• 제목/요약/키워드: Free-Formed building

검색결과 18건 처리시간 0.028초

비정형 초고층 빌딩의 Parametric Design을 위한 BIM 활용에 관한 연구 (A Parametric design study for free-formed super tall building using BIM)

  • 김형일
    • 한국디지털건축인테리어학회논문집
    • /
    • 제12권1호
    • /
    • pp.109-118
    • /
    • 2012
  • The Purpose of this study is to develop a design process of free-formed super tall buildings with parametric design approach using BIM. Before BIM tools like Revit was developed, it is considered as very time consuming process and requires extensive efforts and costs for making free-formed super tall building modeling. Current trends of free-formed super tall building are for proofing city's economic strength and symbol. New digital tools have been developed and used for pursuing many design methods for building design. In this study, BIM based Parametric design approach is studied to seek for possibility of generating free-formed super tall building fast, easily, and accurately.

UHPC 외장패널을 활용한 비정형 곡면 파사드의 시공사례에 대한 연구 - 삼성동 KEB 하나은행 리모델링 공사 - (Study on Construction Example of Free Formed Curved Facade using External UHPC Panels -Focused on the Remodeling Construction of Samsung-dong KEB Hana Bank -)

  • 박영미;김혜원;박기홍;김성진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 춘계 학술논문 발표대회
    • /
    • pp.62-63
    • /
    • 2017
  • According to the rapid development of digital technology, the free formed buildings with complex and various curved surfaces are being constructed. Most of the external cladding of free formed buildings have been applied materials such as metal, glass, FRP, GFRC, etc. However, these materials have many disadvantages such as a complicated manufacturing process for realizing 3D irregular shape and an increase in production period and cost. Therefore, the studies for UHPC which is an optimized material for overcoming this problem for a long time in overseas. This study reviewed the remodeling construction of Samsung-dong KEB Hana Bank appling the exterior curved UHPC panel for the first time in Korea. As a result, we confirmed the possibility of UHPC panels with various free formed shapes.

  • PDF

QFD를 이용한 비정형 거푸집 제작 시스템 개발 기초연구 (A Preliminary Study to Develop Manufacturing System of Free-Formed Form using QFD)

  • 이동윤;홍준호;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 춘계 학술논문 발표대회
    • /
    • pp.60-61
    • /
    • 2017
  • In free-formed formwork, there is a problem that the productivity of the construction is deteriorated due to the expensive form, the long manufacturing period, and the high degree of construction difficulty. In order to solve these limitations, there is a need to research improvement from the phase of manufacturing free-formed form. Therefore, this study is to derive significant technical characteristics using QFD approach as a preliminary study to develop manufacturing system of the free-formed form for improving the productivity of free-formed construction formwork. This study employs the QFD to reflect users' needs into technical characteristics, and analyze correlation between users' requirements and the technical characteristics, then weights them by their importance.

  • PDF

3차원 디지털 설계를 통한 비정형 콘크리트 구조물의 구현기술 개발 (Development of the Free-formed Concrete Structure Construction Technologies using 3D Digital Design)

  • 박영미;조성준;김성진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.205-208
    • /
    • 2012
  • Recent the free-formed architecture is smearing as a trend with the development of the digital equipment and technologies. The development of new method based on digital technology is required for the free-formed structure,, because the conventional construction methods are limited to shorten the construction period and to ensure the construction quality. Particularly, the development of the new method for the free-formed concrete structure is important. In this study, the developed method of the T-shape lightweight steel fabricated using CNC can control the geometries of the free-formed concrete structure based on the digital design. Also, new method is effective to ensure the precision of the construction and economic than the conventional construction methods.

  • PDF

비정형 콘크리트 거푸집 제작을 위한 EPS Foam의 3D 가공기계 (3D Cutting Machine of EPS Foam for Manufacturing Free-Formed Concrete Mold)

  • 서정환;홍대희
    • 한국정밀공학회지
    • /
    • 제34권1호
    • /
    • pp.35-39
    • /
    • 2017
  • We used a construction method using a CNC milling machine, where free-formed molds were made by cutting EPS (Expanded PolyStyrene) foam with the CNC machine, to build free-formed buildings. CNC milling is off-the-shelf technology that can easily cut EPS foam; however its production cost is too high and the time to manufacture an EPS mold is too long. This paper proposes a novel cutting machine with a fast and cost effective mechanism to manufacture EPS concrete molds. Our machine comprises a cutter and Cartesian coordinate type moving mechanism, where the cutter cuts EPS foam using a hotwire in the shape of '$\sqcap$' and is capable of adjusting its cutting angle in real-time while keeping its cutting width. We proved through cutting experiments on the CNC machine that cutting time was greatly shortened compared to the conventional method and that the resulting concrete mold satisfied manufacturing precision.

LOM 방식 3D 프린터를 이용한 비정형 콘크리트 부재 생산 프로세스 및 Mock-up test (The Production Process and Mock-up Test of Freeform Concrete Segments using LOM type 3D Printer)

  • 이동윤;이동민;조훈희;강경인
    • 한국건축시공학회지
    • /
    • 제18권1호
    • /
    • pp.89-98
    • /
    • 2018
  • 최근 비정형 건축물의 관심과 수요가 증가하면서 비정형 건축물 시공기술에 관한 중요도가 높아지고 있다. 그러나 국내의 비정형 콘크리트 부재 시공기술은 거푸집으로 제작하는 것에 많은 시공기간과 공사비용이 소요된다. 따라서 본 연구에서는 비정형 콘크리트 부재 생산 시 생산기간을 단축하고 비용을 절감할 수 있는 LOM 방식의 3D 프린터를 이용한 비정형 콘크리트 부재 생산 프로세스를 제시하고, Mock-up test를 통해 생산프로세스의 타당성을 검증하였다. 연구결과, 본 생산 프로세스는 기존 강재 거푸집을 이용한 시공기술 대비 약 47.8% 제작기간 단축 효과와 56.2%의 비용절감 효과가 나타났다. 본 연구의 결과인 3D 프린터를 이용한 비정형 콘크리트 부재 생산 프로세스는 비정형 콘크리트 부재 생산의 생산성 향상을 비롯한 비정형 건축물 시공의 새로운 공법활성화에 기여할 것으로 기대된다.

Sloped-LOM 방식 3D 프린터를 이용한 비정형 EPS 거푸집 제작 공법 개발 (Development of Method for Manufacturing Freeform EPS Forms Using Sloped-LOM Type 3D Printer)

  • 안희재;이동윤;지우종;이우재;조훈희
    • 한국건축시공학회지
    • /
    • 제20권2호
    • /
    • pp.171-181
    • /
    • 2020
  • 최근 비정형 건축물이 한 나라의 기술적 우월성을 나타내는 새로운 척도로 부상하기 시작하면서 비정형 건축물을 효율적으로 제작하는 기술이 중요해지고 있다. 하지만 기존의 목재, 철재 거푸집 등을 CNC 기술로 가공하여 비정형 거푸집을 제작하는 방식은 제작시간과 재료 비용 측면에서 한계점이 존재한다. 따라서 본 연구에서는 S-LOM 방식의 3D 프린팅 기술을 통한 비정형 EPS 거푸집 제작 공법을 개발하고 제작 프로세스를 제시하였다. 또한 실물 모형 시험을 통해 기존 CNC 밀링 기술과의 제작시간 및 정밀도에 대한 비교 분석을 실시하였다. 연구결과, S-LOM 방식의 3D 프린팅 기술을 활용할 경우 CNC 밀링 기술 대비 약 57.4%의 제작시간 단축 효과가 있었다. 또한 S-LOM 방식의 3D 프린팅 기술의 경우 설계도면 대비 약 20.5mm의 오차의 최대 절댓값이 발생하였다. 본 연구의 결과는 거푸집 제작시간과 정밀도 측면에서 S-LOM 방식 기술의 현장 적용 가능성을 확인하여, S-LOM 방식 기술의 개선 및 공법 활성화에 기여할 수 있을 것으로 사료된다.

사례 분석을 통한 국내 BIM 적용 문제점 및 대안 도출에 관한 연구 (Suggesting Solutions when Applying Building Information Modeling (BIM) to the Korean Construction Industry through Case Studies)

  • 박정욱;김상철;이상수;송하영
    • 한국건축시공학회지
    • /
    • 제9권4호
    • /
    • pp.93-102
    • /
    • 2009
  • 건축물의 초고층화, 복합화, 비정형 및 생산성 증대, 지속가능성 등의 해소방안으로 BIM(Building Information Modeling)에 대한 관심도가 증가되었고, 국내에서도 BIM에 대한 관심이 높아져 건설관련업계에는 하루가 다르게 BIM 확산이 진행되고 있다. 따라서, BIM의 정의와 특징을 파악하고 국내와 해외의 사례를 검토하여 BIM의 성공적인 도입 방안에 대한 내용을 본 논문에서 분석하고자 하며, 아울러, 국내 BIM적용 사례를 비교분석 함으로써 국내 BIM적용의 문제점과 해결 방안을 모색하고자 한다.

저온양생하에서 거푸집 종류에 따른 콘크리트의 압축강도와 적산온도 특성 평가 (Evaluation of the Compressive Strength and Maturity According to Form Types in Low Temperature)

  • 최시현;문영범;김재영;이한승
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 추계 학술논문 발표대회
    • /
    • pp.5-6
    • /
    • 2016
  • When concrete exposed to low temperatures, the free water in the concrete is freeze. If the pressure developed exceeds the tensile strength of the concrete, the cavity will dilate and rupture. It cause expansion and cracking, scaling and crumbling of the concrete. In this study, to prevent such damage, five different types of form were used. Concrete was poured into each form, cured for 7 days at temperature of -10℃. To measure the temperature history, two thermocouples were installed on each of the inside and outside. And to measure the compressive strength, collected core from each form. The maturity is formed by temperature history. The maturity and the compressive strength has a correlation.

  • PDF

건축공사 현장의 공사관리를 위한 BIM (Building Information Modeling) 적용과 효과 분석 (Application and Effects Analysis of BIM(Building Information Modeling) for Construction Management of a Construction Field)

  • 최재현;류한국
    • 한국건축시공학회지
    • /
    • 제15권1호
    • /
    • pp.115-121
    • /
    • 2015
  • 최근 건축물이 대형화되고 비정형화됨에 따라 기존의 2차원 도면으로 3차원을 표현하는 데 한계가 있고 설계오류파악, 공사 물량과 공사비 오차의 발생, 시공오류의 예측 부재, 기둥, 보, 기계설비 배관 등의 부재간의 충돌 등의 문제점을 개선하고자 건설 현장에서 BIM(Building Information Modeling; 이하 BIM)이 사용되고 있다. 그러나 실질적으로 건설 공사 현장의 직원들을 대상으로 BIM의 사용법을 교육하고 평가하여 실질적인 구현 방법을 충분히 숙지하게 한 이후에 BIM을 공사 현장의 공사 관리 업무에서 사용하게 하여 BIM 사용에 따른 효과를 분석한 연구는 전무하다. 이에 본 연구는 BIM의 교육, 평가, 실시에 따른 공사현장에서 BIM의 효과를 설문조사를 통하여 실증적으로 분석하고 개선방향을 제시하고자 한다.