• Title/Summary/Keyword: Frequency Generator

Search Result 1,195, Processing Time 0.028 seconds

Design of High Average Power Pulse Transformer for 30-MW Klystron of L-Band Linac Application (산업용 선형가속기 시스템 적용을 위한 30-MW 클라이스트론용 고 평균전력 펄스 트랜스포머의 설계)

  • Jang, S.D.;Son, Y.G.;Gwon, S.J.;Oh, J.S.;Bae, Y.S.;Lee, H.G.;Moon, S.I.;Kim, S.H.;Cho, M.H.;NamKung, W.
    • Proceedings of the KIEE Conference
    • /
    • 2006.07c
    • /
    • pp.1550-1551
    • /
    • 2006
  • An L-band linear accelerator system for e-beam sterilization is under design for bio-technology application. The klystron-modulator system as RF microwave source has an important role as major components to offer the system reliability for long time steady state operation. A PFN line type pulse generator with a peak power of 71.5-MW, $7{\mu}s$, 285 pps is required to drive a high-power klystron. The high power pulse transformer has a function of transferring pulse energy from a pulsed power source to a high power load. The pulse transformer producing a pulse with a peak voltage of 275 kV is required to produce 30-MW peak and 60 kW average RF output power at the frequency of 1.3-GHz. We have designed the high power pulse transformer with 1:13 step-up ratio. The peak and average power capability is 71.5-MW (275 kV, 260 A at load side with $7{\mu}s$ pulse width) and 130 kW, respectively. In this paper, we present a system overview and initial design results of the high power pulse transformer.

  • PDF

Assessment of Offshore Wind Power Potential for Turbine Installation in Coastal Areas of Korea (터빈설치를 위한 한국 연안 해상풍력발전 부존량 평가)

  • Kang, Keum Seok;Oh, Nam Sun;Ko, Dong Hui;Jeong, Shin Taek;Hwang, Jae Dong
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.30 no.4
    • /
    • pp.191-199
    • /
    • 2018
  • In this paper, wind data at 20 locations are collected and analyzed in order to review optimal candidate site for offshore wind farm around Korean marginal seas. Observed wind data is fitted to Rayleigh and Weibull distribution and annual energy production is estimated according to wind frequency. As the model of wind turbine generator, seven kinds of output of 1.5~5 MW were selected and their performance curves were used. As a result, Repower-5 MW turbines showed high energy production at wind speeds of 7.15 m/s or higher, but G128-4.5 MW turbines were found to be favorable at lower wind speeds. In the case of Marado, Geojedo and Pohang, where the rate of occurrence of wind speeds over 10 m/s was high, the capacity factor of REpower's 5 MW offshore wind turbine was 56.49%, 50.92% and 50.08%, respectively.

Analysis of Effect of Spoofing Signal According to Code Delay in GPS L1 Signal (GPS L1 신호에서 코드지연에 따른 기만신호 영향 분석)

  • Kim, Tae-Hee;Sin, Cheon-Sig;Lee, Sang-Uk
    • Journal of Satellite, Information and Communications
    • /
    • v.7 no.1
    • /
    • pp.128-133
    • /
    • 2012
  • In this paper, we analysis the effect of error of code tracking and frequency tracking according to the chip delay of spoofing signal through the simulation. Firstly, we investigate the type of spoofing signal and defense technical of spoofing attack. For simulation, we generated the intermediate spoofing signal using the software GNSS signal generator simulator(SGGS), the intermediate spoofers synchronize its counterfeit GPS signals with the current broadcast GPS signals. The software GPS receiver simulator(SGRS) received the spoofing signal and normal signal from SGGS, and process the signals. In paper, we can check that the DLL and PLL tracking loop error are generated and pseudo-range is changed non-linear according to chip delay of spoofing signal when the spoofing signal is entered. As a result, we can check that navigation solution is incorrectly effected by spoofing signal.

Analysis of Performance of Spoofing Detection Algorithm in GPS L1 Signal (GPS L1 기만신호 검출 알고리즘 성능 분석)

  • Kim, Taehee;Kim, Jaehoon;Lee, Sanguk
    • Journal of Satellite, Information and Communications
    • /
    • v.8 no.2
    • /
    • pp.29-35
    • /
    • 2013
  • In this paper, we investigate the type and detection methode of spoofing attack, and then analyze the performance of spoofing detection algorithm in GPS L1 signal through the simulation. Generally spoofer is different from the jammer, because the receiver can be operated and not. In case of spoofing the GPS receiver is hard to recognize the spoofing attack and can be operated normally without stopping because the spoofing signal is the mimic GPS signal. To evaluate the performance of spoofing detection algorithm, both the software based spoofing and GPS signal generator and the software based GPS receiver are implemented. In paper, we can check that spoofing signal can affect to the DLL and PLL tracking loop because code delay and doppler frequency of spoofing. The spoofing detection algorithm has been implemented using the pseudorange, signal strength and navigation solution of GPS receiver and proposed algorithm can effectively detect the spoofing signal.

Dedicated Cutback Control of a Wind Power Plant Based on the Ratio of Command Power to Available Power

  • Thapa, Khagendra;Yoon, Gihwan;Lee, Sang Ho;Suh, Yongsug;Kang, Yong Cheol
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.3
    • /
    • pp.835-842
    • /
    • 2014
  • Cutback control in a grid code is one of the functions of a wind power plant (WPP) that is required to support the system protection and frequency stability. When a cutback control command signal is delivered to the WPP from the system operator, the output of a WPP should be decreased to 20% of the rated power within 5 s. In this paper, we propose a dedicated cutback control algorithm of a WPP based on the ratio of the command power to the available power. If a cutback control signal is delivered, the algorithm determines the pitch angle for the cutback control and starts the pitch angle control. The proposed algorithm keeps the rotor speed at the speed before the start of the cutback control to quickly recover the previous output prior to the cutback control. The performance of the algorithm was validated for a 100 MW aggregated WPP based on a permanent magnet synchronous generator under various wind conditions using an EMTP-RV simulator. The results clearly shows that the proposed algorithm not only successfully reduces the output to the command power within 5 s by minimizing the fluctuation of the pitch angle, but also rapidly recovers to the output level before the cutback control.

New On-Chip RF BIST(Built-In Self Test) Scheme and Circuit Design for Defect Detection of RF Front End (RF Front End의 결함 검출을 위한 새로운 온 칩 RF BIST 구조 및 회로 설계)

  • 류지열;노석호
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.8 no.2
    • /
    • pp.449-455
    • /
    • 2004
  • This paper presents a novel defect detection method for one chip RF front end with fault detection circuits using input matching measurement. We present a BIST circuit using 40.25{\mu}m$ CMOS technology. We monitor the input transient voltage of the RF front end to differentiate faulty and fault-free RF front end. Catastrophic as well as parametric variation fault models are used to simulate the faulty response of the RF front end. This technique has several advantages with respect to the standard approach based on current test stimulus and frequency domain measurement. Because DUT and fault detection circuits are implemented in the same chip, this test technique only requires use of digital voltmeter (RMS meter) and RF voltage source generator for simpleand inexpensive testing.

Parameter Evaluation of High-Power Pulse Transformer for L-Band 30-MW Klystron (L-band 30-MW 클라이스트론용 고출력 펄스트랜스포머의 파라미터 평가)

  • Jang, S.D.;Son, Y.G.;Kwon, S.J.;Oh, J.S.;Kim, S.H.;Yang, H.R.;Moon, S.I.;Kwon, B.H.;Cho, M.H.;NamKung, W.
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.1079-1081
    • /
    • 2007
  • An L-band Linear Accelerator System for E-beam sterilization is under construction for bio-technology application. The klystron-modulator system as an RF microwave source has an important role as major components to offer the system reliability for long time steady-state operations. A PFN line type pulse generator with a peak power of 71.5-MW, $7\;{\mu}s$, 285 pps is required to drive a high-power klystron. The high power pulse transformer has a function of transferring pulse energy from a pulsed power source to a high power load. The pulse transformer producing a pulse with a peak voltage of 275 kV is required to produce 30-MW peak and 60 kW average RF output power at the frequency of 1.3-GHz. We have designed the high power pulse transformer with 1:13 step-up ratio. The peak and average power capability is 71.5-MW (275 kV, 260 A at load side with $7\;{\mu}s$ pulse width) and 130 kW, respectively. In this paper, we present measurements and its analysis on the design parameters, and an initial test result as well as a design concept on the high-power pulse transformer.

  • PDF

The Development of the Contamination Prevention Module of an Optical Window Using Ultrasonic Waves (초음파를 이용한 광학창 오염방지 모듈 개발)

  • Lee, ChangHee;Jeon, KiMun;Shin, JaeSoo;Yun, JuYoung;Cho, Seonghyun;Kang, Sang-Woo
    • Journal of the Korean Vacuum Society
    • /
    • v.22 no.4
    • /
    • pp.175-180
    • /
    • 2013
  • We developed the contamination prevention module of an optical window for an In-Situ Particle Monitor (ISPM) system. the core part of the module is the generator of an ultrasonic wave and the module is to remove particles stuck to the window by the transfer of the wave force to the window surface. In order to enhance transfer efficiency of the waves the frequency of the ultrasonic wave was optimized and a low impedance material (plexiglass) and a soft sealing material (Si rubber) were used. The ISPM with the developed module was installed at the exhaust line of a BPSG CVD equipment and the effect of the module was verified.

Korean Learning Assistant System with Automatically Extracted Knowledge (자동 추출된 지식에 기반한 한국어 학습 지원 시스템)

  • Park, Gi-Tae;Lee, Tae-Hoon;Hwang, So-Hyun;Kim, Byeong Man;Lee, Hyun Ah;Shin, Yoon Sik
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.1 no.2
    • /
    • pp.91-102
    • /
    • 2012
  • Computer aided language learning has become popular. But the level of automation of constructing a Korean learning assistant system is not so high because a practical language learning system needs large scale knowledge resources, which is very hard to acquire. In this paper, we propose a Korean learning assistant system that utilizes easily obtainable knowledge resources like a corpus, web documents and a lexicon. Our system has three modules - problem solving, pronunciation marker and writing assistant. Automatic problem generator uses a corpus and a lexicon to make problems with one correct answer and three distracters, then verifies their suitability by utilizing frequency information from web documents. We analyze pronunciation rules for a pronunciation marker and recommend appropriate words and sentences in real-time by using data extracted from a corpus. In experiment, we evaluate 400 automatically generated problems, which show 89.9% problem suitability and 64.9% example suitability.

The Analysis of Underground Power Line Communication Channel Characteristics by Measurements (지중전력선 통신채널 측정에 의한 특성해석)

  • Shin, Dong-Hwan;Choi, Jeong-Yeon;Lee, Seung-Jun;Woo, Hui-Gon;Shin, Jai-Ho;Eom, Ki-Hwan
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2009.10a
    • /
    • pp.86-89
    • /
    • 2009
  • In this paper, a broadband power line communication modem and network technology to develop tests with actual characteristics of the underground power line communication channel to be interpreted. Length and structure of the underground distribution line due to underground distribution line to the broadband powerline communication channels to measure the amount of attenuation on the signal generator, spectrum analyzer, such as contactless coupler was used to configure the channel measurement system. Demonstration tests in the test line as a single line by selecting the longest high-voltage lines where the two-channel measurement and signal attenuation on the noise level was measured. Measuring results degrade communication performance can be quite sure that was the presence of impulse noise, long lines, the line length was confirmed by the high-frequency attenuation appears.

  • PDF