• Title/Summary/Keyword: Government Project Management Organization

Search Result 85, Processing Time 0.029 seconds

A Study on the Agile Approach in Battlefield Management Information System R&D Project in Korea Military (국방 전장관리정보체계 연구개발사업의 애자일 적용 방안 연구)

  • Yun, SungHyun;Lim, GyooGun
    • Journal of Information Technology Services
    • /
    • v.20 no.1
    • /
    • pp.41-54
    • /
    • 2021
  • The SW-centered battlefield management information system R&D project takes a long period of 5-10 years or more by applying a complex and rigid batch acquisition strategy. In order to solve this problem, it is necessary to institutionalize a rapid and flexible battlefield management information system R&D project management procedure applying agile development methodology, and a government project management organization and contract management method to support it In this study, we analyzed the case of applying the Agile development method centered on Scrum to the US SW-centered weapon system R&D project and the characteristics and problems of the battlefield management information system R&D project in Korea, and suggested improvement measures as follows. First, the battlefield management information system R&D model applies the hybrid development method, and the system requirements analysis and system structure design use the existing waterfall development procedure, and the agile method is applied from the SW requirements analysis to the system integration stage. Second, flexible adjustment of performance, schedule, and cost by organizing an Agile IPT in which military (requirements) - DAPA (project management) - developer - functional specialized organizations (test and evaluation, quality, government research institutes, etc.) participate. Third, improving the Basic Order Agreement so that it can be applied to agile R&D.

A STUDY OF STRUCTURING OF NEW MANAGEMENT SYSTEM FOR LOCAL GOVERNMENTS IN JAPAN

  • Takashi Goso;Shunji Kusayanagi;Seigo Nasu;Kotomi Uemoto
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.371-376
    • /
    • 2005
  • Administrative works of local governments in Japan always have been led by central government. Local government organizations have gotten used to control of central government, whose organization is divided vertically into divisions. Such organizations as lack of cooperation of each administrative division could not define strategic goal appropriate for their district independently and could not give an efficient and optimized solution to their strategic goal. Under existing management system, it will be difficult for local governments to rapidly adapt to changing society. Under these circumstances, it is necessary for local governments to structure new management system independent on central government's instructions in order to manage appropriately.

  • PDF

A Study on the status and improvement of construction management in Project Finance Business of Asan Baibang public combination (아산배방 복합단지개발 PF사업의 CM적용 사례와 향후 발전방향에 관한 연구)

  • Kim, Jong-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.19-24
    • /
    • 2008
  • The Construction Management for the Asan Baebang Complex Development PF Project is aiming the solution for the needs of specialized organization and management for the construction of the project, as a independent representative managing the whole process of the super high rise and huge volume of complex project. This case shall be counted as a remarkable one in the point of view that the CM was decided to be encountered even in this consortium project made between the private firm and government, and shows that the project can be executed successfully without having its own organization of a huge number of staffs. This study is for the Construction Management applied for the consortium project between the private firm and government and it is my pleasure if this study could be a help to encourage CM for wide applying in the field by reviewing of its necessity and analyzing of its effect and advantage.

  • PDF

An Innovative Public Project Process Management For the Government Owner (발주자 입장에서 바라본 혁신적인 관급공사 관리 프로세스 제시를 위한 기초 연구)

  • Kim, Sung-Won;Kim, Dea-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.557-562
    • /
    • 2008
  • In Korean construction industry, a public sector's ordering volume has been constantly increased after 2000. But, because a cost, schedule and quality control generally depends on a result-centric management form and a transparent management is not done during the construction in the Korean public business, it is recognized that this causes problems including an increase of cost and schedule, incomplete construction, a difficulty to find the problem in advance to establish measures, and an unclear locus of responsibility of constructor, supervisor and designer. Accordingly, this study is intended to derive the problems and the limit of management by identifying and analyzing the management state of the present government construction client for the client organization of public sector's government construction. Also, the study is intended to contribute to the client's efficient and actual project management by presenting the model of supplementing or improving the derived problem and limits to the client's organization.

  • PDF

A Study on the Role Model of an Integrated Management System for Government Informatization (국가정보화의 통합적 관리체계를 위한 역할 모형에 관한 연구)

  • Im, Sung-Mook
    • Journal of the military operations research society of Korea
    • /
    • v.32 no.1
    • /
    • pp.159-175
    • /
    • 2006
  • Korea e-government sets the goal of reaching the full integration stage. In this study, we propose a role model of the National Informatization Agency which is a fundamental organization for achieving the goal. The National Informatization Agency assumes full charge of support functions needed for consistent and efficient accomplishment of all the e-government projects, and those functions include e-government planning, project administration, national IT resource operation, national standards management, and project audit and evaluation. The proposed role-model is expected to be a theoretical basis for innovative government at informatization.

Development of R&D Knowledge Management System (KMS) for Science & Technology Research Institutes (과학기술 종합지식 경영시스템 (R&D-KMS) 구축)

  • Shim, Kyung
    • Journal of Korean Society of Archives and Records Management
    • /
    • v.1 no.2
    • /
    • pp.121-158
    • /
    • 2001
  • Development of R&D Knowledge Management System for Science & Technology Research Institutes, which was initiated early 2001, was introduced. The project, funded by the Ministry of Science and Technology, is being carried out by several R&D institutes in cooperation With implementers. The purposes of the project are: sharing knowledge about on-going research progresses and existing research results, facilitating cooperative efforts among research staff, teams, and institutes, and improving the efficiency of research project administration. The system consists of 4 components that are highly intertwined: Knowledge Portal, Knowledge Repository, Project Administration System and Groupware. This 3-year project will benefit R&D researchers, and R&D project carrying-out institutes and government project administration organization by facilitating research and development activities, and improving management efficiency, respectively.

Individual Factors Influence on Client Involvement: the Case Construction Projects in Saudi Arabia

  • Trigunarsyah, Bambang;Al-Solaiman, Sultan
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.578-582
    • /
    • 2015
  • Lack of client involvement in construction of public projects has been identified as the main cause of many operational problems. Clients need to perform their roles and responsibilities effectively and efficiently at the right time and through the use of correct methods in order to have the optimum involvement required during all the construction project phases, namely, the planning, design, construction, handover, and operation and maintenance phase. This paper investigates the influence of clients' individual factors on their involvement in construction project delivery. A questionnaire survey was distributed to various government agencies of the Kingdom of Saudi Arabia (KSA). Explanatory Factory Analysis was performed to group nineteen individual factors. The factor analysis result suggests that the individual factors that can involve clients' involvement in construction projects can be grouped into five, which are: adequacy of knowledge and experience for decision making in the early stage of design; ability to communicate clearly; job satisfaction; personal skills; and expertise in design and construction.

  • PDF

Factors Influencing Human Resource Planning (HRP) for Local Workforce Supply in Malaysian Construction Industry

  • Dom, Norhidayah Md;Kasim, Narimah;Shamsudin, Alina
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.1
    • /
    • pp.5-13
    • /
    • 2012
  • The lacks of local workforce supply become a problematic in Malaysian construction industry. Meanwhile, HRP is important during workforce supply to help organizations in order to appoint the right people in the right job. This paper reports on the use of factors influencing HRP towards local workforce supply in the construction industry in general, and Malaysian construction in particular. Semi structured interviews were conducted to 10 interviewees from the government and non-government organizations to investigate current issues of local workforce and the practices of HRP in the construction organization. The analysis methods were based on descriptions of previous tested research. The findings reveal that the lack of local workforce is due to low wages system, safety issues, educational changes, low status and unsecured work, environment in construction industry, developments and technologies changes in Malaysia. The internal factors of HRP were practiced among construction organization are organization strategy, organizational culture, organization changes, leadership and experience, nature of work and empowerment of labor. Meanwhile, the external factors are technology changes, economic changes, legislation and demographic changes. The paper provides valuable information on the practices of factors influencing HRP for local workforce supply in Malaysian construction industry.

A study on the development direction and performance analysis of design review system in design-build project (글로벌 건설공사의 턴키설계심의제도 성과분석 및 발전방향)

  • Park, Hwan-Pyo;Chin, Kyung-Ho;Lee, Kyo-Sun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.95-97
    • /
    • 2011
  • The purpose of this study is to suggest the development direction and performance analysis of design review system in design-build project. As a result of surveys, the fairness and transparency of design review system was abruptly increased. But local government has not fairness and transparency. Therefore this research has proposed the integration management and joint application of design review organization in design-build project. So, we expect that the transparency is raised in management of design review committee.

  • PDF

A Strategy of Information Management System for Construction Company (건설산업의 효율적 정보관리체계 구축전략)

  • Lee Tai Sik;Kim Yong Chan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.458-461
    • /
    • 2001
  • The whole of industry sectors are getting achieved BPR(Business process Reencountering) which innovate the inefficient product organization through examined the value chain. Besides, they try to integrate ERP, CRM, and SCM which is based on value chain. Construction Industry, however, not only is not regularized it but is not inadequacy about information mind. Nowadays Korean government lead the construction CALS, only some large company Innovate and restructure the organization and product structure. It Is necessary to efficient manage the project information and historical data and develop CIC/PMIS to transfer from the function based information-flow to the project based information-flow. The purpose of the Information management system's success In Korea, therefore, this paper analyzes the information-intensive problems and proves the device to achieve the Information Management System through the Standardization, Synchronization, Centralization for Construction Company.

  • PDF