Proceedings of the Korean Institute of Building Construction Conference
/
2002.11a
/
pp.117-121
/
2002
The purpose of this study was to Identification the Risk of construction method to protect and reduce the risk of construction period. For this study we are using the pre and during construction period Inspection list. The inspection list was used by construction company for check a flaw of Construction field. So we rearrange the individual item of inspection list to match the Risk factor. This inspection list usually has the difference of importance because this list is not made by Method which is not focused on Method. Therefore, To find the difference of these importance, We surveyed this matter by doing interview of specialist group. To find the application of field and the possibility of measurement of Risk status, We tested Risk occurring frequency and it's strength by checking the level of Risk. The results of this study were as follows; Each Method Check List made out through the rearrangement of Construction Inspection list which used in construction company. To solve and compensate the matter which happened by changing the each Method Check List to each General Inspection List, we added the each Method Check List by checking the importance of check list of each process. By doing this, The Check List for finding Risk level of Method was created by using the check list of each Method.
Journal of the Korea Institute of Building Construction
/
v.2
no.4
/
pp.131-135
/
2002
The purpose of this study was to Identification the Risk of construction method to protect and reduce the risk of construction period. For this study we are using the pre and during construction period Inspection list. The inspection list was used by construction company for check a flaw of Construction field. So we rearrange the individual item of inspection list to match the Risk factor. This inspection list usually has the difference of importance because this list is not made by Method which is not focused on Method. Therefore, To find the difference of these importance, We surveyed this matter by doing interview of specialist group. To find the application of field and the possibility of measurement of Risk status, We tested Risk occurring frequency and it's strength by checking the level of Risk. The results of this study were as follows; Each Method Check List made out through the rearrangement of Construction Inspection list which used in construction company. To solve and compensate the matter which happened by changing the each Method Check List to each General Inspection List, we added the each Method Check List by checking the importance of check list of each process. By doing this, The Check List for finding Risk level of Method was created by using the check list of each Method.
Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
/
2004.05a
/
pp.36-41
/
2004
STX Shipbuilding Company is under construction design the marine training ship if Korea Maritime University. Processing q this training ship development, model test results and design if general arrangement results are introduced in this paper.
The purpose of this research is to find out the difference of success factors of End-User Computing (EUC) which are applicable to our corporations. There have been many researches related to EUC success factors, however, as the researches have been concentrated on limited type of business areas or have been studied without distinguishing the differences of characteristics of business areas, these researches are not sufficient to cover the situation of the corporations, in general. In this research, the range of companies to be investigated was widely extended to such as electric and electronic company, banking, construction company, petroleum and chemistry company, machinery and metal company, and beverage and food company. EUC success factors which influence the factors that are used to evaluate the EUC performance for each business area were found to be different. The result of this research can be useful for a company which is seeking EUC success factors for its own business area.
This paper is resulted from the research to activate Self-control Safety Management system that adopted to improve an assessment system for Hazard Prevention Plan. And members of company, university and research institute have jointly participated in the research. First, it is investigated that introduced background and processing method with existing practical data & materials references in order to understand what domestic Self-control Safety Management system will be available for. And general construction company at site have their ability to assess Hazard Prevention Plan by mailing questionnaire to on thousand site, visits, and interviews. Also, It is investigated how much they have the assessment ability. It is selected to do a questionnaire survey for the status of self-regulatory safety assessment ability of the designated self-regulatory companies in order to produce and enhance the self-regulatory assessment ability and the necessity of Self-control Safety Management system. Finally, it is selected to do a questionnaire survey for fixing and the enhance Self-control Safety Management system of general construction contractors.
Sohn, Jeong Rak;Lee, Dong Gun;Bang, Jong Dae;Kim, Jin Won
Land and Housing Review
/
v.10
no.3
/
pp.67-75
/
2019
The modular construction means that more than 70% of the parts such as walls, windows, electrical wiring, facility piping, bathrooms, and kitchen appliances are pre-assembled at the factory and transported to the site. It is possible to shorten the construction period than general construction work and to secure high quality through modular mass production since the modular construction works in the field at the same time as the modular production. However, there are only four domestic modular manufacturers, and each company's modular components and construction methods are different, so it is necessary to standardize them. Therefore, this study investigated the construction process centering on the stacking method of modular housing construction work applied to D site in Cheonan-si, and proposed the key points of quality management by construction stage. As the project was conducted as a pilot project for government R&D projects, some differences may occur from general modular housing construction. However, the construction process and quality control focus of each unit box type modular house analyzed in this study can be used as basic data in the future of modular housing construction. In addition, the results of this study can be used to establish construction standards, such as the development of checklists and establishment of standard processes.
Korean Journal of Construction Engineering and Management
/
v.17
no.3
/
pp.3-12
/
2016
Recently, construction industry shows active expansion in overseas construction market. But the active work limited in construction work, on the other hand, design-drawing work is evaluated shortage of competitive power. So this study aim to improve the competitive of 'domestic design-drawing work'thorough objective evaluation. Objective evaluation is consist of 'design attribution'. Design attribution is based on the execution drawing and complement by existing reasearch, expert interview. And then, list up the 'design attribution' evaluation list to carry out a survey targeting hands-on worker. Survey is consist of 'Likert 5-point scale, FMEA method'. As a result, construction company and design company show different opinions in both relative position evaluation and importance evaluation.
Song Hyung-Suk;Kim Kyoon-Tai;Han Choong-Hee;Kim Sun-Kuk
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.385-388
/
2002
The construction industry has complicated production processes with diverse disciplines and subcontractors, which is the major cause of lowered productivity. To solve this problem, multi-trade subcontract system is recently suggested. Some general construction companies have applied this method to some sections of work process. However, this is in the early stage of application. The purpose of this study is to define an integrated contract package for improving both contractor and subcontractor efficiency. First, this study recognizes construction company to need of multi-trade subcontract system. Finally, it suggests feasible activities which can be useful for a construction company to apply to this subcontract system.
Mechanical facilities in modern buildings and industrial plants become more important in the view points of energy and environment issues. However, mechanical construction fields are still considered as to be subjected to buildings, even though design and construction of mechanical fields in the construction production process is independent of other fields. Recently, 'Framework Act on the Construction Industry' has been revised since 2007. According to the revision, the barrier of general construction and specialized construction is collapsed and the construction company can register any type of construction classification if they are able to carry out the construction mission. The mechanical construction fields are exempt until 2011 because of the protection of mechanical construction industry. In the present study, the bidding system has been prospected due to the revision of 'Basic Law on Construction Industry' after 2011. The trends for development of mechanical construction fields has been also discussed.
International conference on construction engineering and project management
/
2007.03a
/
pp.327-336
/
2007
Construction activities are characterized as hazardous work. Therefore, it is very imperative to explore comprehensively fatal accidents and safety performance in both developed and developing countries. The goal of this study was to look at the reasons behind fatal accidents in HCMC, Vietnam's largest city. The survey sample consists of 91 fatal accident cases in total that occurred in construction sites during the years 1996-2005 and were reported to the Department of Labor-Invalids-Social Affairs in HCMC. The study was conducted by means of field surveys with relevant individuals working in construction sites and statistical analyses. The research resulted in failing to wear/use PPE as unsafe acts and in poor safety management procedures/methods in sites as insecurely working conditions behind serious accidents in the construction. The paper stresses that accidents tended to occur more in state-owned companies than in others and involved more with masonry/welding people and workers without labor contracts than with other workers.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.