• Title/Summary/Keyword: Flow Verification

Search Result 688, Processing Time 0.023 seconds

Development of Sequential Mixing Model for Analysis of Shear Flow Dispersion (전단류 분산 해석을 위한 순차혼합모형의 개발)

  • Seo, Il Won;Son, Eun Woo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.4B
    • /
    • pp.335-344
    • /
    • 2006
  • In this study, sequential mixing model (SMM) was proposed based on the Taylor's theory which can be summarized as the fact that longitudinal advection and transverse diffusion occur independently and then the balance between the longitudinal shear and transverse mixing maintains. The numerical simulation of the model were performed for cases of different mixing time and transverse velocity distribution, and the results were compared with the solutions of 1-D longitudinal dispersion model (1-D LDM) and 2-D advection-dispersion model (2-D ADM). As a result it was confirmed that SMM embodies the Taylor's theory well. By the comparison between SMM and 2-D ADM, the relationship between the mixing time and the transverse diffusion coefficient was evaluated, and thus SMM can integrate 2-D ADM model as well as 1-D LDM model and be an explanatory model which can represents the shear flow dispersion in a visible way. In this study, the predicting equation of the longitudinal dispersion coefficient was developed by fitting the simulation results of SMM to the solution of 1-D LDM. The verification of the proposed equation was performed by the application to the 38 sets of field data. The proposed equation can predict the longitudinal dispersion coefficient within reliable accuracy, especially for the river with small width-to-depth ratio.

Numerical Simulation of Salinity Intrusion into Groundwater Near Estuary Barrage with Using OpenGeoSys (OpenGeoSys를 이용한 하굿둑 인근 지하수 내 염분 침투 수치모의)

  • Hyun Jung Lee;Seung Oh Lee;Seung Jin Maeng
    • Journal of Korean Society of Disaster and Security
    • /
    • v.16 no.4
    • /
    • pp.157-164
    • /
    • 2023
  • The estuary dam is a structure installed and operated in a closed state except when flood event occurs to prevent inland saltwater intrusion and secure freshwater supply. However, the closed state of dam leads to issues such as eutrophication, so it is necessary to examine the extent of saltwater intrusion resulting from the opening of sluice gates. Groundwater, due to its subsurface conditions and slow flow characteristics, is widely analyzed using numerical models. OpenGeoSys, an open-source software capable of simulating Thermal- Hydraulic- Mechanical- Chemical phenomena, was adopted for this study. Simulations were conducted assuming natural flow conditions without dam and operating considering busy farming season, mostly from March to September. Verification of the model through analytical solutions showed error of 3.7%, confirming that OpenGeoSys is capable of simulating saltwater intrusion for these cases. From results simulated for 10 years, considering for the busy farming season, resulted in about 46% reduction in saltwater intrusion length compared to natural flow conditions, approximately 74.36 m. It may be helpful to make choices to use groundwater as a water resource.

Numerical Modelling for the Dilation Flow of Gas in a Bentonite Buffer Material: DECOVALEX-2019 Task A (벤토나이트 완충재에서의 기체 팽창 흐름 수치 모델링: DECOVALEX-2019 Task A)

  • Lee, Jaewon;Lee, Changsoo;Kim, Geon Young
    • Tunnel and Underground Space
    • /
    • v.30 no.4
    • /
    • pp.382-393
    • /
    • 2020
  • The engineered barrier system of high-level radioactive waste disposal must maintain its performance in the long term, because it must play a role in slowing the rate of leakage to the surrounding rock mass even if a radionuclide leak occurs from the canister. In particular, it is very important to clarify gas dilation flow phenomenon clearly, that occurs only in a medium containing a large amount of clay material such as a bentonite buffer, which can affect the long-term performance of the bentonite buffer. Accordingly, DECOVALEX-2019 Task A was conducted to identify the hydraulic-mechanical mechanism for the dilation flow, and to develop and verify a new numerical analysis technique for quantitative evaluation of gas migration phenomena. In this study, based on the conventional two-phase flow and mechanical behavior with effective stresses in the porous medium, the hydraulic-mechanical model was developed considering the concept of damage to simulate the formation of micro-cracks and expansion of the medium and the corresponding change in the hydraulic properties. Model verification and validation were conducted through comparison with the results of 1D and 3D gas injection tests. As a result of the numerical analysis, it was possible to model the sudden increase in pore water pressure, stress, gas inflow and outflow rate due to the dilation flow induced by gas pressure, however, the influence of the hydraulic-mechanical interaction was underestimated. Nevertheless, this study can provide a preliminary model for the dilation flow and a basis for developing an advanced model. It is believed that it can be used not only for analyzing data from laboratory and field tests, but also for long-term performance evaluation of the high-level radioactive waste disposal system.

Data collection strategy for building rainfall-runoff LSTM model predicting daily runoff (강수-일유출량 추정 LSTM 모형의 구축을 위한 자료 수집 방안)

  • Kim, Dongkyun;Kang, Seokkoo
    • Journal of Korea Water Resources Association
    • /
    • v.54 no.10
    • /
    • pp.795-805
    • /
    • 2021
  • In this study, after developing an LSTM-based deep learning model for estimating daily runoff in the Soyang River Dam basin, the accuracy of the model for various combinations of model structure and input data was investigated. A model was built based on the database consisting of average daily precipitation, average daily temperature, average daily wind speed (input up to here), and daily average flow rate (output) during the first 12 years (1997.1.1-2008.12.31). The Nash-Sutcliffe Model Efficiency Coefficient (NSE) and RMSE were examined for validation using the flow discharge data of the later 12 years (2009.1.1-2020.12.31). The combination that showed the highest accuracy was the case in which all possible input data (12 years of daily precipitation, weather temperature, wind speed) were used on the LSTM model structure with 64 hidden units. The NSE and RMSE of the verification period were 0.862 and 76.8 m3/s, respectively. When the number of hidden units of LSTM exceeds 500, the performance degradation of the model due to overfitting begins to appear, and when the number of hidden units exceeds 1000, the overfitting problem becomes prominent. A model with very high performance (NSE=0.8~0.84) could be obtained when only 12 years of daily precipitation was used for model training. A model with reasonably high performance (NSE=0.63-0.85) when only one year of input data was used for model training. In particular, an accurate model (NSE=0.85) could be obtained if the one year of training data contains a wide magnitude of flow events such as extreme flow and droughts as well as normal events. If the training data includes both the normal and extreme flow rates, input data that is longer than 5 years did not significantly improve the model performance.

Prediction of Continuous Discharge and Water Quality Change for Gate Operation in Seonakdong River Experimental Catchment Using SWAT (서낙동강 시험유역에서의 SWAT 모형을 이용한 수문 운영에 따른 연속유출 및 수질변화 예측)

  • Kang, Deok-Ho;Kim, Jung-Min;Kim, Tae-Won;Kim, Young-Do
    • Journal of Wetlands Research
    • /
    • v.14 no.1
    • /
    • pp.21-33
    • /
    • 2012
  • The dominant land use at the Seonakdong river watershed is paddy and forest areas and the Seonakdong river stands still. Thus, the water pollution in the Seonakdong river is becoming more serious for the non-point source. In this study, SWAT(Soil and Water Assessment Tool) model was evaluated for simulation of flow and water quality behaviors in Seonakdong river. To perform the calibration and verification of the SWAT model, the measurements of discharge and water quality were performed for the period from 2006 to 2007 at 5 gauging stations in Seonakdong river. The $R^2$ value for discharge and water quality were 0.86 and 0.70 respectively for calibration after the sensitive analysis. The $R^2$ value for discharge and water quality were 0.81 and 0.51 respectively for verification. The simulation results show that BOD value in the river tends to decrease after the opening of gates and the patterns of TN and TP concentrations are similar as that of BOD. The gate operators need to determine how to supply water in drought season for effective water quality improvement. This study shows that the SWAT model, which is capable of simulating hydrologic and water quality behaviors temporarily and spatially at watershed scale, could be used to get the gate operation rule for the water quality management in Seonakdong river.

A Study on Simulation based Manufacturing in Shipyards : Focused on a Long-term Plan Verification (조선소에서의 시뮬레이션 기반 생산에 관한 연구 : 선표 계획 검증을 중심으로)

  • Lee, Dong-Kun;Oh, Dae-Kyun
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.20 no.1
    • /
    • pp.86-95
    • /
    • 2014
  • Productivity improvement of a shipbuilding company depends on how efficiently its limited resources are managed and utilized. Recently, research on modeling and simulation (M&S) to support shipyard production management system has been being under study. The production management based on M&S rejects decision making on experience, and it can establish productivity improvement method based on quantitative and specific data. In this paper, M&S is applied to the long-term plan as a part of the production planning in shipyards. To this end, the long-term plan processes and related management systems are analyzed. Based on the analysis, a simulation model and an application system using commercial simulation software are suggested. And basic structure of the suggested system is based on web technology such as Rich Internet Application, web services protocol for compatibility with existing shipyard enterprise systems. Utilizing the results of this study, it is expected that shipyard production planners can settle down work flow, in which one can establishes the production plan, simulates the plan, and analyzes the results, enabling a more reliable production plans.

A Study on Design Verification of Radio Measurement System for Interplanetary Space (태양-지구 간 공간 전파 관측 시스템 설계 검증)

  • Jeong, Cheol-Oh;Park, Jae-Woo
    • Journal of Satellite, Information and Communications
    • /
    • v.6 no.2
    • /
    • pp.97-101
    • /
    • 2011
  • Interplanetary space between Sun and Earth is area of flowing very fast solar wind which is contained X ray, flare, corona mass, etc. occurred Sun surface to Earth. This solar wind is affected directly to Earth magnetosphere and ionosphere so that this bring out broadcasting and communication interruptions, satellite operation obstacles and power gird defects and etc..Solar wind flow in interplanetary space is measured as solar wind speed, density and direction by measuring scintillation value to be produced during radio source is passed through solar wind. The wider effective collective areas and the more radio sources, accuracy of solar wind measuring is got higher. Function test was performed using 3 tiles which was manufactured as prototype. Restriction of quantity of tiles, test was performed to confirm whether measured beam pattern is complied with requirement or not. In this paper, it is shown design and their specification of ground interplanetary radio measurement system as well as technical issues and resolutions which were raised during design phase. Also result of function verification test using prototype is suggested. It is confirmed that measured beam pattern was met with requirement.

Application of Remote Sensing Technology for Developing REDD+ Monitoring Systems (REDD+ 모니터링 시스템 구축을 위한 원격탐사기술의 활용방안)

  • Park, Taejin;Lee, Woo-Kyun;Jung, Raesun;Kim, Moon-Il;Kwon, Tae-Hyub
    • Journal of Korean Society of Forest Science
    • /
    • v.100 no.3
    • /
    • pp.315-326
    • /
    • 2011
  • In recent years, domestic and international interests focus on climate change, and importance of forest as carbon sink have been also increased. Particularly REDD+ mechanism expanded from REDD (Reduced Emissions from Deforestation and Degradation) is expected to perform a new mechanism for reducing greenhouse gas in post 2012. To conduct this mechanism, countries which try to get a carbon credit have to certify effectiveness of their activities by MRV (Measuring, Reporting and Verification) system. This study analyzed the approaches for detecting land cover change and estimating carbon stock by remote sensing technology which is considered as the effective method to develop MRV system. The most appropriate remote sensing for detection of land cover change is optical medium resolution sensors and satellite SAR (Synthetic Aperture Radar) according to cost efficiency and uncertainty assessment. In case of estimating carbon stock, integration of low uncertainty techniques, airborne LiDAR (Light Detection and Ranging), SAR, and cost efficient techniques, optical medium resolution sensors and satellite SAR, could be more appropriate. However, due to absence of certificate authority, guideline, and standard of uncertainty, we should pay continuously our attention on international information flow and establish appropriate methods. Moreover, to apply monitoring system to developing countries, close collaboration and monitoring method reflected characteristics of each countries should be considered.

A Study on the Estimation Measure of Delay Cost on Work Zone Using the Traffic Flow Model (교통류 모형을 이용한 도로 점용공사 구간의 지체비용 산정방안)

  • Kim, Yunsik;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.120-129
    • /
    • 2016
  • The user cost is an important analysis item which should be considered together with life-cycle of facility, administrator cost and discount rate in LCCA for efficient asset management of SOC facilities. Especially, a significant delay cost occurs often for users in the road field due to a work zone for cleaning and maintenance, and in such case, the administrator should consider the administrator cost as well as the user cost for more rational decision making. However, the user cost has not been considered in most decision making steps until recently and relevant studies also have not been carried out actively. In this study, the methodology to estimate the user cost and delay cost required in the decision making step using the traffic flow model and the direct benefit estimation model in the traffic facility investment evaluation guideline is suggested. And, the traffic flow model was estimated on 4 national highway sections where maintenance was actually carried out in 2014 using VISSIM and, the user cost and the delay cost were estimated based on the suggested methodology. The analysis result showed that the average user cost of $17,569,000KRW/km{\times}day$ occurred on Section A with approximately 30,000 AADT before a work zone occurred, and in case the first lane was blocked for maintenance, the delay cost of $10,193,000KRW/km{\times}day$ (158%) on average occurred additionally. The delay cost of $1,507,000KRW/km{\times}day$ (115%) and $1,985,000KRW/km{\times}day$ (119%) occurred on Sections B and D with approximately 20,000 AADT respectively and the delay cost of $262,000KRW/km{\times}day$ (105%) occurred on Section C with approximately 10,000 AADT. This result of this study was estimated based on the simulation of traffic flow model so that there is a limitation in its actual application. A study ot develop a highly appropriate model using actual observation data and improve the possibility to apply it through the verification using the simulation will be necessary in future.

2-D SU/PG Finite Element Model Using Quadratic Elements (2차 요소를 이용한 2차원 상향가중 유한요소모형)

  • Choi, Seung-Yong;Kim, Byung-Hyun;Kim, Sang-Ho;Han, Kun-Yeun
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.12
    • /
    • pp.1053-1067
    • /
    • 2009
  • The objective of this study is to develop an efficient and accurate quadratic finite element model based on Streamline Upwind/Petrov Galerkin (SU/PG) scheme for analyzing and predicting two dimensional flow features in complex natural rivers. For a development of model, quadratic tin, quadrilateral and mixed elements as well as linear tin, quadrilateral and mixed elements were used in the model. Also, this model was developed through reinforcement of Gauss Quadrature which was necessary to integral of governing equation. Several tests for bottom-rising channel and U-type channel were performed for the purpose of validation and verification of the developed model. Such results showed that solutions of second order elements are better accurate and improved than those of linear elements. Results obtained by the developed model and RMA-2 model are compared, and the results for the developed model were better accurate than those of RMA-2 model. In the future if the developed model is applied in natural rivers, it can provide better accurate results than those of existing model.