• Title/Summary/Keyword: Fuzzy Multi-Criteria Approach

Search Result 38, Processing Time 0.039 seconds

The Generator Maintenance Scheduling using Fuzzy Multi-criteria (퍼지다목적함수를 이용한 발전기보수유지계획의 수립)

  • 최재석;도대호;이태인
    • Proceedings of the Korean Institute of Intelligent Systems Conference
    • /
    • 1995.10b
    • /
    • pp.131-138
    • /
    • 1995
  • A new technique using integer programming based on fuzzy multi-criteria function is proposed for generator maintenance scheduling. Minimization maintenance delay cost and maximization reserve power are considered for fuzzy multi-criteria function. To obtain an optimal solution for generator maintenance scheduling under fuzzy environment, fuzzy multi-criteria integer programming is used. In the maintenance scheduling, a characteristic feature of the presented approach is that the crisp constraints with uncertainty can be taken into account by using fuzzy set theory and so more flexible solution can be obtained. The effectiveness of the proposed approach is demonstrated by the simulation results.

  • PDF

Optimal Software Release Using Time and Cost Benefits via Fuzzy Multi-Criteria and Fault Tolerance

  • Srivastava, Praveen Ranjan
    • Journal of Information Processing Systems
    • /
    • v.8 no.1
    • /
    • pp.21-54
    • /
    • 2012
  • As we know every software development process is pretty large and consists of different modules. This raises the idea of prioritizing different software modules so that important modules can be tested by preference. In the software testing process, it is not possible to test each and every module regressively, which is due to time and cost constraints. To deal with these constraints, this paper proposes an approach that is based on the fuzzy multi-criteria approach for prioritizing several software modules and calculates optimal time and cost for software testing by using fuzzy logic and the fault tolerance approach.

Disaster Recovery Priority Decision of Total Information System for Port Logistics : Fuzzy TOPSIS Approach (항만물류종합정보시스템의 재난복구 우선순위결정 : 퍼지 TOPSIS 접근방법)

  • Kim, Ki-Yoon;Kim, Do-Hyeong
    • Journal of Information Technology Services
    • /
    • v.11 no.3
    • /
    • pp.1-16
    • /
    • 2012
  • This paper is aimed to present a fuzzy decision-making approach to deal with disaster recovery priority decision problem in information system. We derive an evaluation approach based on TOPSIS(Technique for Order Performance by Similarity to Ideal Solution), to help disaster recovery priority decision of total information system for port logistics in a fuzzy environment where the vagueness and subjectivity are handled with linguistic terms parameterized by trapezoidal fuzzy numbers. This study applies the fuzzy multi-criteria decision-making method to determine the importance weight of evaluation criteria and to synthesize the ratings of candidate disaster recovery system. Aggregated the evaluators' attitude toward preference, then TOPSIS is employed to obtain a crisp overall performance value for each alternative to make a final decision. This approach is demonstrated with a real case study involving 4 evaluation criteria(system dependence, RTO, loss, alternative business support), 7 information systems for port logistics assessed by 5 evaluators from Maritime Affairs and Port Office.

Flexible Maintenance Scheduling of Generation System by Multi-Probabilistic Reliability Criterion in Korea Power System

  • Park, Jeong-Je;Choi, Jae-Seok;Baek, Ung-Ki;Cha, Jun-Min;Lee, Kwang-Y.
    • Journal of Electrical Engineering and Technology
    • /
    • v.5 no.1
    • /
    • pp.8-15
    • /
    • 2010
  • A new technique using a search method which is based on fuzzy multi-criteria function is proposed for GMS(generator maintenance scheduling) in order to consider multi-objective function. Not only minimization of probabilistic production cost but also maximization of system reliability level are considered for fuzzy multi-criteria function. To obtain an optimal solution for generator maintenance scheduling under fuzzy environment, fuzzy multi-criteria relaxation method(fuzzy search method) is used. The practicality and effectiveness of the proposed approach are demonstrated by simulation studies for a real size power system model in Korea in 2010.

Development of a Method for the Generator Maintenance Scheduling using Fuzzy Integer Programming (퍼지 정수계회법을 이용한 발전기 보수유지계획 수립 수법의개발)

  • 최재석;도대호
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.7 no.5
    • /
    • pp.77-85
    • /
    • 1997
  • A new technique using integer programming based on fuzzy multi-criteria function is proposed for generator maintenance scheduling. Minimization of maintenance delay cost and maximization of supply reserve power are considered for fuzzy multi-criteria function To obtain an optimal solution for gen- ,:rator maintenance scheduling under fuzzy environment, fuzzy multi-criteria integer programming is )used. In the maintenance scheduling, a characteristic feature of the presented approach is that the crisp conaitraints with uncertainty can be taken into account by using fuzzy set theory and so more flexible solution Ian he obtained. The effectiveness of the proposed approach is demonstrated by the simulation results.

  • PDF

A Fuzzy TOPSIS Approach Based on Trapezoidal Numbers to Material Selection Problem

  • Celik, Erkan;Gul, Muhammet;Gumus, Alev Taskin;Guneri, Ali Fuat
    • Journal of Information Technology Applications and Management
    • /
    • v.19 no.3
    • /
    • pp.19-30
    • /
    • 2012
  • Material selection is a complex problem in the design and development of products for diverse engineering applications. This paper is aimed to present a fuzzy decision making approach to deal with the material selection in engineering design problems. A fuzzy multi criteria decision-making model is proposed for solving the material selection problem. The proposed model makes use of fuzzy TOPSIS (Technique for Order reference by Similarity to Ideal Solution) with trapezoidal numbers for evaluating the criteria and ranking the alternatives. And result is compared with fuzzy VIKOR (VlseKriterijumska Optimizacija I Kompromisno Resenje in Serbian, means Multi criteria Optimisation and Compromise Solution) which is proposed by Jeya Girubha and Vinodh [2012]. The present paper is aimed to also improve literature of fuzzy decision making for material selection problem.

Fuzzy and Multi Criteria Decisions for Business Management in Product Design Industries

  • Liao, Shih-Chung
    • The Journal of Industrial Distribution & Business
    • /
    • v.5 no.3
    • /
    • pp.5-14
    • /
    • 2014
  • Purpose - This study illustrates research product industrial engineering, which needs to be promoted to encourage knowledge intensive businesses. Research traditions related to industrial business products and a fuzzy multi criteria decision approach in technology management for product design industries have undergone continuous changes over time. However, there is no clarity on the present situation, and there is a need to reform business enterprises. Research design, data, and methodology - Using fuzzy theory and appraising multi-goal plans, the manner of promoting the competitive advantage of industrial businesses is analyzed using a case study. In the case study, various aspects are examined, such as product design and manufacture, fuzzy set decisions with multi attribute policy making, flaws in the present system, and a review of the related literature. Results - New fuzzy and multi criteria designs can improve the existing keyboard by solving product problems, resulting in a clear and durable typeface for a creative LED keyboard. Conclusion - Using a fuzzy set with multi attribute policy-making influences the achievements appraisal system and can help achieve the anticipated strategy goal of product design.

Maintenance Scheduling of Generation System by Fuzzy Set Theory (퍼지집합이론을 이용한 발전기보수유지계획수립)

  • Park, Jeong-Je;Choi, Jae-Seok;Baek, Ung-Ki;Cha, Jun-Min
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.127_128
    • /
    • 2009
  • A new technique using a search method which is based on fuzzy multi-criteria function is proposed for GMS(generator maintenance scheduling) in order to consider multi-objective function. Not only minimization of probabilistic production cost but also maximization of system reliability level are considered for fuzzy multi-criteria function. To obtain an optimal solution for generator maintenance scheduling under fuzzy environment, fuzzy multi-criteria relaxation method(fuzzy search method) is used. The practicality and effectiveness of the proposed approach are demonstrated by simulation studies for a real size power system model in Korea in 2010.

  • PDF

The Spatial Fuzzy Approach to Multi-Criteria Decision Analysis for Flood Management (홍수터 관리 최적대안 결정을 위한 공간퍼지접근)

  • Lim, Kwang-Suop;Choi, Si-Jung
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2009.05a
    • /
    • pp.1647-1651
    • /
    • 2009
  • The uncertainty or imprecision associated with vague parameters and weighting sets, reduces the ability to decide what alternative is better for a particular location. To efficiently reduce the effect of imprecision frequently arising in available information, fuzzy theory has been used to improve consideration of imprecision in a Multi-Criteria Decision Analysis (MCDA) problem. Fuzzy logic offers a way to represent and handle imprecision present in continuous real world applications. A GIS implementing fuzzy set theory, (referred to in this paper as the "Spatial Fuzzy Approach") enables decision makers to express imprecise concepts associated with geographic data and provides decision makers the ability to have even more definition and discrimination in terms of the best alternatives for a particular spatial location. This study is focused on addressing questions pertaining to the methodology of floodplain analysis using GIS and Spatial Fuzzy MCDA to evaluate flood damage reduction alternatives. The issues will be examined in a case study of the Suyoung River Basin in Pusan, Korea.

  • PDF

A Study on the Flexible Generator Maintenance Scheduling using Fuzzy Theory (퍼지이론을 이용한 유연한 발전기보수유지계획 수립에 관한 연구)

  • Kim, Hong-Sik;Moon, Seung-Pil;Choi, Jae-Seok
    • Proceedings of the KIEE Conference
    • /
    • 1999.07c
    • /
    • pp.1104-1107
    • /
    • 1999
  • A new technique using search method based on fuzzy multi-criteria function is proposed fur flexible generator maintenance scheduling. Minimization of probabilistic production cost, maximization of system reliability level and air pollution are considered fur fuzzy multi-criteria function. To obtain an optimal solution for generator maintenance scheduling under fuzzy environment fuzzy multi-criteria relaxation method(fuzzy search method) is used. The practicality and effectiveness of the proposed approach are demonstrated by the simulation results of the real size model system of KEPCO-1997 SYSTEM.

  • PDF