• 제목/요약/키워드: Form Work Crew

검색결과 11건 처리시간 0.023초

특수 플랜트 철근콘크리트 공종의 작업조 생산성 및 영향요인 분석 (Analysis of the Crew Productivity and Influence Factor for Special-Plant Reinforce Concrete)

  • 허영기;임진호;안영철;오재훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.42-43
    • /
    • 2014
  • Few studies on crew productivity has been conducted, although the data is significant for time and cost estimation. Crew productivity data was collected for over 9 months from a nuclear power plant and analysed in order to identify factors driving the productivity. It was revealed that the crew productivity of form work, rebar work and concrete pouring work was 45.64(㎡/crew·day), 2.93(t/crew·day), 110.25(㎡/crew·day) on average respectively. Moreover, 'nightwork', 'No. of workers per crew' and 'total work amount' were identified as drivers.

  • PDF

공동주택 거푸집공사의 작업요소별 생산성 분석 (Productivity Assessment of Form Works According to Work Elements)

  • 하기주;최민권;이동렬;하영주;하민수;김진환
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.161-163
    • /
    • 2010
  • In this study, it was accomplished the analysis of apartment house shape and the work factor productivity of the form work for the application of rational construction cost in apartment house. The form work is highly depended on the manpower in frame construction, and it has been a high impact during estimating of frame work cost.

  • PDF

공동주택 SYSTEM FORM 공사의 생산성 분석 및 향상방안 제안 (Productivity Analysis and Improvement of the System Form Construction in the Apartment Housing Project)

  • 김도형;김경래
    • 한국건설관리학회논문집
    • /
    • 제2권3호
    • /
    • pp.101-109
    • /
    • 2001
  • 벽식 구조 공동주택(고층아파트)은 수평, 수직구조체가 동일하게 연속되므로 시스템거푸집 시공이 효율적이다. 그런데 현재 많은 고층 건축물 시공현장에서 사용되고 있는 시스템 거푸집은 전용횟수의 증대와 콘크리트 품질향상의 장점을 가지고 있지만, 공장 제작되어 현장 반입된 후 2차 조립 과정중의 공기지연 및 시공초기의 인력과다투입 등으로 초기 계획공정달성에 많은 애로점을 가지고 있다. 이러한 측면에서, 각각의 노무자들이 실제 생산적인 작업에 소비하는 시간 비율과 공사지연의 정도 및 원인 등을 평가대상으로 생산성 저하의 원인을 찾아내어 개선방안을 찾아보고자 한다. 본 연구는 시스템거푸집 공정을 수행하고 있는 아파트 신축현장을 선택하여, 다양한 생산성 분석방법 중의 하나인 워크샘플링(Work Sampling)를 통하여 생산성을 분석한 후, 크루발런스스터디(Crew Balance Study)를 통하여 생산성 향상방안을 현장조립공정과 내부 폼(form)작업, 외부 폼(form)작업으로 구분하여 제시하였다.

  • PDF

하천공사 대표공종의 작업조 구성 및 생산성 정보 개발 (A Study on the Development of Work-Crew Based Daily-Productivity for Representative B.O.Q Item in River Conservation Project)

  • 유덕열;박형근;임형민
    • 대한토목학회논문집
    • /
    • 제33권6호
    • /
    • pp.2519-2528
    • /
    • 2013
  • 표준품셈은 공공기관 및 민간기관의 공사비를 책정하는 기본적인 자료로 이용되고 있다. 본 논문은 하천공사에서 선정된 대표공종을 대상으로 새로운 형식의 표준품셈 및 장비의 작업량 산출방식을 제안하고자 한다. 품셈에서 작업조 구성의 정보 및 1일 생산성 정보의 제공이 가능하도록 함으로써 공정계획 단계에서 품셈의 적용성을 향상시키고 장비의 작업량 산출과정을 간소화하여 사용자의 편의성을 증대할 수 있기를 기대한다. 하천공사의 경우 작업조건이라는 변수가 매우 크게 작용하기 때문에 생산성 정보 및 기계의 작업량을 일반화 하는 것은 많은 어려움이 존재하지만 지속적인 생산성 정보와 기계의 작업량 정보를 개선하여 정확도를 향상할 수 있다면 품셈을 통한 공정계획 수립 및 적산과정의 간소화가 가능할 것이다.

Proposed Data-Driven Approach for Occupational Risk Management of Aircrew Fatigue

  • Seah, Benjamin Zhi Qiang;Gan, Wee Hoe;Wong, Sheau Hwa;Lim, Mei Ann;Goh, Poh Hui;Singh, Jarnail;Koh, David Soo Quee
    • Safety and Health at Work
    • /
    • 제12권4호
    • /
    • pp.462-470
    • /
    • 2021
  • Background: Fatigue is pervasive, under-reported, and potentially deadly where flight operations are concerned. The aviation industry appears to lack a standardized, practical, and easily replicable protocol for fatigue risk assessment which can be consistently applied across operators. Aim: Our paper sought to present a framework, supported by real-world data with subjective and objective parameters, to monitor aircrew fatigue and performance, and to determine the safe crew configuration for commercial airline operations. Methods: Our protocol identified risk factors for fatigue-induced performance degradation as triggers for fatigue risk and performance assessment. Using both subjective and objective measurements of sleep, fatigue, and performance in the form of instruments such as the Karolinska Sleepiness Scale, Samn-Perelli Crew Status Check, Psychomotor Vigilance Task, sleep logs, and a wearable actigraph for sleep log correlation and sleep duration and quality charting, a workflow flagging fatigue-prone flight operations for risk mitigation was developed and trialed. Results: In an operational study aimed at occupational assessment of fatigue and performance in airline pilots on a three-men crew versus a four-men crew for a long-haul flight, we affirmed the technical feasibility of our proposed framework and approach, the validity of the battery of assessment instruments, and the meaningful interpretation of fatigue and work performance indicators to enable the formulation of safe work recommendations. Conclusion: A standardized occupational assessment protocol like ours is useful to achieve consistency and objectivity in the occupational assessment of fatigue and work performance.

거푸집 공사의 생산성 분석을 통한 작업조 기반의 Cost Data Prototype 개발에 관한 연구 (Development of Cost Data Prototype based on Production Crew by Productivity Analysis of Form Work)

  • 강동완;지성민;현창택
    • 한국건설관리학회논문집
    • /
    • 제13권1호
    • /
    • pp.44-52
    • /
    • 2012
  • 합리적인 방법에 의해 결정된 건설 공사비를 포함하여 계약을 체결하는 것은 공공 건설공사의 사업비 관리 측면에서 매우 중요하다. 국내에서는 건설 공사비를 산정하는 기준으로 표준품셈이 사용되고 있지만, 표준품셈에서 제시하는 품의 적정성에 대해서 문제가 제기되고 있으며, 현장의 자원 투입량과 품셈에서 제시하는 자원 투입량의 차이로 합리적이고 효율적인 공사비를 산정하는데 어려움이 있다. 본 연구에서는 건설 공사비를 합리적으로 산정하기 위하여, 공동주택 거푸집 공사의 생산성 분석을 통한 작업조 기반의 Cost Data Prototype을 제시하였다. 특히, CYCLONE 모델은 민감도 분석을 통해 최적의 작업인원을 제시하는 모델이므로, 거푸집 공사의 다양한 작업공간과 작업인원을 대상으로 생산성을 분석할 수 있는 도구로 활용이 가능하다. 그리고 개발된 회귀식은 거푸집 공사의 작업인원을 독립변수로 하여, 필요한 작업량을 종속변수로 예측하는데 활용이 가능할 것이다.

객실승무원의 안전지각과 안전행동 향상을 위한 연구: 항공사 안전 분위기를 중심으로 (A Study on the Improvement of Safety Perception and Safety Action of Cabin Crews: Focusing on the Airlines Safety Climate)

  • 박희정
    • 한국안전학회지
    • /
    • 제34권6호
    • /
    • pp.76-87
    • /
    • 2019
  • This study was conducted to check the cabin crew's safety perception in relation to the airline's safety climate and cabin crew's safety action and to verify that the safety perception's mediation effects. The results of the study confirmed that all three factors of the safety climate have a significant impact on safety perception, and among them, safety practice is the most significant. Accordingly, Airlines need to establish a community that enables real-time information exchange for air accidents so that the cabin crew can present real-time examples of safety-related accidents. In addition, it will be necessary to work with external safety agencies to form an active attitude for the establishment of safety procedures in order to prevent recurrence of safety problems while considering the causes of such incidents internally in the event of an airline safety accident. In addition, it was confirmed that safety training was the most significant factor to safety action, among which all three elements of the safety climate had a significant effect on safety action. Therefore, airlines need to expand practical training on aircraft to full-scale safety training to build an immediate resolution for cabin crews in the event of an air accident. In addition, safety training should be established to encourage collaboration among aviation safety-related personnel to participate in safety training together to address aviation safety from a diverse point of view. Safety perception was has a significant effect on safe action. Therefore, airlines should reinforce the airline's safety management system by checking the status of the cabin crew's safety perception extending the level of punishment to the scope of retirement or disqualification to establish a firm awareness of safety. Finally, the safety perception has demonstrated partial mediation effects in relation to the safety climate and safety action. Therefore, the airline needs to improve the duties of the cabin crew that interferes with cabin safety duties. In addition, airlines should utilize advertisements emphasizing that safety is first.

Reinforced-Concrete Works Productivity Analysis on Nuclear-Power-Plant Project

  • Lim, Jin-Ho;Huh, Young-Ki;Oh, Jae-Hun;Seo, Hyeon-Taek
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.600-601
    • /
    • 2015
  • Both the importance and process of estimating Nuclear-power plant construction time and cost have increased in significance as energy user costs themselves have become more significant. In estimating construction time, few parameters are more significant than work item production rates and factors significantly affecting the rates. A standardized data collection tool was used to acquire a total of 401 data points from a S Nuclear-power plant project, for selected critical works: form-work, rebar-work, and concrete-pouring. With the data, several hypothesized drivers of the man-hour production rates and crew-day production rates were also analyzed. Findings from this study will enable industry professionals to enhance accuracy of time and cost estimation for nuclear power plant construction.

  • PDF

해상공사에 투입된 부선의 안전관리 책임에 대한 연구 (A Study on the Responsibility for a Barge's Safety Management in a Marine Construction)

  • 장영준
    • 한국항해항만학회지
    • /
    • 제39권1호
    • /
    • pp.37-43
    • /
    • 2015
  • 해상공사 현장에서 용선한 부선 안전관리의 책임 소재와 관련한 논란과 법적 문제가 빈번히 발생하고 있다. 일반적으로 해상공사에 투입된 부선의 용선계약은 소위 '선원부 선체용선계약'의 형식으로 계약이 이루어진다. 우리 상법 제5편 해상편에서는 정기용선계약이나 선체용선계약을 규정하고 있지만 여기에 명시된 내용으로는 해상공사에 투입된 부선의 안전에 대한 책임소재가 불분명하다. 또한 이로 인하여 실제로 사고 발생 시 그 책임소재에 관한 논쟁이 발생하고 있으며 실무에서도 그 책임소재가 불분명하여 서로 책임을 전가하는 현상이 나타나고 있고 그로 인한 유사 사고의 위험성이 높은 상황이다. 그러나 부선의 관리를 맡고 있는 선두는 법적으로 자격요건이 정해진 바가 없으며 평소의 업무 내용을 고려해 볼 때 선두에게 해기사로서의 전문적인 판단을 요구하는 업무를 요구할 수 없다. 또한 해상공사 현장에 투입된 부선은 장비임대차계약 또는 선체용선의 형태로 건설공사에 투입되었으므로 용선자의 공사현장 안전관리 조직의 관리대상이므로 용선자가 부선을 안전하게 관리하여야 하는 주의의무가 있다. 따라서 선체용선한 부선의 사용 중 손해가 발생한 경우에는 기본적으로는 선체용선자의 책임이 된다.

119 구급대원들이 지각하는 의료지도의 필요성 인식과 요구도 (Recognition and Request for Medical Direction by 119 Emergency Medical Technicians)

  • 박주호
    • 한국응급구조학회지
    • /
    • 제15권3호
    • /
    • pp.31-44
    • /
    • 2011
  • Purpose : The purpose of emergency medical services(EMS) is to save human lives and assure the completeness of the body in emergency situations. Those who have been qualified on medical practice to perform such treatment as there is the risk of human life and possibility of major physical and mental injuries that could result from the urgency of time and invasiveness inflicted upon the body. In the emergency medical activities, 119 emergency medical technicians mainly perform the task but they are not able to perform such task independently and they are mandatory to receive medical direction. The purpose of this study is to examine the recognition and request for medical direction by 119 emergency medical technicians in order to provide basic information on the development of medical direction program suitable to the characteristics of EMS as well as for the studies on EMS for the sake of efficient operation of pre-hospital EMS. Method : Questionnaire via e-mail was conducted during July 1-31, 2010 for 675 participants who are emergency medical technicians, nurses and other emergency crews in Gyeongbuk. The effective 171 responses were used for the final analysis. In regards to the emergency medical technicians' scope of responsibilities defined in Attached Form 14, Enforcement regulations of EMS, t-test analysis was conducted by using the means and standard deviation of the level of request for medical direction on the scope of responsibilities of Level 1 & Level 2 emergency medical technicians as the scale of medical direction request. The general characteristics, experience result, the reason for necessity, emergency medical technicians & medical director request level, medical direction method, the place of work of the medical director, feedback content and improvement plan request level were analyzed through frequency and percentage. The level of experience in medical direction and necessity were analyzed through ${\chi}^2$ test. Results : In regards to the medical direction experience per qualification, the experience was the highest with 53.3% for Level 1 emergency medical technicians and 80.3% responded that experience was helpful. As for the recognition on the necessity of medical direction, 71.3% responded as "necessary" and it turned out to be the highest of 76.9% in nurses. As for the reason for responding "necessary", the reason for reducing the risk and side-effects from EMS for patients was the largest(75.4%), and the reason of EMS delay due to the request of medical direction was the highest(71.4%) for the reason for responding "not necessary". In regards to the request level of the task scope of emergency medical technicians, injection of certain amount of solution during a state of shock was the highest($3.10{\pm}.96$) for Level 1 emergency rescuers, and the endotracheal intubation was the highest($3.12{\pm}1.03$) for nurses, and the sublingual administration of nitroglycerine(NTG) during chest pain was the highest($2.62{\pm}1.02$) for Level 2 emergency medical technicians, and regulation of heartbeat using AED was the highest($2.76{\pm}.99$) for other emergency crews. For the revitalization of medical direction, the improvement in the capability of EMS(78.9%) was requested from emergency crew, and the ability to evaluate the medical state of patient was the highest(80.1%) in the level of request for medical director. The prehospital and direct medical direction was the highest(60.8%) for medical direction method, and the emergency medical facility was the highest(52.0%) for the placement of medical director, and the evaluation of appropriateness of EMS was the highest(66.1%) for the feedback content, and the reinforcement of emergency crew(emergency medical technicians) personnel was the highest(69.0%) for the improvement plan. Conclusion : The medical direction is an important policy in the prehospital EMS activity because 119 emergency medical technicians agreed the necessity of medical direction and over 80% of those who experienced medical direction said it was helpful. In addition, the simulation training program using algorithm and case study through feedback are necessary in order to enhance the technical capability of ambulance teams on the item of professional EMS with high level of request in the task scope of emergency medical technicians, and recognition of medical direction is the essence of the EMS field. In regards to revitalizing medical direction, the improvement of the task performance capability of 119 emergency medical technicians and medical directors, reinforcement of emergency medical activity personnel, assurance of trust between emergency medical technicians and the emergency physician, and search for professional operation plan of medical direction center are needed to expand the direct medical direction method for possible treatment beforehand through the participation by medical director even at the step in which emergency situation report is received.