFD) in the planning stage of high-rise buildings are introduced. First, we introduce examples of applications in the environmental field. The pedestrian wind environment was one of the earliest practical examples of CFD. CFD was also employed to validate the heat island mitigation measures proposed as part of the new construction plan. Second, application examples of wind-force evaluations are introduced. Prediction examples are presented for the peak wind pressure around a complex-shaped building and the wind force evaluation for a base-isolated building. The results prove that the results of the proper execution of CFD are equivalent to those of the wind tunnel experiment. As examples of CFD applications of other issues related to high-rise building planning, we introduce snow accretion on outer walls and high-temperature exhaust from emergency generators. Finally, the future prospects for the use of CFD are discussed.

Facade Cleaning Process Analysis For Construction Robot System Design of High-rise Building External wall Maintenance (고층건물 외벽 유지보수 건설로봇 시스템 개발을 위한 청소공정 작업절차 분석)

  • Kim, Dae-Geon;Kim, Bok-Kyu
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05b
    • /
    • pp.77-79
    • /
    • 2011
  • As residents and building owners demand maintenance that is required to achieve sustainable building performance, efficient building management methods are required. Even though the demand for maintenance systems is increasing, current maintenance work for high-rise buildings mostly uses conventional ropes and gondolas that pose a high risk of accidents and exhibit poor performance and efficiency. Thus, there is an urgent need to develop an automation robot system that can reduce accidents and improve the maintenance efficiency of the conventional high-rise building façade maintenance system. As a preceding work for the development of an automation robot system, this study classified and analyzed the work processes of actual construction sites and proposed basic techniques for the work mechanisms of the robot system by investigating the motions of cleaning workers.

  • PDF

Reaching New Heights in Timber-Hybrid Design: Designing the Netherlands' Tallest Timber-Hybrid Residential Building

  • Pascal Steenbakkers;Babette Verheggen;Mathew Vola;Do Janne Vermeulen
    • International Journal of High-Rise Buildings
    • /
    • v.13 no.2
    • /
    • pp.195-204
    • /
    • 2024
  • HAUT, a residential tower, is a prototype for building innovative and environmentally-friendly high-rise timber structures. The team - Arup, Team V Architecture, Lingotto and JP van Eesteren - designed and built an ambitious sustainable building: a timber skyscraper, with 21 floors one of the tallest timber hybrid towers in the world. Never before has this highest sustainability rating - BREEAM Outstanding - been awarded to a residential building in the Netherlands. As a result of the new techniques for a timber hybrid tower of 73 meters high, there is interest from all over the world for this combination of sustainability and urban densification.

A Study on the Work-Planning Method of High-rise Building (초고층 건물의 구조체 공사의 작업계획방법에 관한연구)

  • Kim Dae-Gil;Hwang Jae-Hoo;Jung Ho-Geun;Kim Ju-Hwan;Lee Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.05a
    • /
    • pp.129-132
    • /
    • 2006
  • Recently, Society increasingly need the hish-rise building because of urban population concentration. and The hish-rise building need new systematic work-planning method. but it didn't use the construction project's work plan and management. his paper investigated efficient work-planning method. and the work-planning method in using domestic High-rise building's structure work. A investigated result is TACT, DOC LOB etc. and domestic using method is 3day and 4day-Cycle among the Tact. This paper is to compare and analysis two method. a purpose of paper is to analyse application through the case of using the work-planning method. also To find efficient method.

  • PDF

A Study on the Fire Prevention of High-Rise Apartment Buildings in Korea (우리나라 초고층 집합주택의 방재계획에 관한 연구(I))

  • 이영재;오병칠;반영식;윤명오;이건영
    • Fire Science and Engineering
    • /
    • v.6 no.2
    • /
    • pp.3-13
    • /
    • 1992
  • As the society is industrialization and urbanization, the increase in density of urban population brought about the rise of the land value and the shortage of the land for housing, as a result urban housing shortage was on the rise in a new social problem. According to this high-rise apartment buildings is under construction, but that is required habitation and safety, especially security for fire safety, because it is various age group residents in for 24 hours. Consequently this study aims to present problems and countermeasures against fire safety of high-rise apartment buildings and to construct a residential space to minimize human life and property damage caused by a fire.

  • PDF