• Title/Summary/Keyword: Foundation soil

Search Result 1,113, Processing Time 0.028 seconds

A Study on Friction Anisotropy between Sand and Surface Asperities of Plate Using Modified Direct Shear Test (수정된 직접 전단 시험기를 이용한 모래와 표면 돌출부를 갖는 플레이트 사이의 마찰 이방성에 대한 연구)

  • Lee, Seung-Hun;Chong, Song-Hun
    • Journal of the Korean Geotechnical Society
    • /
    • v.38 no.2
    • /
    • pp.29-38
    • /
    • 2022
  • The friction anisotropy of shear resistance can be selectively used in geo-structures. For example, larger axially loaded deep foundation, soil nails, and tiebacks increase load carrying capacity due to induced large shear resistance while pile penetration and soil sampling produce minimal shear resistance. Previous studies confirmed direction-dependent shear resistance induced by interface between soil and surface asperity of plate inspired by geometrical shape of snake scale. The aim of this paper is to quantitatively evaluate interface friction angle with different surface asperities. Using the modified direct shear test, a total of 51 cases, which sand are prepared at the relative density of 40%, are conduced including 9 plates, two shear direction (shearing direction against the height of surface asperity is increased or decreased during shearing test), and three initial vertical stress (100 kPa, 200 kPa, 300 kPa). Experimental results show that shear stress is increased with higher height of surface asperity, shorter length of surface asperity, and the shearing direction that the height of surface asperity increases. Also, interface friction angle is decreased with larger surface asperity ratio, and shearing direction with increasing height of surface asperity produces larger interface friction angle regardless of the surface asperity ratio.

A Study on the Restoration of the Wangheungsa Temple's Wooden Pagoda (왕흥사 목탑의 복원 연구)

  • Kim, Kyeong-Pyo;Sung, Sang-Mo
    • Journal of architectural history
    • /
    • v.19 no.3
    • /
    • pp.7-29
    • /
    • 2010
  • The form of the Wangheungsa Temple's wooden pagoda site is that of the traditional form of the wooden pagodas constructed during the Baekjae Period. Likewise, it is an important ruin for conducting research on the form and type of the wooden pagodas constructed during the Baekjae Period. In particular, the method used for the installation of the central pillar's cornerstone is a new technique. The purpose of this research is to restore the ruin of the Wangheungsa Temple's wooden pagoda of the Baekjae Period that remains at the Wangheungsa Temple's wooden pagoda site. Until now, research conducted on the wooden pagoda took place mostly centered on the Hwangryongsa Temple's wooden pagoda. Meanwhile, the reality concerning Baekjae's wooden pagoda is one in which there were not many parallel cases pertain to the design for restoration. This research paper wants to conduct academic examination of the Wangheungsa Temple's wooden pagoda to organize the intention of design and design process in a simple manner. This research included review of the Baekjae Period's wooden pagoda related ruins and the review of the existing wooden pagoda ruin to analyze the wooden pagoda construction technique of the era. Then, current status of the Wangheungsa Temple's wooden pagoda site is identified to define the characteristics of the wooden pagoda, and to set up the layout format and the measure to estimate the size of the wooden pagoda in order to design each part. Ultimately, techniques and formats used for the restoration of the wooden pagoda were aligned with the wooden pagoda of the Baekjae Period. Basically, conditions that can be traced from the current status of the Wangheungsa Temple site excavation using the primary standards as the standard. Wangheungsa Temple's wooden pagoda was designed into the wooden pagoda of the Baekjae's prosperity phase. The plane was formed into $3{\times}3$ compartments to design into three tier pagoda. The height was decided by factoring in the distance between the East-West corridors, size of the compartment in the middle, and the view that is visible from above the terrace when entering into the waterway. Basically, the origin of the wooden structure format is based on the Goguryeo style, but also the linkage with China's southern regional styles and Japan's ancient wooden pagoda methods was factored in. As for the format of the central pillar, it looks as if the column that was erected after digging the ground was used when setting up the columns in the beginning. During the actual construction work of the wooden pagoda, central pillar looks as if it was erected by setting up the cornerstone on the ground. The reason that the reclaimed part of pillar that use the underground central cornerstone as the support was not utilized, was because the Eccentric Load of the central pillar's cornerstone was factored in the state of the layers of soil piled up one layer at a time that is repeated with the yellow clay and sandy clay and the yellow clay that were formed separately with the $80cm{\times}80cm$ angle at the upper part of the central pillar's cornerstone was factored in as well. Thus, it was presumed that the central pillar was erected in the actual design using the ground style format. It is possible to presume the cases in which the reclaimed part of pillar were used when constructed for the first time, but in which central pillar was installed later on, after the supplementary materials of the underground column is corroded. In this case, however, technique in which soil is piled up one layer at a time to lay down the foundation of a building structure cannot be the method used in that period, and the reclamation cannot fill up using the $80cm{\times}80cm$ angle. Thus, it was presumed that the layers of soil for building structure's foundation was solidified properly on top of the central pillar's cornerstone when the first wooden pagoda construction work was taking place, and that the ground style central pillar was erected on its upper part by placing the cornerstone once again. Wangheungsa Temple's wooden pagoda is significant from the structure development aspect of the Korean wooden pagodas along with the Hwangryongsa Temple's wooden pagoda. Wangheungsa Temple's wooden pagoda construction technique which was developed during the prosperity phase of the Baekjae Period is presumed to have served as a role model for the construction of the Iksan Mireuksa Temple's wooden pagoda and Hwangryongsa Temple's wooden pagoda. With the plan to complement the work further by excavating more, the basic wooden pagoda model was set up for this research. Wangheungsa Temple's wooden pagoda was constructed as at the Baekjae Kingdom wide initiative, and it was the starting point for the construction of superb pagoda using state of the art construction techniques of the era during the Baekjae's prosperous years, amidst the utmost interest of all the Baekjae populace. Starting out from its inherent nature of enshrining Sakyamuni's ashes, it served as the model that represented the unity of all the Baekjae populace and the spirit of the Baekjae people. It interpreted these in the most mature manner on the Korean peninsula at the time.

Comparison of Construction Costs for Bridge Foundation with Optimization of Steel and PHC Embedded Piles (강관 및 PHC 매입말뚝의 최적화에 따른 교량기초의 공사비 비교)

  • Yun, Jung-Mann;Yea, Geu-Guwen;Kim, Hong-Yeon;Kim, Dong-Min;Kim, Soo-Lo
    • Journal of the Korean Geosynthetics Society
    • /
    • v.15 no.4
    • /
    • pp.71-78
    • /
    • 2016
  • In this study, execution costs of the foundation system are compared with PHC and steel pile in the same soil layers and load condition. Steel piles installed on the thin weathered rock are reduced as 12.5% in comparison with the number of PHC piles. Steel piles installed on the soft rock through weathered rock with 1.7m of thickness reduce the number of piles as 35.7% (STK 400) and 46.4% (STK 490), respectively, in comparison with PHC piles installed on the weathered rock. Also, they reduce the number of piles as 26.5% (STK 400) and 38.8% (STK 490), respectively, in comparison with steel piles (STK 400) installed on the weathered rock. When the thickness of footings is constant, steel piles installed on the soft rock may reduce the area of footings up to 12.2% (STK 400) and 45.4% (STK 490), respectively, in comparison with PHC piles installed on the weathered rock. Total cost of foundation system installed on the soft rock with steel piles (STK 400) increases as 12%, whereas in case of replaced with steel piles (STK 490), it reduces as 16% in comparison with PHC piles installed on the weathered rock. This is because the cost reduction due to the number of piles and footing area is more effective despite high cost of steel piles (STK 490). When the thickness of weathered rock is less than 5m, installing steel piles (STK 490) on the soft rock through it is more economic in comparison with installing PHC piles on the weathered rock.

Effect of Average and Cyclic Shear Stress on Undrained Cyclic Behavior of Marine Silty Sand (해양 실트질 모래의 비배수 동적 거동에 대한 평균 및 반복전단응력의 영향)

  • Muhammad, Safdar;Son, Su-Won;Kim, Jin-Man
    • Journal of the Korean Geotechnical Society
    • /
    • v.30 no.1
    • /
    • pp.17-25
    • /
    • 2014
  • Offshore wind turbine foundations are subjected to wind, current and wave loadings. Hence, both static and cyclic behaviors of foundation's soil are important for the design of offshore wind turbine foundation. Undrained cyclic behaviors of soils depend upon the number of loading cycles, vertical effective stress, cyclic shear strain, relative density, and the combination of cyclic and average shear stresses. In order to evaluate the effect of average and cyclic shear stresses on the undrained cyclic behavior of marine silty sand, cyclic direct simple shear (CDSS) tests are performed with relative density of 85%, vertical effective stress of 200 and 300 kPa, and failure criteria of either 15% double amplitude cyclic shear strain (${\gamma}_{cyc}$) or permanent shear strain (${\gamma}_{p}$). The results are presented in the form of design graphs or contour diagrams. The undrained cyclic behavior of marine silty sand is found to be dependent on cyclic and average shear stresses and/or the combination of both shear stresses. It is found that when significant average shear stress exists the permanent or progressive shear strain is the govering failure criteria instead of cyclic shear strain.

Behavior of Quaywall Pile by Lateral Movement of Revetment on Soft Ground (연약지반 호안의 측방유동에 따른 안벽 말뚝의 거동)

  • Shin, Eunchul;Park, Jeongjun;Ryu, Ingi
    • Journal of the Korean GEO-environmental Society
    • /
    • v.7 no.4
    • /
    • pp.53-62
    • /
    • 2006
  • Recently, the lateral displacement of the passive piles which are installed under the revetment on the soft ground is very important during the land reclamation work along the coastal line. The revetment on the soft clay develops the lateral displacement of ground when the revetment loading exceeds a certain limit. The lateral displacement of ground causes an excessive deformation of underground structure itself and develops lateral earth pressure against the pile foundation. The subject of study is to investigate the lateral displacement of pile foundation during the construction of container terminal at the ${\bigcirc}{\bigcirc}{\bigcirc}{\bigcirc}$ port in Incheon. The displacement of pile and the vertical settlement were measured in the field and finite element method(FEM) analysis for each construction sequence was performed using AFFIMEX(Ver 3.4). From the comparison of the results from field measurement and the finite element analysis, the settlement of the reventment has already occurred at the time of field measurements. Since then, the noticeable lateral displacement of piles and settlement were occurred during the filling of dredged soil inside the revetment dredging and reclaiming work. After completing filling, the lateral displacement and field settlement were reduced remarkably. Generally, the results from the finite element analysis show larger than those from the measurement.

  • PDF

Simulation of Solitary Wave-Induced Dynamic Responses of Soil Foundation Around Vertical Revetment (고립파 작용하 직립호안 주변에서 지반의 동적응답에 관한 수치시뮬레이션)

  • Lee, Kwang-Ho;Yuk, Seung-Min;Kim, Do-Sam;Kim, Tae-Hyeong;Lee, Yoon-Doo
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.26 no.6
    • /
    • pp.367-380
    • /
    • 2014
  • Tsunami take away life, wash houses away and bring devastation to social infrastructures such as breakwaters, bridges and ports. The targeted coastal structure object in this study can be damaged mainly by the tsunami force together with foundation ground failure due to scouring and liquefaction. The increase of excess pore water pressure composed of oscillatory and residual components may reduce effective stress and, consequently, the seabed may liquefy. If liquefaction occurs in the seabed, the structure may sink, overturn, and eventually increase the failure potential. In this study, the solitary wave was generated using 2D-NIT(Two-Dimensional Numerical Irregular wave Tank) model, and the dynamic wave pressure acting on the seabed and the estimated surface boundary of the vertical revetment. Simulation results were used as an input data in a finite element computer program(FLIP) for elasto-plastic seabed response. The time and spatial variations in excess pore water pressure, effective stress, seabed deformation, structure displacement and liquefaction potential in the seabed were estimated. From the results of the analysis, the stability of the vertical revetment was evaluated.

Bore-induced Dynamic Responses of Revetment and Soil Foundation (단파작용에 따른 호안과 지반의 동적응답 해석)

  • Lee, Kwang-Ho;Yuk, Seung-Min;Kim, Do-Sam;Kim, Tae-Hyeong;Lee, Yoon-Doo
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.27 no.1
    • /
    • pp.63-77
    • /
    • 2015
  • Tsunami take away life, wash houses away and bring devastation to social infrastructures such as breakwaters, bridges and ports. The coastal structure targeted object in this study can be damaged mainly by the wave pressure together with foundation ground failure due to scouring and liquefaction. The increase of excess pore water pressure composed of oscillatory and residual components may reduce effective stress and, consequently, the seabed may liquefy. If liquefaction occurs in the seabed, the structure may sink, overturn, and eventually increase the failure potential. In this study, the bore was generated using the water level difference, its propagation and interaction with a vertical revetment analyzed by applying 2D-NIT(Two-Dimensional Numerical Irregular wave Tank) model, and the dynamic wave pressure acting on the seabed and the surface boundary of the vertical revetment estimated by this model. Simulation results were used as input data in a finite element computer program(FLIP) for elasto-plastic seabed response. The time and spatial variations in excess pore water pressure ratio, effective stress path, seabed deformation, structure displacement and liquefaction potential in the seabed were estimated. From the results of the analysis, the stability of the vertical revetment was evaluated.

In Vitro Micropropagation of Polygonatum odoratum cv. Gungangbeaksea (둥굴레 '건강백세'의 기내 대량번식)

  • Kim, Man Bae;Park, Chun Geun;Yi, Sookyi;Han, Bong Hee
    • Korean Journal of Plant Resources
    • /
    • v.27 no.5
    • /
    • pp.540-545
    • /
    • 2014
  • The Polygonatum odoratum cv. Gungangbeaksea, bred in Gyeongsangnam-Do Agricutural Research & Extension Service, was cultured in vitro for micropropagate rapidly through the culture of rhizome explants ($5{\times}5mm$). The $7{\times}7mm$ explants of adventitious multi-bud clusters (AMC), obtained through the culture of rhizome explants (MS + 3.0 mg/L BA) were cultured on MS media with BA and TDZ. The shoot multiplication was favorable on the MS medium containing 3.0 mg/L TDZ with 2.8 in shoot number. But the formation of AMC was low in all media tested. The explants of AMC were cultured on MS media containing 1.0~5.0 mg/L TDZ and NAA to multiplicate AMC more. The formation of AMC was a little more stimulated on combined MS media of TDZ and NAA, than that with TDZ alone. The multiplication of shoots and AMC was favorable on MS media with 3.0 mg/L TDZ and 5.0 mg/L NAA, and 5.0 mg/L TDZ and 3.0 mg/L NAA. As the concentration of MS salts increased, the formation of AMC was decreased. But the formation of AMC was more stimulated, as the concentration of sucrose increased to 7%. Therefore, the multiplication of shoots and AMC was suitable on media containing 3.0~5.0 mg/L TDZ and NAA, and 7% of sucrose. The explants of AMC were rooted on media with 3.0 mg/L IBA, or 2.0 mg/L NAA with more than 80% in rooting ratio. The plantlets were treated at $5^{\circ}C$ for 8 weeks, and cultured ex vitro for 8 weeks. The survival ratio of plantlets were 100% in vermiculite, and the mixed soil with perlite 1 volumn and vermiculite 1 volumn.

A Study on Bearing Capacity for Installed Rammed Aggregate Pier (RAP의 배치형태에 따른 지지력에 관한 연구)

  • Kim, Younghun;Cho, Changkoo;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.10 no.5
    • /
    • pp.19-26
    • /
    • 2009
  • Rammed Aggregate Pier (RAP) method is intermediate foundation between deep and shallow foundation, and it has been built in world wide. RAP represents a relatively new method that has grown steadily over 19 years since Geopier of USA developed this revolutionary method in 1989. The investigation and research in domestic is not accomplished. In this paper, the examined details of different spacing of piles, bearing capacities, respectively, conclude with recommendations on how RAP can be used in future needs. This documentation further provides comparisons of the laboratory test results which were obtained from changing the spacing of piles, namely installed rammed aggregate pier. Laboratory model test was administered in a sand box. Strain control test was conducted to determine the bearing capacities of the piers; 20 mm, 30 mm and 40 mm RAP in diameter using drilling equipment to make holes were installed in sand at initial relative densities of 40%. By comparing different spacing of piles, in this experiment, piles are spaced structually span, form a ring shape, narrowing the distance of each other, to the center. the result shows that as diameter of pier is bigger in diameter, bearing capacity also dramatically increased due to raised stiffness. Also, as the space between each piers was closed, the settlement rate of soil was decreased significantly. From the test results, as the space between each piles were getting closer, it allows greater chances to have more resistance to deformation, and shows more improved stability of structures. After from the verification work which is continuous leads the accumulation of the site measuring data which is various, and bearing capacity and the settlement is a plan where the research will be advanced for optimum installed RAP.

  • PDF

A Study on the Increase of Bearing Capacity of Soft Ground in Shallow Foundation Using High Density Rapid Expansion Material (고밀도 급속 팽창재를 이용한 얕은기초 연약지반의 지내력 증대에 관한 연구)

  • Ro, Euichul;Kim, Daehyeon
    • The Journal of Engineering Geology
    • /
    • v.30 no.2
    • /
    • pp.185-198
    • /
    • 2020
  • High-density rapid expansion material is a method that increases the solid volume of injection materials due to hydration and foam reactions at the same time as spraying. It is an effective method for securing ground stability, restoring subsidence, and loading during construction of structures. In this regard, through the mechanical experiments of injection materials, the stability of the foundation ground of the structure and the effect of increasing the endurance using site construction were analyzed. The results of the experiment showed that the unit weight of soil decreased by 10.5% after injection of the filling material, and the allowable support for the structure was deemed safe, and the subsidence by each section after ground improvement was determined to be safe at 2.28, 1.55 and 0.46 cm, respectively, with an acceptable subsidence of less than 5 cm. After the field test, five inclinometers were installed on the top floor of the target building to measure the displacement of the X and Y axes. As a result of the measurement, no displacement related to the phenomenon of inequality or subsidence cracks of the structure was measured for about 16 months (509 days) after construction. This can be judged to be a sufficient increase in the stability of the ground after the injection of rapid expansion.