• 제목/요약/키워드: Grid line

검색결과 582건 처리시간 0.048초

융합 필라멘트 제조 방식의 3D 프린팅을 이용한 X자 형상 내부 채움 패턴의 출력 옵션 변화에 따른 인장강도 연구 (A Study on Tensile Strength Dependent on Variation of Output Condition of the X-shape Infill Pattern using FFF-type 3D Printing)

  • 나두현;김호준;이용호
    • 소성∙가공
    • /
    • 제33권2호
    • /
    • pp.123-131
    • /
    • 2024
  • Plastic, the main material of FFF-type 3D printing, exhibits lower strength compared to metal. research aimed at increasing strength is needed for use in various industrial fields. This study analyzed three X-shape infill patterns(grid, lines, zigzag) with similar internal lattice structure. Moreover, tensile test considering weight and printing time was conducted based on the infill line multiplier and infill overlap percentage. The three X-shape infill patterns(grid, lines, zigzag) showed differences in nozzle paths, material usage and printing time. When infill line multiplier increased, there was a proportional increase in tensile strength/weight and tensile strength/printing time. In terms of infill overlap percentage, the grid pattern at 50% and the zigzag and lines patterns at 75% demonstrated the most efficient performance.

A Cost-Effective, Single-Phase Line-Interactive UPS System that Eliminates Inrush Current Phenomenon for Transformer-Coupled Loads

  • Bukhari, Syed Sabir Hussain;Atiq, Shahid;Lipo, Thomas A.;Kwon, Byung-il
    • Journal of Electrical Engineering and Technology
    • /
    • 제11권3호
    • /
    • pp.675-682
    • /
    • 2016
  • Sudden voltage drops and outages frequently disturb the operation of sensitive loads for domestic, commercial, and industrial use. In some cases, these events may even impair the functioning of relevant equipment. To maintain power under such conditions, a UPS system is usually installed. Once a disturbance happens at the grid side, the line-interactive UPS system takes over the load to prevent an interruption. But, due to magnetic saturation of the transformer, a significant inrush current may occur for the transformer-coupled loads during this transition. The generation of such transient currents may in turn decrease the line voltage and activates over-current protecting devices of the system. In this work, a cost-effective, line-interactive UPS system is proposed that eliminates the inrush current phenomenon associated with transformer-coupled loads. The strategy was implemented by connecting a standard current-regulated voltage source inverter (CRVSI) to the secondary winding of the load transformer. During any transient condition at the grid side, the load current is monitored and regulated to achieve either seamless compensation of the load current or complete transferal of load from grid to the inverter. Experimental results were obtained for a prototype under all possible operating conditions so as to validate the performance of the proposed topology.

Line Security Evaluation of WANS Considering Protectability of Relays and Vulnerability of Lines

  • Hussain, Akhtar;Seok, Chang-Ju;Choi, Myeon-Song;Lee, Seung-Jae;Lim, Seong-Il
    • Journal of Electrical Engineering and Technology
    • /
    • 제9권6호
    • /
    • pp.1864-1872
    • /
    • 2014
  • Maloperation of protective relays is one of the major causes for cascading tripping in WANS. Another line trip followed by a previous line trip may occur due to overloading of the line, because of the load redistribution or unwanted trip of a backup relay due to change in the flow of fault current. Evaluation of each line is required by considering both of these effects. A new index named Line Security Index (LSI) is proposed in this paper which combines both Vulnerability Index (VI) and Protectability Index (PI) to completely evaluate the security of individual lines and their importance in the power grid. Computer simulations have been performed on the Korean power grid data to establish the feasibility of the proposed idea.

Numerical simulations of two-dimensional floating breakwaters in regular waves using fixed cartesian grid

  • Jeong, Kwang-Leol;Lee, Young-Gill
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • 제6권2호
    • /
    • pp.206-218
    • /
    • 2014
  • The wave attenuation by floating breakwaters in high amplitude waves, which can lead to wave overtopping and breaking, is examined by numerical simulations. The governing equations, the Navier-Stokes equations and the continuity equation, are calculated in a fixed Cartesian grid system. The body boundaries are defined by the line segment connecting the points where the grid line and body surface meet. No-slip and divergence free conditions are satisfied at the body boundary cell. The nonlinear waves near the moving body is defined using the modified marker-density method. To verify the present numerical method, vortex induced vibration on an elastically mounted cylinder and free roll decay are numerically simulated and the results are compared with those reported in the literature. Using the present numerical method, the wave attenuations by three kinds of floating breakwaters are simulated numerically in a regular wave to compare the performance.

마이크로 그리드간 선로제약을 고려한 운영비용 최소화 (Operational Cost Minimization Considering Line Flow Limits of MIcroGrid Connection)

  • 이상봉;김규호;김수남;이상근;김철환
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2009년도 제40회 하계학술대회
    • /
    • pp.151_152
    • /
    • 2009
  • The capacity constraints of tie-lines in production cost analysis are very important issues in the operation and planning of MicroGrid power systems. This paper presents the Harmony Search(HS) algorithm to solve the Economic Dispatch (ED) problem with tie-line capacity limits in MicroGrid system. The applied HS algorithm has achieved efficient and accurate solutions for three-area MicroGrid systems with renewable power units.

  • PDF

도시철도 직류변전소의 회생전력흡수를 위한 계통연계형 인버터 시뮬레이션 (Simulation study of a grid-connected inverter for absorption of regenerative energy in a DC traction substation)

  • 배창한;한문섭;정호성;김용기;박현준
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 추계학술대회 논문집 전기기기 및 에너지변환시스템부문
    • /
    • pp.279-281
    • /
    • 2005
  • In DC traction substation with 12-pulse diode rectifiers, the DC line voltage tends to rise above noload voltage because it can't absorb the regenerative power caused by electric brakes of train. To solve this problem, an IGBT regenerative inverter should be installed and thus recycles the surplus regenerative power by delivering it to the supply grid. In this paper, the DC traction substation equipped with a IGBT regenerative inverter is studied using computer simulation. Matlab/simulink is used to simulate the operation of regenerative inverter which injects the regenerative power into the supply grid and stabilizes the DC line voltage. It is confirmed that the high quality regenerative power is delivered to the supply grid thorough computer simulation.

  • PDF

풍력발전시스템의 배전선로 전압 영향분석 (Distribution Line Voltage Impact Analysis of Wind Power Generation System)

  • 나경윤;고성민;김세호;이수묵;신삼균;김문찬
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 B
    • /
    • pp.1759-1761
    • /
    • 2005
  • The exploitation of the resource wind energy is a rapidly growing area world-wide. The number of installed units is continuously increasing, and therefore, it is important to respect and to deal with the impact of wind power generation system. From the view of an electric grid utility, there is a major problem with the impact of the wind system on the voltage of the electric grid, to which a turbine in connected. The problem is rather common in the connection of a wind power system to an already existing grid, since the grid is very seldom designed for the transmission of additional power. In this paper, it is investigated the voltage impact of distribution line, to which wind power generation system is connected.

  • PDF

GCI와 벽면격자거리를 고려한 2차원 분사유동의 검증 (VERIFICATION OF 2D INJECTION FLOWS WITH GCI AND NEAR-WALL GRID LINE SPACINGS)

  • 원수희;정인석;최정열
    • 한국전산유체공학회:학술대회논문집
    • /
    • 한국전산유체공학회 2005년도 추계 학술대회논문집
    • /
    • pp.287-292
    • /
    • 2005
  • The flowfields generated by gaseous slot injection into a supersonic flow at a Mach number of 3.75 and a Reynolds number of $2.07{\times}10^7$ are simulated numerically. Fine-scale turbulence effects are represented by a two-equation(k-w SST model) closure model which includes $y^+$ effects on the turbulence model. Grid convergence index(GCI) is also considered to provide a measure of uncertainty of the grid convergence. Comparison is made with experimental data and other turbulence model in term of surface static pressure distributions, the length of the upstream separation region, and the penetration height. Results indicate that the k-w SST model correctly predicts mean surface pressure distribution and upstream separation length. However, it is also observed that the numerical simulation over predicts the pressure spike and penetration height compared with experimental data. All these results are taken within $1\%$ error band of grid convergence.

  • PDF

등·변단면 I-형 곡선격자형교의 영향선에 관한 비교연구 (A Comparative Study on Influence Line of Curved I-Girder Grid Bridge with Constant Cross Section and Variable Cross Section)

  • 장병순;서상근;류은열;윤정섭
    • 한국강구조학회 논문집
    • /
    • 제10권4호통권37호
    • /
    • pp.615-627
    • /
    • 1998
  • 곡선 격자형교의 최대 전단력. 최대 휨 모멘트, 최대 순수 비틈모멘트, 최대 뒴비틈모멘트, 최대 바이모멘트를 계산하기 위하여 곡선 격자형교에 작용하는 활하중의 재하위치를 찾는 것이 중요하고 영향선을 이용하면 이 값들을 쉽게 계산할 수 있다. 등 변단면 I-형 곡선격자형교를 해석하기 위해. 본연구에서는 Vlasov의 기초미분방정식을 이용하고, 이의 수치적 해석을 위해 유한차분법을 적용하여 등 변단면의 최대부재력이 발생하는 위치에서 등 변단면의 휨모멘트, 전단력, 순수비틈모멘트, 뒴비틀모멘트, 바이모멘트의 영향선을 구하여 비교 제시하였고 이를 이용해 최대부재력이 발생하도록 하는 활하중의 재하위치를 구하였다.

  • PDF

전기차와 충전기 간 HPGP 기반 통신 신뢰성 테스트 방안 (Test Method of Communication Reliability based on HPGP between PEV and EVSE)

  • 최병곤;김경석
    • 한국인터넷방송통신학회논문지
    • /
    • 제15권2호
    • /
    • pp.111-119
    • /
    • 2015
  • 스마트 그리드(Smart Grid)는 기존의 전력망에 정보 통신 기술을 접목하여 양방향으로 정보를 교환함으로써 에너지 효율을 최적화하는 차세대 지능형 전력망이다. 스마트 그리드 구현을 위한 HPGP 통신 규격은 신흥 스마트 에너지, 홈 자동화, 전기 자동차 통신 어플리케이션 구동을 위해 개발되었다. HPGP 통신 규격은 이전 규격인 HPAV과 상호 운용이 가능하며 저비용, 저전력의 장점이 있다. 새로운 통신 규격의 도입을 위해서는 신뢰성 및 상호 운용성 검증을 위한 분석이 필요하다. 본 논문에서는 이러한 스마트 그리드의 중요한 응용프로그램 중 하나인 전기차와 충전기간 전력선 통신에 대한 신뢰성 테스트 방안으로써 스니퍼 테스트 방법을 제안한다. 또한, 전기차와 충전기 간 HPGP 기반 전력선 통신 환경에서 QCA7000 Device, AVitar, Tool Kit을 이용한 스니퍼 테스트 결과를 분석하였다.