• Title/Summary/Keyword: Ground reinforcement method

Search Result 336, Processing Time 0.025 seconds

A Fundamental Study on the Application of Water Souuble Pouch for Ground Reinforcement (지반보강용 수용성파우치(PVP)의 활용을 위한 기초적 연구)

  • Jung, Dongho;Kim, Kiho;Kim, Joo-Hyun;Han, Jung-Geun
    • Journal of the Korean Geosynthetics Society
    • /
    • v.16 no.2
    • /
    • pp.121-129
    • /
    • 2017
  • There have been a number of water and sewer pipe breakdown reports followed by ground subsidence. Also, the excavating works for construction due to overcrowding of city have been common. Particularly, in urban areas ground becomes unstable because of the lowered lifeline sinkage followed excavation and backfilling. In order to solve the problem, some reinforcement works for ground by rod tamping or grouting have been applied. However, it is hard to predict when the buried utilities in underground will be damaged. Also, there is a limit for the underground exploration and investigation methods. Therefore, in this study, the estimated about the water soluble polymer pouch including poor mixed admixture which is designed to eliminate the dangerous factors. The reinforcement strength of this method was confirmed by verifying three points: meltiness in a certain period, water solubility in the ground water level, and characteristics of the pouch, which can be stored in daily conditions. It is also proved that this method allows to keep the ground from getting weakened in the installation of water and sewer pipe along with back filling materials.

Development of the Fuzzy Expert System for the Reinforcement of Tunels during Construction (터널 시공 중 보강공법 선전용 퍼지 전문가 시스템 개발)

  • 김창용;박치현;배규진;홍성완;오명렬
    • Journal of the Korean Geotechnical Society
    • /
    • v.16 no.6
    • /
    • pp.127-139
    • /
    • 2000
  • In the study, an expert system was developed to predict the safety of tunnel and select proper tunnel reinforcement system using fuzzy quantification theory and fuzzy inference rule based on tunnel information database, For this development, many tunnelling sites were investigated and the applied countermeasures were studied after building tunnel database. There will be benefit for the deciding tunnel reinforcement method in the case of poor ground condition. The expert system developed in the study has two main parts, pre-module and post-module. Pre-module is used to decide input items of tunnel information based on the tunnel face mapping information which can be easily obtained in in-situ site. Then, using fuzzy quantification theory II, fuzzy membership function is composed and tunnel safety level is inferred through this membership function. Post-module is used to infer the applicability of each reinforcement methods according to the face level. The result of the predicted reinforcement system level was similar to measured ones. In-situ data were obtained in three tunnel sites including subway tunnel under Han River. Therefore, this system will be helpful to make the mose of in-situ data available and suggest proper applicability of tunnel reinforcement system to development more resonable tunnel support method without dependance of some experienced experts opinions.

  • PDF

Stability Evaluation for a riverbed tunnel in the Han River at the Fault Zone Crossing (한강 단층대를 통과하는 하저터널의 안정성 확보에 관한 연구)

  • Woo, Jong-Tae;Lee, Song
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.5 no.3
    • /
    • pp.225-231
    • /
    • 2001
  • When building tunnels beneath riverbeds where very large quantities of groundwater inflow exist, added to high water head the soil supporting conditions are very poor because the soil consists of sand and silt, etc. It is necessary to have grouting and mini pipe roof installed in the region for ground reinforcement to decrease permeability. According to this result of horizontal boring and laboratory soil testing, ground reinforcement was achieved by L.W grouting for range of 3.0 times the tunnel radius, to increase stability of the tunnel we used the ling-cut method, 0.8m for one step excavation, shotcrete with 25cm thick, steel lib with H-$125{\times}125$. and a temporary shotcrete invert 20cm thick was installed to prevent deformation of the tunnel.

  • PDF

A case study on the lateral movement of bridge abutment foundation and repair methods (교대의 측방변위와 대책공법에 대한 사례연구)

  • Lee, Byung-Suk;Lee, Jae-Yeol
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.3
    • /
    • pp.1359-1369
    • /
    • 2012
  • In the case of using pile foundation to support bridge abutments on soft ground, the soft ground often causes serious troubles such as lateral movement of bridge abutments by lateral surcharges. In this paper, we investigated and measured the amount of strain of a bridge abutment in the south-western part of Korea. To check the stability and possibility of lateral movement of the bridge abutment, we used the four analysis methods and compared those results; lateral movement index, index for decision of lateral movement and infinite element analysis method. We performed soil and ground tests to fine the causes of the strain and lateral movement. After reviwing several types of repair methods, we suggested the anker reinforcement method along with surcharge process method as a proper repair and rehabilitation of the bridge abutment. Our investigation by through the infinite element analysis method confirmed the effectiveness of the anker reinforcement method allong with the surcharge process method.

A Study on the Improvement Effects of Soft Ground through In-Situ Construction of NDS (NDS공법의 현장시험시공을 통한 지반개량 효과에 관한 연구)

  • Ahn, Joon-Hee;Park, Choon-Sik;Jang, Jeong-Wook;Kang, Hyoung-Nam;Kim, Yong-Sik
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.653-657
    • /
    • 2005
  • This study applied the NDS method to the creek levee and the foundation of a building, for the purpose of ground improvement and cut-off. The conclusions are shown in the following. (1) The results of the field tests in the creek levee are as follows; the N value of the standard penetration test is $2{\sim}3$ before NDS grout and $9{\sim}21$ after NDS grout; in the alluvial layer, $7{\sim}11$ before NDS grout and $14{\sim}23$ after NDS grout. This confirms increasing ground strength with consistency ranging from stiff to very stiff. (2) The result of the permeability test in the creek levee shows that the ground had a great hydraulic conductivity with complete leakage before ground improvement but that the hydraulic conductivity has significantly increased to $3.17{\times}10^{-5}{\sim}4.65{\times}10^{-5}cm/sec$ after ground improvement by the NDS method. (3) The result from the field test of the foundation of the building confirms great reinforcing effects, showing that the allowable bearing capacity has increased from Pa = 5.0 $t/m^2$ before reinforcement to Pa = 25.0 $t/m^2$ after reinforcement.

  • PDF

Tunnel pillar reinforcement effect using PC stranded wire and groutings (PC강연선 및 그라우팅을 이용한 터널 필라부 보강효과)

  • Yeon-Deok Kim;Soo-Jin Lee;Pyung-Woo Lee;Hong-Su Yun;Sang-Hwan Kim
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.2
    • /
    • pp.43-63
    • /
    • 2023
  • With the concentration of the population in the city center and the saturation of the structures on the ground, the development of the underground structures becomes important and the construction of an adjoining tunnel that can reduce the overall problems is respected. In addition, it is necessary to apply the reinforcement construction method for the pillar part of the adjacent tunnel that can secure stability, economy and workability of the site. In this study, the tunnel pillar reinforcement method using prestress and grouting was reviewed. There are various reinforcement methods that can compensate for the problems of the side tunnel, but as the tunnel pillar construction method using prestress and grouting is judged to be excellent in field applicability, stability and economic feasibility, theoretical and numerical analysis of the actual behavior mechanism are conducted. Numerical analysis is divided into PC stranded wire + steel pipe reinforcement grouting + prestress (Case 1), pillar part tie bolt reinforcement (Case 2), pillar part non-reinforcement (Case 3) under the same ground conditions, and the maximum value of the celling displacement, internal displacement, and member force, the stability was confirmed. Through numerical analysis, it was confirmed that Case 1 which reinforced the PC stranded wire, was the best construction method and if it is verified and supplemented through field experiments later, it will be possible to derive superior results in terms of displacement control and member force than the currently applied reinforcement method was judged.

A Study on Verification of the FRP Grouting Effect using 2D Resistivity Survey and Seismic Refraction Methods (지표물리탐사 기법을 이용한 FRP보강 그라우팅 공법의 보강효과 확인에 관한 사례연구)

  • Park, Jong-Ho;Han, Hyun-Hee;Chae, Hwi-young;Kim, Ik-Hee;Cho, Hyun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03b
    • /
    • pp.199-206
    • /
    • 2000
  • The grout-effect evaluation of the ground reinforcement technique, which has been widely applied to civil engineering and construction fields, is not established for the guidelines of choosing the efficient evaluation method, and in fact the experts have little effort to determine the reinforcement effect quantitatively. The evaluation of the grout was carried out by experiments on core specimen and drilling, which is impossible to evaluate grout-reinforcement effect quantitatively. This paper presents an example on verification of FRP grout-effect using geophysical prospecting on ground surface, which is 2D resistivity survey that easily visualize survey results with color graphics and seismic refraction method that interprets the subsurface seismic velocity structure.

  • PDF

A Numerical Study on the NATM Tunnel Reinforcement using Centrifuge Model Experimental value (실험값을 이용한 NATM 터널의 보강효과에 관한 수치 해석적 연구)

  • Huh, Kyung-Han;Kim, Nak-Seok
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.4 no.2 s.13
    • /
    • pp.13-18
    • /
    • 2004
  • In this study, in the first place, parameters primarily influencing displacement and stress were constructed by using the Finite Difference Method; then using those parameters, the result of crown displacement and convergence among the existing, experimental values of a centrifuge model were compared with the result of numerical analysis; and then considering the stress and time effect of lining installation, parameters according to the difference of stiffness were studied. In the result of this study, it found out that rough, ground reinforcement effect manifests itself when reinforcement propert of the grouting of the big scale steel pipe through 3-D analysis is E= 4,000tf/m2 which of the stiffness of the original ground.

Investigation of the Optimum Injection Pressure in Pressure Grouting by Laboratory Model Tests (모형시험을 통한 지반보강 그라우팅의 적정주입압력 연구)

  • 박종호;박용원
    • Journal of the Korean Geotechnical Society
    • /
    • v.19 no.2
    • /
    • pp.217-225
    • /
    • 2003
  • The ground reinforcement effect of pressure grouting depends on grout penetration into ground. It is not, however, easy to predict the grout penetration in the design process because of the heterogeneity of ground conditions. This study investigates the proper grouting pressure and grouting method through laboratory model tests for pressure grouting using loose to medium dense crushed rock and sandy ground using specially designed and fabricated device. The optimum injection pressure, grout quantity and injection time are investigated through performing pressure grouting under changing conditions of injection in this test. From the test results, it was found that optimum injection pressure covers the range of 3 to 4kg/cm$^2$.

An Application of Micropile to Restrain the Settlement of Structure on the Ground Surface caused by Shield Tail Void (실드테일보이드에 의해 발생하는 지표구조물의 침하 억제를 위한 마이크로파일의 적용)

  • 임종철;윤이환;박이근;고호성
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.03a
    • /
    • pp.177-184
    • /
    • 1999
  • In soft ground tunneling, shield method is very good for safety of neighboring structures. Although shield tunnel method has the merits to minimize the deformation of ground around tunnel, ground deformations occurred until the material grouted in tail void hardens are inevitable. In this study, the effects of micropile used as one method to restrain the settlement of neighboring structures by the tail void are studied by laboratory model tests. As a basic test result, the effective direction of micropile and the restraint rate of settlement by micropile reinforcement are known.

  • PDF