• Title/Summary/Keyword: Form Work Crew

Search Result 11, Processing Time 0.029 seconds

Analysis of the Crew Productivity and Influence Factor for Special-Plant Reinforce Concrete (특수 플랜트 철근콘크리트 공종의 작업조 생산성 및 영향요인 분석)

  • Huh, Young-Ki;Lim, Jin-HO;Ahn, Young-Chull;Oh, Jae-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.42-43
    • /
    • 2014
  • Few studies on crew productivity has been conducted, although the data is significant for time and cost estimation. Crew productivity data was collected for over 9 months from a nuclear power plant and analysed in order to identify factors driving the productivity. It was revealed that the crew productivity of form work, rebar work and concrete pouring work was 45.64(㎡/crew·day), 2.93(t/crew·day), 110.25(㎡/crew·day) on average respectively. Moreover, 'nightwork', 'No. of workers per crew' and 'total work amount' were identified as drivers.

  • PDF

Productivity Assessment of Form Works According to Work Elements (공동주택 거푸집공사의 작업요소별 생산성 분석)

  • Ha, Gee-Joo;Choi, Min-Kwon;Yi, Dong-Ryul;Ha, Young-Joo;Ha, Min-Su;Kim, Jin-Hwan
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.161-163
    • /
    • 2010
  • In this study, it was accomplished the analysis of apartment house shape and the work factor productivity of the form work for the application of rational construction cost in apartment house. The form work is highly depended on the manpower in frame construction, and it has been a high impact during estimating of frame work cost.

  • PDF

Productivity Analysis and Improvement of the System Form Construction in the Apartment Housing Project (공동주택 SYSTEM FORM 공사의 생산성 분석 및 향상방안 제안)

  • Kim Do-Hyeong;Kim Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.3 s.7
    • /
    • pp.101-109
    • /
    • 2001
  • Application of system form is very effective to continuous horizontal or vertical walls of the apartment housing. Though the system forms that are used in the construction field have the advantage of concrete quality improvement and increasing number of usages, there are some problems in reaching early planning scheduling goal due to schedule delay and low productivity. This study is initiated to solve the problem and suggest some improvements searching for reasons that diminish the productivity. A case study was done in apartment construction field where system form was used and the productivity is analyzed by work sampling. Finally, productivity improvements for assembly of the form, internal form and external form are suggested, respectively.

  • PDF

A Study on the Development of Work-Crew Based Daily-Productivity for Representative B.O.Q Item in River Conservation Project (하천공사 대표공종의 작업조 구성 및 생산성 정보 개발)

  • Yoo, Duk-Yul;Park, Hyung-Keun;Lim, Hyeong-Min
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.6
    • /
    • pp.2519-2528
    • /
    • 2013
  • The standard of estimate is being used as basic material for appropriating construction expenses of public institutions and private institutions. The present thesis aims to propose a new form of a standard of estimate and a calculation method of work amount of equipment by targeting a representative construction type selected at river reservation work. The present thesis expects that the convenience of users can be expanded by improving applicability of a standard of estimate and simplifying a calculation process of work amount of equipment in a process planning stage so that the provision of work crew lineup information and daily productivity information is possible by a standard of estimate. In case of river conservation work, because the variables called work conditions act very largely, there exists much difficulty for generalizing productivity information and work amount of equipment, but if its accuracy could be enhanced by improving continuous productivity information and work amount information of equipment, the simplification of process planning establishment and cumulative process through a standard of estimate would be possible.

Proposed Data-Driven Approach for Occupational Risk Management of Aircrew Fatigue

  • Seah, Benjamin Zhi Qiang;Gan, Wee Hoe;Wong, Sheau Hwa;Lim, Mei Ann;Goh, Poh Hui;Singh, Jarnail;Koh, David Soo Quee
    • Safety and Health at Work
    • /
    • v.12 no.4
    • /
    • pp.462-470
    • /
    • 2021
  • Background: Fatigue is pervasive, under-reported, and potentially deadly where flight operations are concerned. The aviation industry appears to lack a standardized, practical, and easily replicable protocol for fatigue risk assessment which can be consistently applied across operators. Aim: Our paper sought to present a framework, supported by real-world data with subjective and objective parameters, to monitor aircrew fatigue and performance, and to determine the safe crew configuration for commercial airline operations. Methods: Our protocol identified risk factors for fatigue-induced performance degradation as triggers for fatigue risk and performance assessment. Using both subjective and objective measurements of sleep, fatigue, and performance in the form of instruments such as the Karolinska Sleepiness Scale, Samn-Perelli Crew Status Check, Psychomotor Vigilance Task, sleep logs, and a wearable actigraph for sleep log correlation and sleep duration and quality charting, a workflow flagging fatigue-prone flight operations for risk mitigation was developed and trialed. Results: In an operational study aimed at occupational assessment of fatigue and performance in airline pilots on a three-men crew versus a four-men crew for a long-haul flight, we affirmed the technical feasibility of our proposed framework and approach, the validity of the battery of assessment instruments, and the meaningful interpretation of fatigue and work performance indicators to enable the formulation of safe work recommendations. Conclusion: A standardized occupational assessment protocol like ours is useful to achieve consistency and objectivity in the occupational assessment of fatigue and work performance.

Development of Cost Data Prototype based on Production Crew by Productivity Analysis of Form Work (거푸집 공사의 생산성 분석을 통한 작업조 기반의 Cost Data Prototype 개발에 관한 연구)

  • Kang, Dong-Wan;Ji, Soung-Min;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.44-52
    • /
    • 2012
  • In the cost management of public construction projects, it is an important issue to develop an adequate cost data for estimating the predetermined amount by various methods. For a long time, a standard of estimation in korea is used as a basis for estimating the predetermined amount of public construction. However, they did not have a reasonable cost data based on a labor and equipment productivity analysis. For this reason, it is difficult to make a reasonable and efficient estimation of the costs, and this situation presents an urgent need for more accurate cost data to use in an early phase. This study analyzed the productivity of form work by the CYCLONE model, and presented the model on the number of optimal labor through sensitivity analysis. This CYCLONE model can be useful in analyzing productivity on the various sizes of form. Also, the regression model to estimate the daily output can be used in predicting the amount of labor. Considering the work duration in the regression model is expected to make the daily output estimation much more accurate.

A Study on the Improvement of Safety Perception and Safety Action of Cabin Crews: Focusing on the Airlines Safety Climate (객실승무원의 안전지각과 안전행동 향상을 위한 연구: 항공사 안전 분위기를 중심으로)

  • Park, Hee Jung
    • Journal of the Korean Society of Safety
    • /
    • v.34 no.6
    • /
    • pp.76-87
    • /
    • 2019
  • This study was conducted to check the cabin crew's safety perception in relation to the airline's safety climate and cabin crew's safety action and to verify that the safety perception's mediation effects. The results of the study confirmed that all three factors of the safety climate have a significant impact on safety perception, and among them, safety practice is the most significant. Accordingly, Airlines need to establish a community that enables real-time information exchange for air accidents so that the cabin crew can present real-time examples of safety-related accidents. In addition, it will be necessary to work with external safety agencies to form an active attitude for the establishment of safety procedures in order to prevent recurrence of safety problems while considering the causes of such incidents internally in the event of an airline safety accident. In addition, it was confirmed that safety training was the most significant factor to safety action, among which all three elements of the safety climate had a significant effect on safety action. Therefore, airlines need to expand practical training on aircraft to full-scale safety training to build an immediate resolution for cabin crews in the event of an air accident. In addition, safety training should be established to encourage collaboration among aviation safety-related personnel to participate in safety training together to address aviation safety from a diverse point of view. Safety perception was has a significant effect on safe action. Therefore, airlines should reinforce the airline's safety management system by checking the status of the cabin crew's safety perception extending the level of punishment to the scope of retirement or disqualification to establish a firm awareness of safety. Finally, the safety perception has demonstrated partial mediation effects in relation to the safety climate and safety action. Therefore, the airline needs to improve the duties of the cabin crew that interferes with cabin safety duties. In addition, airlines should utilize advertisements emphasizing that safety is first.

Reinforced-Concrete Works Productivity Analysis on Nuclear-Power-Plant Project

  • Lim, Jin-Ho;Huh, Young-Ki;Oh, Jae-Hun;Seo, Hyeon-Taek
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.600-601
    • /
    • 2015
  • Both the importance and process of estimating Nuclear-power plant construction time and cost have increased in significance as energy user costs themselves have become more significant. In estimating construction time, few parameters are more significant than work item production rates and factors significantly affecting the rates. A standardized data collection tool was used to acquire a total of 401 data points from a S Nuclear-power plant project, for selected critical works: form-work, rebar-work, and concrete-pouring. With the data, several hypothesized drivers of the man-hour production rates and crew-day production rates were also analyzed. Findings from this study will enable industry professionals to enhance accuracy of time and cost estimation for nuclear power plant construction.

  • PDF

A Study on the Responsibility for a Barge's Safety Management in a Marine Construction (해상공사에 투입된 부선의 안전관리 책임에 대한 연구)

  • Jang, Yeong-Jun
    • Journal of Navigation and Port Research
    • /
    • v.39 no.1
    • /
    • pp.37-43
    • /
    • 2015
  • At marine construction sites, there are problems with regard to dispute on the responsibility of safety management of chartered barge and its legal issues. In general, demise charter with crew is used for barge charterparty which is committed to the marine construction. Although Chapter 5 of the Korean Commercial Act enact provisions regulating a Time Chargerparty and a Bareboat Charterparty, it is difficult to clarify where the responsibility lies with regard to the safety control of the chartered barge. For this reason, disputes on accountability arise when accident occurs in effect. As a result, parties of the charterparty shift the responsibility on each other and there is increased risk for occurrence of similar accidents. There is no legally required qualification for a head of barge workers who is in charge of barge management. It is not possible to demand the head of barge workers to take charge of tasks which requires professional judgment as a marine technician considering his daily work scope. Furthermore, the barge committed to the marine construction as a form of bareboat charter or equipment charterage is an object which should be managed by safety supervisor of the charterer's marine construction. The charterer bears a duty to manage the safety of the barge. Therefore, the charterer is generally liable for the damage incurred in the course of using the chartered barge.

Recognition and Request for Medical Direction by 119 Emergency Medical Technicians (119 구급대원들이 지각하는 의료지도의 필요성 인식과 요구도)

  • Park, Joo-Ho
    • The Korean Journal of Emergency Medical Services
    • /
    • v.15 no.3
    • /
    • pp.31-44
    • /
    • 2011
  • Purpose : The purpose of emergency medical services(EMS) is to save human lives and assure the completeness of the body in emergency situations. Those who have been qualified on medical practice to perform such treatment as there is the risk of human life and possibility of major physical and mental injuries that could result from the urgency of time and invasiveness inflicted upon the body. In the emergency medical activities, 119 emergency medical technicians mainly perform the task but they are not able to perform such task independently and they are mandatory to receive medical direction. The purpose of this study is to examine the recognition and request for medical direction by 119 emergency medical technicians in order to provide basic information on the development of medical direction program suitable to the characteristics of EMS as well as for the studies on EMS for the sake of efficient operation of pre-hospital EMS. Method : Questionnaire via e-mail was conducted during July 1-31, 2010 for 675 participants who are emergency medical technicians, nurses and other emergency crews in Gyeongbuk. The effective 171 responses were used for the final analysis. In regards to the emergency medical technicians' scope of responsibilities defined in Attached Form 14, Enforcement regulations of EMS, t-test analysis was conducted by using the means and standard deviation of the level of request for medical direction on the scope of responsibilities of Level 1 & Level 2 emergency medical technicians as the scale of medical direction request. The general characteristics, experience result, the reason for necessity, emergency medical technicians & medical director request level, medical direction method, the place of work of the medical director, feedback content and improvement plan request level were analyzed through frequency and percentage. The level of experience in medical direction and necessity were analyzed through ${\chi}^2$ test. Results : In regards to the medical direction experience per qualification, the experience was the highest with 53.3% for Level 1 emergency medical technicians and 80.3% responded that experience was helpful. As for the recognition on the necessity of medical direction, 71.3% responded as "necessary" and it turned out to be the highest of 76.9% in nurses. As for the reason for responding "necessary", the reason for reducing the risk and side-effects from EMS for patients was the largest(75.4%), and the reason of EMS delay due to the request of medical direction was the highest(71.4%) for the reason for responding "not necessary". In regards to the request level of the task scope of emergency medical technicians, injection of certain amount of solution during a state of shock was the highest($3.10{\pm}.96$) for Level 1 emergency rescuers, and the endotracheal intubation was the highest($3.12{\pm}1.03$) for nurses, and the sublingual administration of nitroglycerine(NTG) during chest pain was the highest($2.62{\pm}1.02$) for Level 2 emergency medical technicians, and regulation of heartbeat using AED was the highest($2.76{\pm}.99$) for other emergency crews. For the revitalization of medical direction, the improvement in the capability of EMS(78.9%) was requested from emergency crew, and the ability to evaluate the medical state of patient was the highest(80.1%) in the level of request for medical director. The prehospital and direct medical direction was the highest(60.8%) for medical direction method, and the emergency medical facility was the highest(52.0%) for the placement of medical director, and the evaluation of appropriateness of EMS was the highest(66.1%) for the feedback content, and the reinforcement of emergency crew(emergency medical technicians) personnel was the highest(69.0%) for the improvement plan. Conclusion : The medical direction is an important policy in the prehospital EMS activity because 119 emergency medical technicians agreed the necessity of medical direction and over 80% of those who experienced medical direction said it was helpful. In addition, the simulation training program using algorithm and case study through feedback are necessary in order to enhance the technical capability of ambulance teams on the item of professional EMS with high level of request in the task scope of emergency medical technicians, and recognition of medical direction is the essence of the EMS field. In regards to revitalizing medical direction, the improvement of the task performance capability of 119 emergency medical technicians and medical directors, reinforcement of emergency medical activity personnel, assurance of trust between emergency medical technicians and the emergency physician, and search for professional operation plan of medical direction center are needed to expand the direct medical direction method for possible treatment beforehand through the participation by medical director even at the step in which emergency situation report is received.