• Title/Summary/Keyword: Gap Risk

Search Result 254, Processing Time 0.028 seconds

Accident Analysis and Usage Actual Condition about Roller (롤러기 재해분석 및 사용실태 조사)

  • Choi, Jin-Woo;Shin, Woon-Chul
    • Journal of the Korean Society of Safety
    • /
    • v.27 no.5
    • /
    • pp.16-21
    • /
    • 2012
  • The purpose of this study is to try to find the risk of roller(mixing mill) in working site. In order to achieve the purpose, accident analysis and survey was carried out. This analysis revealed that average of loss days is 334.3 by roller jamming accident and 229.2 by other causes. It means jamming accident entails serious bodily harm. According to our research, we realize that most of rollers have some risk of the jamming accidents. It is simply because the roll gap in the roller is not more than 10cm. It also does not meet minimum distance so as to avoid the risk for jamming accident by KS. Furthermore, 28% of rollers have only one switch and 40% of rollers have two switches operating emergence stop equipment so as to reduce the risk of jamming accidents. Therefore, we presume that it is very difficult to turn on the switch of emergence stop equipment when they confront the accident because most of engineers are working alone.

A Study on the Effect of Risk Communication on the Formation of Safety Culture (위험소통이 안전문화 형성에 미치는 영향에 관한 연구)

  • Cha, Youngi-Shin
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2023.11a
    • /
    • pp.153-154
    • /
    • 2023
  • 본 연구에서는 인간의 의사소통이 갖고 있는 복잡한 과정을 고려하여 재난 시 위험의 소통방식에서 나타나는 오류들을 분석하고, 안전문화를 정착시키기 위한 방법 중 가장 효과적인 방법의 하나로 "위험소통"을 그 대안으로 제시하고자 하였다. 또한 안전문화를 개인의 과제가 아닌 조직 내에서의 협동과제로 인식하고, 조직 내 소통을 통한 신뢰가 안전문화에 미치는 영향력에 집중하였다. 본 연구의 제안을 통해 위험소통에 대한 새로운 원칙들을 제시함으로써 조직 내 안전문화의 새로운 방향을 도모하고자 한다.

  • PDF

Development of Semantic Risk Breakdown Structure to Support Risk Identification for Bridge Projects

  • Isah, Muritala Adebayo;Jeon, Byung-Ju;Yang, Liu;Kim, Byung-Soo
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.245-252
    • /
    • 2022
  • Risk identification for bridge projects is a knowledge-based and labor-intensive task involving several procedures and stakeholders. Presently, risk information of bridge projects is unstructured and stored in different sources and formats, hindering knowledge sharing, reuse, and automation of the risk identification process. Consequently, there is a need to develop structured and formalized risk information for bridge projects to aid effective risk identification and automation of the risk management processes to ensure project success. This study proposes a semantic risk breakdown structure (SRBS) to support risk identification for bridge projects. SRBS is a searchable hierarchical risk breakdown structure (RBS) developed with python programming language based on a semantic modeling approach. The proposed SRBS for risk identification of bridge projects consists of a 4-level tree structure with 11 categories of risks and 116 potential risks associated with bridge projects. The contributions of this paper are threefold. Firstly, this study fills the gap in knowledge by presenting a formalized risk breakdown structure that could enhance the risk identification of bridge projects. Secondly, the proposed SRBS can assist in the creation of a risk database to support the automation of the risk identification process for bridge projects to reduce manual efforts. Lastly, the proposed SRBS can be used as a risk ontology that could aid the development of an artificial intelligence-based integrated risk management system for construction projects.

  • PDF

Development of Model to Evaluate Thermal Fluid Flow Around a Submerged Transportation Cask of Spent Nuclear Fuel in the Deep Sea

  • Guhyeon Jeong;Sungyeon Kim;Sanghoon Lee
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.20 no.4
    • /
    • pp.411-428
    • /
    • 2022
  • Given the domestic situation, all nuclear power plants are located at the seaside, where interim storage sites are also likely to be located and maritime transportation is considered inevitable. Currently, Korea does not have an independently developed maritime transportation risk assessment code, and no research has been conducted to evaluate the release rate of radioactive waste from a submerged transportation cask in the sea. Therefore, secure technology is necessary to assess the impact of immersion accidents and establish a regulatory framework to assess, mitigate, and prevent maritime transportation accidents causing serious radiological consequences. The flow rate through a gap in a containment boundary should be calculated to determine the accurate release rate of radionuclides. The fluid flow through the micro-scale gap can be evaluated by combining the flow inside and outside the transportation cask. In this study, detailed computational fluid dynamic and simplified models are constructed to evaluate the internal flow in a transportation cask and to capture the flow and heat transfer around the transportation cask in the sea, respectively. In the future, fluid flow through the gap will be evaluated by coupling the models developed in this study.

Development of Computing Model for the Process and Operation Interval of Reinforced Concrete Work using Web-CYCLONE (철근콘크리트 골조공사의 프로세스 및 공정 공백 산출 시뮬레이션 모형 개발)

  • Park, Sang-Min;Son, Chang-Baek;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.341-343
    • /
    • 2012
  • This study introduces a method for computation of process and operation gap in the specific construction operation(i.e., RC frame construction applying a block-grouping scheme) using CYCLONE-based simulation modeling and analysis technique. Since uncertainty of construction environment exists, a thoughtful production planning is required to effectively deal with a risk resulting in schedule delay in advance. This study presents the concepts of a time delay occurred in a process level and operation level in a operation model, and a method of measuring gap-times in each level while the simulation progresses. It helps a site manager to decide how many segmentation in a construction block is suitable for eliminating unproductive time-delays under the constrained resources (e.g., laborer, equipment). A case study presents a network model representing a three segmented RC frame work, and result obtained from the simulation experiment.

  • PDF

A Study of the Effective Factors on the Consumer's Adoption of Casulal Hanbok. -Focused on the Perceived Risk and Product Expressive Self-Image- (생활한복의 채택 영향요인에 관한연구 -위험지각과 자기이미지를 중심으로-)

  • 최은영
    • Journal of the Korean Society of Costume
    • /
    • v.42
    • /
    • pp.43-58
    • /
    • 1999
  • The purpose of this study was to investigate the effect of perceived risk and product express-ive self-image on the consumer's adoption of casua hanbok. A questionnaire was developed and data colle-cted from 269 women in Pusan. Data were analyzed to investigate the relation-ship among purchase intention perceived risk and product epressive self-image. Marketing implication about risk reduction was discussed. The results of this study were as follows. 1. Consumer's perceived risk on adoption o casual hanbok classified into four factors They were the risk on the confirmation of advantage of casual hanbok the risk on the negative viewpoint of others the risk on the complexity of dressing and care and the risk on the shortcoming of casual hanbok. It was explained that casual hanbok is innovative product. 2. According to the level of adoption of casual hanbok. consumers were categorized into three groups i.e. adopter potential adopter rejector. They differed in the degree of risk perception age and subjective knowledge redlated to casual hanbok. 3. Consumer's subjective knowledge age and two types of risk has predicting power to the purchase intention. Consumer's subjective knowledge was the best predicted factor and risk perception was negatively related to purchase intention. 4. The significant differences among the categ-orized consumer group was founded in the ideal self image and product expressive self-image 5. The gap of perception between ideal self-image and product expressive self-image was significantly different in each categorized consumer groups.

  • PDF

Strengthening Risk Evaluation in Existing Risk Diagnosis Method

  • Wong, Shui Yee;Chin, Kwai Sang;Tang, Dawei
    • Industrial Engineering and Management Systems
    • /
    • v.9 no.1
    • /
    • pp.41-53
    • /
    • 2010
  • An existing risk diagnosing methodology (RDM) diagnoses corporate risk for product-innovation projects. However, it cannot evaluate and compare the risk levels of multiple alternatives in the product development stage. This paper proposes a modified risk diagnosis method to fill the gap of risk evaluation in selections of innovative product alternatives and the application of the method will be also illustrated by a case problem on alternative selections in electrical dimmer designs. With RDM as the foundation, a modified RDM (MRDM) is proposed to deal with the problem of selecting innovative project alternatives during the early stages of product development. The Bayesian network; a probabilistic graphical model, is adopted to support the risk pre-assessment stage in the MRDM. The MRDM is proposed by incorporating the risk pre-assessment stage into the foundation. By evaluating the engineering design risks in two electrical dimmer switches, an application of the MRDM in product innovation development is successfully exemplified. This paper strengthens the existing methodology for RDM in innovative product development projects to accommodate innovative alternatives. It is advantageous for companies to identify and measure the risks associated in product development so as to plan for appropriate risk mitigation strategies.

Architects' Perceptions on Identifying Major Risk Factors and Mitigation Measures in Green Building Design :The Case of South Korea

  • Kim, Jinho
    • Architectural research
    • /
    • v.21 no.3
    • /
    • pp.69-77
    • /
    • 2019
  • Architects are facing increasing risks that result from heightened expectations of benefits and performance when designing green buildings compared to traditional buildings. This study aims to explore the possible risk factors for architects in green building projects in South Korea and assess risk mitigation measures. To attain this goal, 14 risk factors and 12 mitigation measures were determined through an extensive literature review. A questionnaire was administered to architects practicing green building design and criticality index was employed to assess major risk factors and mitigation measures. This study identified 'adoption of new technology and process', 'green building certification results', 'building products and materials', and 'energy saving uncertainty' as the major risk factors of green building projects. Additionally, the questionnaire proposed 'contract indicating each party's role, liability, and limitations clearly', 'utilizing integrated design process', and 'understanding client's goal in green building projects' as the three most effective risk mitigation measures in designing green buildings. There are few studies that focus on architects' perceived risks concerning green building projects; this study contributes to a deeper knowledge and attempts to fill the current literature gap, which would benefit South Korea's green building design practice by aiding in the development of better risk management strategies.

Earnings Variability and Capital Market Opening (자본시장 개방과 소득 변동성)

  • Kim, Dae Il
    • Journal of Labour Economics
    • /
    • v.29 no.1
    • /
    • pp.1-39
    • /
    • 2006
  • This paper documents the increase in earnings variability (or earnings risk) during the 1990s in Korea, and investigates whether it can be accounted for by capital market opening. The variances of transitory and permanent innovations in earnings are estimated from repeated cross-section data using a simple econometric framework. The increasing time-series pattern of earnings risk among men follows the increased foreign capital presence reasonably well, but the supporting cross-sectional evidence for a causal relationship between the two is weak. However, foreign direct investment (FDI) is found to have had some non-neutral effects on workers of varying skills in such a way that transitory earnings risk of less-skilled workers relatively increased with FDI. To the extent that transitory innovations are not fully insured, this widening effect of FDI on earnings risk gap may have contributed to widening welfare gap between skilled and unskilled workers in Korea, at least in terms of "risks."

  • PDF

A Framework for Quantifying the Damage to Residential Facilities Caused by Typhoon Changes (태풍 변화로 인한 주거시설 피해 정량화 프레임 워크 제안)

  • Kim, Ji-Myong;Son, Seunghyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.6
    • /
    • pp.797-807
    • /
    • 2023
  • This research aims to investigate the alterations in typhoon patterns attributable to climate change and to quantitatively assess the risk of damage to residential structures. The increasing prevalence of climate anomalies and severe weather events, a consequence of global warming, is causing escalating damage globally. Notably, numerous countries are facing substantial devastation due to shifts in typhoon trajectories. Despite this, there exists a gap in empirical research quantifying the impact of these changes on building integrity and the associated risk alterations driven by climate change. In addressing this gap, our study analyzes the frequency and intensity of typhoons impacting Korea, examining the evolution of these meteorological phenomena. Furthermore, we employ the Korean Typhoon Vulnerability Function for residential facilities to quantify the altered risk posed by these changing patterns. The outcomes of this study provide the private sector with essential data to formulate diverse scenarios and business strategies in response to the escalating risks of typhoon-related damage. Additionally, it equips governmental bodies with the necessary insights to develop comprehensive risk management strategies to mitigate the effects of future typhoons.