The flash flood has been studied in the climatological aspect which considers temporal and spatial characteristics of rainfall. However, we have not interested in runoff hydrograph for flash flood study. Therefore, our objectives of this study are to apply a work of Bhaskar et. al (2000) which studied runoff hydrograph to represent the flash flood to Korea and also to distinguish flash flood event from general flood event. That is, we quantified the severity of flash flood by estimation of flash flood index using runoff hydrograph. This study estimated the flash flood index for investigating the relative severity of flash flood in Han river basin with 101 flood events. Also we quantified the flash flood severity for flood event by heavy rainfall occurred in July of 2006. As a result, Kangwon-do province showed more severe flash flood than other areas in Han river basin and urban area such as Jungrang cheon stream also showed severe flash flood. We analyzed a flash flood of July of 2006 by dividing July into 1st to 3rd terms. From the analysis we knew that the 1st term of July showed the severe flash flood was occurred in Seoul area and the 2nd term showed it was occurred in Kangwon-do province.
Flood control and river improvement works are carried out every year for the defense of the flood disaster, it is impossible to avoid the damage when there is a flood exceeding the capacity of hydraulic structures. Therefore, nonstructural counter plans such as the establishment of flood hazard maps, the flood warning systems are essential with structural counter plans. In this study, analysis of the internal inundation effect using rainfall runoff model such as PC-SWMM was applied to Woo Ee experimental stream basin. Also, the design frequency analysis for effects of the external inundation was accomplished by main parameter estimation for conclusive hydraulic routing using HEC-RAS model. Finally, inundated areas for flood hazard map were estimated at Woo Ee downstream basin according to flood frequency using HEC-GeoRAS model linked by Arc View GIS.
A flood loss estimation toolbox was developed within GIS software. This toolbox is for anyone who is interested in the flood loss estimation, and uses data accessible to public. In particular, the loss estimation framework in the toolbox is distinct in that the inventory items are individually dealt with. The toolbox was applied to estimate the economic loss from a levee failure event in 2002. The estimated loss was a little larger than the reported value. The difference is probably due to the asset values and the damage functions for each inventory item, which have to be updated.
In the present study the methods proposed by Fuller and Sangal were evaluated to estimate the peak flood discharge based on the mean daily discharges during a flood period. The total of 198 flood events observed at seven stage gauging stations in the Han River basin were analyzed. The result showed that the peak flood discharges estimated based on the mean daily flows have a relatively high correlation with the observed peak floods. Hence, a regionalized relation and method is proposed for a possible application to estimate the peak flood discharges at the stage gauging stations with no hourly flood stage data, but with the mean daily stages.
The purpose of this study was to propose applicability of spatial data and quality check criteria for estimating damage from storm and flood. Using the data from the National Disaster Management System and National Spatial Data Infrastructure, spatial database for estimation of storm and flood damage has been mapped to each type of damage. This was proposed as the quality check criteria for damage analysis. Through this study, it is possible to utilize the spatial database for estimating storm and flood damage. The reliability of analysis results are ensured through the quality check criteria.
KSCE Journal of Civil and Environmental Engineering Research
/
v.26
no.4B
/
pp.363-369
/
2006
A simple and an improved methods for the economic analysis of the flood control project has been in previous studies in Korea. In 2004, the Multi-Dimensional Flood Damage Analysis (MD-FDA) was developed and now it is widely used for the economic analysis of flood control project. However, the MD-FDA was developed for general damage assessment and analysis without consideration of specific regional characteristics such as urban and rural areas. To compensate the MD-FDA for the application in urban area, a part of damage estimation components is modified and a component for the flood damage estimation is suggested. The component we suggest is for the consideration of the capability of stormwater pump stations in the study area. When flood is occurred in the urban area, the damage potential is larger than the rural area because of the concentration of human lives and properties. So, many stormwater pump stations are located in the urban area and the inundation depth is estimated by considering the capabilities of pump stations. We also compensate the damage components such as the damages of industrial area, and public facilities for the flood damage estimation of the urban area. The results by the compensated MD-FDA for the urban area application with those by original MD-FDA are compared. As a result the B/C ratio showed 6.75 and 5.51 respectively for the modified and original MD-FDA. This difference might be largely affected by the damage rate of the public facilities.
Proceedings of the Korea Contents Association Conference
/
2009.05a
/
pp.442-448
/
2009
Recently, the natural disaster has occurred as a heavy snow fall, drought and flood by abnormal weather. The damage of human and property by flood is most serious problem among those natural disaster. In order to prepare structural or non-structural measure, to estimate exact flood discharge is important element. This study analyze frequency of hour-unit rainfall data and estimate probability flood discharge by HEC-HMS as changing method of runoff analysis. Also, this study analyze the peak flood discharge sensibility according to Curve Number(CN) with the return period. As a result of estimation of probability flood discharge with the variety CN, to select Antecedent Moisture To select suitable condition(AMC) is important parameter because flood discharge is estimated 40% gap according to AMC.
This study aims at suggesting an alternative to improve flood controling capacity according to the cument design criteria for the existing Soyanggang Multi-purpose Dam which was constructed 20 years ago as the largest dam in Korea. The peak inflow of the adopted probable maximum flood (PMF) at the time of construction was 13,500 $m^3$/s. However, the newly estimated peak inflow of the PMF is 18,000 $m^3$/s which is 1.34 times bigger than the original one. This is considered to be due to the accumulation of the reliable flood and storm event records after construction, and due to the increasing tendency of the local flood peaks according to the influence of world-wide weather change. The new estimation of the probable maximum precipitation (PMP) was based on the hydro-meteorological method suggested by the guideline of the World Meteorological Organization (WMO). The unit hydrograph which was applied for the estimation of PMF was derived through linear programming algorithm by minimizing the sum of absolute deviations of the calculated and recorded flood hydrographs. In order to adopt the newly estimated PMF as a design flood, following four alternatives were compared : (1) allocation of more flood control space by lowering the normal high water level, (2) construction of a new spillway in addition to the existing spillway, (3) construction of a new dam which has relevant flood control storage at the upstream of the Soyanggang dam, (4) raising the existing dam crest. The preliminary evaluation of these alternatives resulted in that the second alternative is most economic and feasible. So as to stably cope with the newly estimated PMF by meeting all the current functions of the multipurpose dam, a detailed study of an additional spillway tunnel has to be followed.
In this study, past method and recent method for flood discharge with domestic multi-purpose dams in Korea were compared and analyzed with respect to the scale of watershed. Rainfall depth, temporal pattern, rainfall excess, rainfall-runoff model, parameter estimation and base flow were selected as the principal factors affecting flood discharge and effects on flood discharge were analyzed quantitatively by using sensitivity analysis. The results showed that the flood discharges calculated by past and recent method increased and decreased with a wide range of discharge with respect to the scale of watershed. The reason for decrease of flood discharge is the exchange of temporal pattern of rainfall and the principal reasons for increase of flood discharge are the increase of rainfall depth by unusual weather phenomena and the difference of estimation method for parameters of unit hydrograph.
Proceedings of the Korean Society of Agricultural Engineers Conference
/
1999.10c
/
pp.512-518
/
1999
Recently rainfall and water evel are monitored via on -line system in real-time bases. We applied the on-line system to get the rainfall and waterlevel data for the development of the real-time flood forecasting model based on SCS method in hourly bases. Main parameters for the model calibration are concentration time of flood and soil moisture condition in the watershed. Other parameters of the model are based on SCS TR-%% and DAWAST model. Simplex method is used for promoting the accuracy of parameter estimation. The basic concept of the model is minimizing the error range between forcasted flood inflow and actual flood inflow, and accurately forecasting the flood discharge some hours in advance depending on the concentration time. The flood forecasting model developed was applied to the Yedang and Topjung reservoir.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.