• Title/Summary/Keyword: Fossil power plant

Search Result 216, Processing Time 0.027 seconds

The comparison of tidal power generation methods at Sukmodo (강화도 석모도 지역에서의 효율적인 조력발전방식 비교)

  • Lee, Tae-Hoon;Sim, Ju-Yeol;Cho, Yong-Sik
    • 한국방재학회:학술대회논문집
    • /
    • 2008.02a
    • /
    • pp.435-438
    • /
    • 2008
  • The huge economical damage and environmental pollution have been occurred for decades because of using of fossil fuel. So the development of alternative energy is urgent. In the west sea of Korea, a proper area for tidal power plant, development and investigation for economical efficient of tidal power plant are preceeding. The water turbine generator with the capacity of 25.4MW was used to compare single-basin flood tide generation with ebb tide generation while considering the water depth and tide in the vicinity of Sukmodo.

  • PDF

Modal Parameter Identification of a Generator Stator Frame for Fossil Power Plants (화력 발전용 발전기 고정자 프레임의 모드매개변수 규명)

  • 김철홍;류석주;박종포
    • Journal of KSNVE
    • /
    • v.9 no.3
    • /
    • pp.570-576
    • /
    • 1999
  • This paper presents numerical and experimental results of modal parameter identification in a generator stator frame for 500 MW fossil power plants. A commercial finite element analysis S/W was employed for modal analysis. The generator is excited by alternating electromagnetic forces, mainly of 120 Hz in 60 Hz machines, due to magnetic field and electric current in windings. It is necessary to verify that the stator frame has adequate frequency margin from the excitation frequency to avoid possible resonance when operating. Thus, frequency margin required for the stator frame is established using the numerical and experimental results. The results show that the stator frame meets the frequency-margin requirements. Also, results of modal analysis for design modification in order to reduce weights of the stator frame without deteriorating vibration characteristics are presented.

  • PDF

The Status of Power Plant Simulation Technology and KEPCO's Plan for Self-Reliance of the Technology (발전소 시뮬레이터 기술동향 및 국내 기술자립 계획)

  • Shin, Yeong-Cheol;Lee, Yong-Kwan
    • Proceedings of the KIEE Conference
    • /
    • 1993.07a
    • /
    • pp.525-528
    • /
    • 1993
  • KEPCO Research Center is carrying out a simulator(full scope replica type) development project for two nuclear power plants(Kori-2, Younggwang-3,4) and one fossil power plant(Poryong-3,4). In this project, we aim not only the installation of high performance simulators at the power plant sites but also the realization of self reliance of power plant simulation technology in Korea. In the course of preparing procurement specification for the 3 simulators, the present status of power plant simulation technology has been surveyed and is presented in this paper. The fidelity of simulation and the automation of simulation model production has been greatly improved due to the ever increasing computing power of today's workstations. The need and importance of the application of high fidelity simulators to the operator training is refocused since the accident at TMI Nuclear Power Plant, U.S.A.

  • PDF

Floating Photovoltaic Plant Location Analysis using GIS (GIS를 활용한 수상 태양광 발전소 입지 분석)

  • Lee, Ki Rim;Lee, Won Hee
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.24 no.1
    • /
    • pp.51-59
    • /
    • 2016
  • Global consumption of fossil fuels continues to increase. As developing countries use fossil fuel as much as the existing fossil fuel using countries, the total amount of fossil fuel consumed has risen. The finite fossil energy depletion insecurity have become serious. In addition, fossil energy is caused by environmental pollution, economic and social problems remain in assignments that need to be addressed. Although solar power is clean and has many benefits, there are several problems in the process of installing a solar power plant. To solve these problems, floating photovoltaic plants has emerged as an alternative. This floating photovoltaic plants location analysis has not been made yet. In this study, the conditions of the floating photovoltaic plants location is analyzed with the Analytic Hierarchy Process using the terrain and climate factors. The score is assigned to the attribute information of each factor by the classification table. After multiplied by the weight the result is analyzed by visualization of the score. As the result, the score of the northen part of Gyeongsangbuk-do province is higher than the southern part of Gyeongsangbuk-do province. Especially Andongho lake in Andong City and the reservoir in Yeongyang-Gun are extracted as the optimal location. The score of the river boundary is low not the center of the river stream. It is expected that this study would be a more accurate floating solar power plant location analysis.

Recent Trend to the Forging Technology of Power Plant Components and Status of Forging Company (발전용 소재 단조기술 및 국내 단조업계 동향)

  • Kim, J.T.;Chang, H.S.;Kim, D.K.;Kim, Y.D.;Kim, D.Y.
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 2007.05a
    • /
    • pp.38-41
    • /
    • 2007
  • The increase of $CO_2$ emission by increasing of fossil fuel usage has been understood a major cause of global warming. The supply of electric energy is heavily dependent on the massive thermal power and nuclear power plant before developing the renewable energy to supply the electric energy stably at a low price. The large and sound forged components of pressure vessel, turbine and generator are widely used in power plant such as wind power, hydroelectric power generation, nuclear power and thermal power plant. This paper is discussed the trend of manufacturing technology for pressure vessel and turbine to satisfy the required condition of utility company. It is also introduced a strategy of forging industry to cope with carbon tax.

  • PDF

A Study on the Selection of Maxium Plant Efficiency through the Performance Test in Snper-Critical Power Plant (초임계압형 화력발전소의 성능시험을 통한 최고효율점 선정에 관한 연구)

  • Kwon, Y.S.;Suh, J.S.
    • Proceedings of the KSME Conference
    • /
    • 2003.11a
    • /
    • pp.402-407
    • /
    • 2003
  • The main reason to select the maxium plant efficiency through the performance test in fossil power plant is to increase the efficiency of power plant as well as saving energy collated with the policy of government. This study is aimed at unerstanding the variantion trend of efficiency and analyzing the efficiency of boiler and turbine through each of the performance test. Ultimately, the maxium efficiency of power plant will be presented in super-critical pressure type power plant.

  • PDF

Identification of the Failure of VFD Heat Sink at Fossil Power Plant

  • Jung, Jine-sung;Lee, Han-sang;Kim, Min-tae;Kim, Eui-hyun
    • Corrosion Science and Technology
    • /
    • v.8 no.4
    • /
    • pp.153-156
    • /
    • 2009
  • The water cooling system for VFD (Variable Frequency Drive) of a fossil fuel power plant was reported to be shut down due to a water leak at the metal connection of the heat-sink to the hoses. In order to identify the cause of the failure, the system was visually inspected, and corrosion products were analyzed with SEM equipped with EDX. The failure was observed repeatedly at the nipples of certain location, suggesting galvanic corrosion. In a U-shaped heat sink with two nipples, for inlet and outlet, only one nipple was corrosively damaged at the tip, while the other was not. Most of the corrosion products were observed at the sound nipple and in the filter, identified as $Cu(OH)_2$. Some other corrosion products, composed of mostly $Cu_2O$, were found at the corrosively attacked nipple. A fair amount of Cl was also detected on the surface of the damaged nipple. It was concluded that galvanic corrosion was occurred due to a current leakage over the whole system, and the damage was accelerated by the accumulated chlorine ions in the cooling water.

Vibration Analysis of the End-winding of Large Generator for Fossil Power Plant under Electromagnetic Excitation (대형 화력 발전용 발전기 권선단부의 전자기력에 의한 진동 해석)

  • 김철홍;주영호
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2003.11a
    • /
    • pp.350-355
    • /
    • 2003
  • This paper presents results of vibration analysis of a end-winding of large generator for fossil power plant. A finite element analysis using a commercial S/W is performed to calculate alternating electromagnetic forces, mainly of 120㎐ in 60㎐ machines, acting on the end-winding, and then to calculate forced response of the end-winding under electromagnetic forces. Also, this paper presents analytical and experimental modal analysis results of generator end-winding to validate FE model. We calculated forced response of end-winding on 120㎐, double rotating frequency. These results will be used to evaluate structural reliability of end-winding and applied to update model.

  • PDF

Analysis of Vibration and Electromagnetic Forces on a Generator End-winding for 500 MW Fossil Power Plant (500MW 급 대형 발전기 권선단부의 전자기력과 동특성 해석)

  • 김철홍;주영호
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2001.11b
    • /
    • pp.826-831
    • /
    • 2001
  • Electromagnetic forces generate vibrations in the end-winding of large generators. A finite element analysis using a commercial S/W is performed to calculate electromagnetic force of end-winding in two pole generator for 500 MW fossil power plant. Also, this paper presents analytical and experimental modal analysis results of generator end- winding. Using validated FE model, 3D electromagnetic model which computes the forces on the end-winding is coupled with a 3D mechanical model which calculates the dynamic displacement and stress under electromagnetic forces. These results will be used to evaluate reliability of end-winding and applied to update model.

  • PDF