• Title/Summary/Keyword: Ground settlement monitoring

Search Result 87, Processing Time 0.02 seconds

Development of Real Time Monitoring Program Using Geostatistics and GIS (GIS 및 지구통계학을 이용한 실시간 통합계측관리 프로그램 개발)

  • Han, Byung-Won;Park, Jae-Sung;Lee, Dae-Hyung;Lee, Gye-Choon;Kim, Sung-Wook
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.1046-1053
    • /
    • 2006
  • In the large scale recent reclaiming works performed within the wide spatial boundary, evaluation of long-term consolidation settlement and residual settlement of the whole construction area is sometimes made with the results of the limited ground investigation and measurement. Then the reliability of evaluation has limitations due to the spatial uncertainty. Additionally, in case of large scale deep excavation works such as urban subway construction, there are a lot of hazardous elements to threaten the safety of underground pipes or adjacent structures. Therefore it is necessary to introduce a damage prediction system of adjacent structures and others. For the more accurate analysis of monitoring information in the wide spatial boundary works and large scale urban deep excavations, it is necessary to perform statistical and spatial analysis considering the geographical spatial effect of ground and monitoring information in stead of using diagrammatization method based on a time-series data expression that is traditionally used. And also it is necessary that enormous ground information and measurement data, digital maps are accumulated in a database, and they are controlled in a integrating system. On the abovementioned point of view, we developed Geomonitor 2.0, an Internet based real time monitoring program with a new concept by adding GIS and geo-statistical analysis method to the existing real time integrated measurement system that is already developed and under useful use. The new program enables the spatial analysis and database of monitoring data and ground information, and helps the construction- related persons make a quick and accurate decision for the economical and safe construction.

  • PDF

Prediction of Preceding Displacement of a Soil-Tunnel by Displacement Monitoring using Horizontal Inclinometer (수평경사계를 이용한 토사터널의 선행변위 예측)

  • Kim, Chu-Hwa;Chae, Young-Su;Park, Yeon-Jun
    • Tunnel and Underground Space
    • /
    • v.18 no.5
    • /
    • pp.355-365
    • /
    • 2008
  • Displacement caused by tunneling is difficult to predict since it is affected by many factors such as ground condition, excavation method and supplementary method of reinforcement. In this study, horizontal inclinometer was employed to monitor ground settlements above a tunnel face before and after the excavation. Monitoring results were analyzed to predict the preceding displacement and settlement of the surface structures. The result of the analysis can be used to establish a proper counter measure which keeps the serviceability of the surface structures. Based on the analysis of the monitoring result, ground properties of the site were deduced and the influence of the tunnel excavation on the settlement of the foundation above the tunnel is analyzed.

A Study on the Long-term Settlements Characterlistics and Settlement Prediction of Soft Ground in West-South Region (서남권 연약지반의 장기침하 특성과 침하예측에 관한 연구)

  • Lee, Seungho;Jung, Jisu;Ji, Younghwan;Kim, Sungmun
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.4
    • /
    • pp.77-91
    • /
    • 2012
  • Recently, construction of housing sites, complexes, roads, ports and airports is increasing for high-intensity use of the country and balanced development between regions. Presently, constructions are being conducted at soft ground. Consequently, engineering problems as long-term settlement of the ground, differential settlement, local structural damage have been reported consistently at construction site. In particular, long-term subsidence of the ground as various constructions and loads by the load will necessarily occur in the soft ground of west-south coast and inland coast. Therefore, in this study, regional proper analysis methods of the Hyperbole method, Hosino method, $\sqrt{S}$ method, Asaoka method etc as existing long-term settlement prediction methods have been examined and a study on new prediction method was conducted through deduction of a generalized equation. Correlation coefficients of soil properties and construction conditions has been analyzed and a matching coefficient of long-term settlement characteristics has been deducted. Comparison and analysis of monitoring data and numerical analysis results of 16 local area have been conducted.

Tunneling-induced Building Damage Risk Assessment System (터널굴착에 따른 인접건물 손상위험도 평가시스템)

  • Park, Yong-Won;Yoon, Hyo-Seok
    • Journal of the Korean Geotechnical Society
    • /
    • v.18 no.3
    • /
    • pp.51-59
    • /
    • 2002
  • This paper deals with development of a damage risk assessment system for adjacent buildings to under-passing tunnel face considering 3D-ground movement. The system consists of building and ground information module, monitoring data module, settlement evaluation module, and building damage risk assessment module. The major modules, settlement evaluation module and building damage assessment module, are based on settlement estimation model suggested by Attewell et al (1982) and the building damage assessment method by Mair et al. (1996). After estimating 3D-ground movements due to tunneling with settlement evaluation module, damage assessment far buildings is performed using building damage risk assessment module. The developed system has two major functions; 1) calculation of 3D-settlement with ground loss ($V_{s}$)or maximum settlement ($w_{max}$) and inflection point (i) using various empirical formulae, monitoring data, numerical results, and so on; 2) assessment of damage risk for adjacent buildings of arbitrary section with position change of tunnel face. The field data given by Boscadin and Cording (1989) leer the case of two-storied masonry building near the Metro tunnel in Washington D.C. was simulated to verify the applicability of the developed system.

A study on the characteristics of primary and secondary settlement for a peat soil in Sri-Lanka (Sri-Lanka내 Peat Soil의 일차압밀 및 이차압축 침하특성에 관한 연구)

  • Jin, Sung-Ki;Lee, Jae-Weon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.235-242
    • /
    • 2004
  • For this study, a Peliyagoda area located on a route was selected among many sections of a CKE(Colombo to Katunayake Expressway) route in Sri-Lanka. Its subground consists of a very weak and thick peat soil named amorphous or fibrous peat. All of data, obtained in the design process of soft ground treatment were analyzed to evaluate the settlement characteristics resulted from an embankment load and to present reasonable methods for estimation of secondary compression settlement. For these purposes, soil parameters were used obtainedby field and laboratory tests the settlement analyses were conducted base on the field monitoring results within 20 months. In addition, Reasonable methods were studied to estimate primary consolidation and secondary compression settlement.

  • PDF

Comparison of measured values and numerical analysis values for estimating smart tunnel based groundwater levels around vertical shaft excavation (수직구 굴착시 스마트 터널기반 지하수위 현장계측과 수치해석 비교 연구)

  • Donghyuk Lee;Sangho Jung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.26 no.2
    • /
    • pp.153-167
    • /
    • 2024
  • Recently the ground settlement has been increasing in urban area according to development. And, this may attribute a groundwater level drawdown. This study presents an analysis of groundwater level drawdown for circular vertical shaft excavation of 「◯◯◯◯ double track railway build transfer operate project」. And, in-situ monitoring data and numerical analysis were compared. So, if we examine the groundwater level drawdown in design, ground conditions should be applied so that the site situation can be reflected. And, groundwater level should be considered a seasonal measurement in order to apply the appropriate groundwater level. It was confirmed a similar predicted value to groundwater level drawdown of in-situ monitoring data.

Case study of volume loss estimation during slurry tbm tunnelling in weathered zone of granite rock (화강풍화대를 통과하는 슬러리 TBM의 체적손실 산정에 대한 사례 연구)

  • Park, Hyunku;Oh, Ju-Young;Chang, Seokbue;Lee, Seungbok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.1
    • /
    • pp.61-74
    • /
    • 2016
  • This paper presents a case study on the ground settlement and volume loss estimation for slurry pressure balanced shield TBM tunnelling in weathered zone of granite rock. Settlement at each stage of shield tunnelling was analyzed and the volume losses and settlement trough factors were estimated from observations. In addition, using the existing volume loss evaluation method in literature, volume losses were estimated considering ground properties and actual driving parameters. Most of ground settlement occurred during passage of shield skin passage and after backfill grouting, and the measured total volume loss and trough curves appeared to coincide with literature. Shield and tail loss obtained from field measurement were found to be around 90% and 60% of the predictions, where tail loss indicated larger deviation than shield loss.

Improvement of soft clay at a site in the Mekong Delta by vacuum preloading

  • Quang, N.D.;Giao, P.H.
    • Geomechanics and Engineering
    • /
    • v.6 no.5
    • /
    • pp.419-436
    • /
    • 2014
  • Soil improvement by preloading with PVD in combination with vacuum is helpful when a considerable load is required to meet the desired rate of settlement in a relative short time. To facilitate the vacuum propagation, vertical drains are usually employed in conjunction. This ground improvement method is more and more applied in the Mekong delta of Vietnam to meet the needs of fast infrastructure development. This paper reports on a pilot test that was carried out to investigate the effect of ground improvement by vacuum and PVD on the rate of consolidation at the site of Saigon International Terminals Vietnam (SITV) in Ba Ria-Vung Tau Province, Viet Nam. Three main aspects of the test will be presented, and namely, instrumentation and field monitoring program, calculation of consolidation settlement and back-analysis of soil properties to see the difference before and after ground improvement.

A Study on the Long-term Settlement Characteristics of Thick Clay Deposits Using Field Monitoring (대심도 연약지반의 현장계측을 이용한 장기침하거동특성 분석에 관한 연구)

  • Kwon, Hyun-Wook;Im, Jong-Chul;Chang, Ji-Gun;Kang, Sang-Kyun
    • Journal of the Korean Geosynthetics Society
    • /
    • v.17 no.4
    • /
    • pp.21-28
    • /
    • 2018
  • Despite a number of studies on consolidation behavior that have been carried out in the Nakdong River estuary in Busan, these are focused on the prediction of final settlement during ground improvement process, and there is almost no research on the long-term settlement occurring after that. For the practical study on the long-term settlement, the field monitored settlement data that measured over 10 years in the Busan new port facilities area were used, and the final settlement and predicted time-settlement line were constituted by hyperbolic function. As a result, the measured settlements depend on the thickness of clayey soils, and the pattern were similar to each other and good agreement with the predicted time-settlement line using hyperbolic method. Also, the settlement in the lower non-improved layer occupied 62-76% of total settlement. Information about above results would be quite helpful to understand the long-term settlement behaviors as well as the non-improved layer's settlement is more careful consideration needed at design phase.

Study on Constructibility considering Changes of Groundwater Level in Kwang Yang port (광양지역 지하수위 변화를 고려한 시공성에 관한 연구)

  • Kim, Byeong-Ho;Yang, Tae-Seon;Lee, Song
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.1120-1125
    • /
    • 2006
  • Larger area will be constructed in a harbor land and container terminal which are constructed in reclaimed land using the dredged materials. Soil improvement work is to be carried out including constructibility, in which is monitoring devices, measuring frequency, installations etc. The ground water tables in the reclaimed area are affected by the several factors which are design reclamation level, consolidation settlement, remaining surcharge pressure and remaining excess pore water pressure. The plan wii be drawn up in which monitoring results for the ground water tables are capable to provide the reliable ground water table when designers and civil engineers construct the harbor structures considering constructibility.

  • PDF