• Title/Summary/Keyword: Fixing pipe

Search Result 12, Processing Time 0.025 seconds

Design Process of Fixing Pipe in Guide Pipe-Anchor System for Cable-Stayed Bridge (사장교 가이드 파이프 앵커 형식에서의 정착강관 설계절차)

  • Hong, Sung Nam;Park, Sun Kyu;Park, Byung Gun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.4
    • /
    • pp.212-220
    • /
    • 2011
  • These days, many cable-stayed bridges were constructed in accordance with the trend in Korea. At the moment, construction technology of cable-stayed bridges has been remarkably developed but design technology still relies upon foreign technology very much. The cable anchor system that is one of key technologies of cable-stayed bridge brings powerful cable tension to produce local stress concentration and to disturb stress seriously, so for safety must be designed by a local detailed analysis is required. But without a clear design standard or design theory relying on F.E.M, and engineers don't understand theoretical basic mechanism of cable anchor system. As a result, engineers can be lose their judgement. Accordingly, this study examined theoretical design flow of fixing pipe in guide pipe-anchor system and additional considerations, in accordance with design standards at home and abroad to keep them in order and to suggest supplementary design flow.

The Development of Robot that is Detecting of Sewage Pipe and Cutting of Connection Projecting Part (하수관로 검사 및 연결 절단부 로봇의 개발)

  • Chung Jae-Kang;Kim Woo-Jin;Kim Jae-Yeol
    • Tribology and Lubricants
    • /
    • v.22 no.4
    • /
    • pp.225-229
    • /
    • 2006
  • The issue with the drainpipe now a day is that they are laid underground. Causing us to perform additional work to repair, such as digging up the ground and peeling off the insulator that surrounds the pipe. And such series works are difficult that concession appears from government and municipal office. However, if we can save time and money. Performance of piping robot that we are studied in existing session through fixing unit and improvement of cutting bit shorten and wished to heighten work efficiency. And we are trying to develop a unit that can cut up the projecting parts which connects with the interior part of the drainpipes.

A Study on Seismic Restraint of Korean Type Building Gas Piping (한국형 건축물 가스 배관의 내진 고정장치에 관한 연구)

  • Lim, Geon-Tae;Lim, Sang-Ho
    • Industry Promotion Research
    • /
    • v.4 no.1
    • /
    • pp.11-20
    • /
    • 2019
  • This study relates to a fixing device for gas piping installed in a building such as an apartment or a building. The gas piping is fixed to the inside of the housing so as to buffer the gas piping in all directions, thereby relieving vibration caused by an earthquake or an impact, Disclosed is an earthquake-proof fixing device for a gas pipeline that can minimize damages caused by damage to an earthquake and a gas pipeline by preventing damage and breakage. An apparatus for fixing a gas pipe to a bracket provided on a wall or a wall of a building, the apparatus comprising: a housing coupled to a wall or a bracket and coupled to the inside of the housing; a gas pipe penetrating through the housing to fix the gas pipe; The first plate spring includes a first plate spring formed with a plurality of concave-convex portions that are elastically supported in four directions. The first plate spring is screwed to the front surface or the rear surface of the housing. The lower plate is coupled to one end and the other end, And a pair of first adjusting screws for adjusting the elastic force of the spring. Through this study, damage and damage of gas piping due to earthquake or impact can be minimized.

Fixing unit and byte improvement of unit for cutting of projecting parts connects with interior part of drainpipe (하수관로 연결돌출부 절단기 유닛 고정유닛과 바이트 개선)

  • Kim, Jae-Yeol;Yoo, Sin;An, Jae-Sin;Kwak, Yi-Gu;Song, Kyung-Seok;Lee, Chang-Sun
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2003.06a
    • /
    • pp.1166-1169
    • /
    • 2003
  • The issue with the drainpipe now a day is that they are laid underground Causing us to perform additional work to repair, such as digging up the ground and peeling off the insulator that surrounds the pipe. And such series works are difficult that concession appears from government and municipal office. However, if we can save time and money. Performance of piping robot that we are studied in existing session through fixing unit and improvement of cutting byte shorten and wished to heighten work efficiency. This is why we aye trying to develop a unit that can cut up the projecting parts which connects with the interior part of the drainpipes.

  • PDF

The Installation Effect and Optimal Pipe Sizes of an Anti-Wind Net by Computational Analysis (전산 해석에 의한 파풍망의 설치 효과와 최적 파이프 규격)

  • Yum, Sung-Hyun;Kwon, Ki-Jeong;Sung, Si-Heung;Choi, Young-Don
    • Journal of Biosystems Engineering
    • /
    • v.32 no.6
    • /
    • pp.430-439
    • /
    • 2007
  • This study was carried out to(1) visualize the installation effect of an anti-wind net; (2) evaluate structural stability of typical anti-wind nets in Jeju; and (3) present the optimal specification of pipes in an anti-wind net for maximum instant wind velocities of 40 m/s and 45 m/s. The analyses were done for anti-wind nets with a mesh of 4 mm and a height of 3 m by using CFX and ANSYS. The results showed that the wind went down due to flow resistance when passing through an. anti-wind net. The anti-wind net with the supporting pipe being installed every two main columns was certainly unstable because the main column not sustained by the supporting pipe became cantilever. With regard to the position of a fixing point of the supporting pipe, von Mises stress on pipes was certainly increased as vertical positions of the supporting pipe were changed to be too lower or higher than an adequate position but there was little difference according to horizontal positions. The adequate vertical position was $2{\sim}2.5\;m$ high from the ground. For a maximum instant wind velocity of 40 m/s, the optimal specification of pipes was a main column of ${\varphi}48.1{\times}2.1$ t@2,000, cross beams(bottom and top) of ${\varphi}26.7{\times}1.9\;t$, cross beams(center) of ${\varphi}33.5{\times}2.1$ t/2ea and a supporting pipe of ${\varphi}31.8{\times}1.5$ t@2,000. In case of a maximum instant wind velocity of 45 m/s, the optimal specification of pipes with structural stability was a main column of ${\varphi}48.6{\times}3.25$ t@2,000, cross beams(bottom and top) of ${\varphi}26.7{\times}1.9\;t$, cross beams(center) of ${\varphi}48.1{\times}2.1$ t/2ea and a supporting pipe of ${\varphi}31.8{\times}1.5$ t@2,000.

Development of unit for cutting of projecting parts connects with interior parts of drainpipe (하수관로 연결 돌출부 절단기 유닛 개발)

  • 김재열;김영석;안재신;곽이구;송경석;이창선
    • Proceedings of the Korean Society of Machine Tool Engineers Conference
    • /
    • 2003.04a
    • /
    • pp.143-148
    • /
    • 2003
  • The issue with the drainpipe now a day is that they are laid underground. Causing us to perform additional work to repair, such as digging up the ground and peeling off the insulator that surrounds the pipe. And such series works are difficult that concession appears from government and municipal office. However, if we can save time and money. Performance of piping robot that we are studied in existing session through fixing unit and improvement of cutting byte shorten and wished to heighten work efficiency. This is why we are trying to develop a unit that can cut up the projecting parts which connects with the interior part of the drainpipes.

  • PDF

Long-Life Demonstration Housing Infill Construction : Theory and Practical Limits (장수명 실증주택 인필 시공: 이론과 현실적 한계)

  • Kim, Soo-Am;Yang, Hyeon-Jeong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.89-90
    • /
    • 2019
  • The purpose of this study is to clarify the difference between design and construction conditions based on theory for support (S) and infill (I) distinction and separation in long-life housing, and to search for future direction. To do this, the SI theory is summarized and the construction situation is examined in the demonstration house and the differences and limitations are analyzed. In order to realize SI separation in Korea, it is necessary to set the position of pipe shafts for sewage and drainage, buried in the structure and Ondol layer of the private pipes, buried various wires in the inner wall, and fixing the position of the inner wall.

  • PDF

Long-term performance of drainage system for leakage treatment of tunnel operating in cold region (한랭지역에서 운영 중인 터널의 누수처리를 위한 유도배수시스템의 장기 성능 평가)

  • Kim, Dong-Gyou
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.6
    • /
    • pp.1177-1192
    • /
    • 2018
  • The objective of this study is to develop the existing drainage system for catching the partial leakage of tunnel structures operating in cold region. The drainage system consists of drainage board, Hotty-gel as a waterproofing material, cover for preventing protrusion of Hotty-gel, air nailer, fixed nail, pipe for collecting ground leak, pipe for conveying ground leak, wire-mesh, and sprayed cement mortar. The drainage systems were installed in conventional concrete lining tunnels to evaluate the site applicability and constructability. The performances of waterproof and the drainage in the drainage system were evaluated by injecting 1,000 ml of red water in the back of the drainage system at 7 days, 14 days, 21 days, 28 days, 2 months, 3 months, 4 months, 5 months, 6 months, 7 months and 8 months. During 8 months of field test, the average daily temperature of the tunnel site was measured from $-16.0^{\circ}C$ to $25.6^{\circ}C$. The daily minimum temperature was $-21.3^{\circ}C$ and the daily maximum temperature was $30.8^{\circ}C$. There was no problem in waterproof and drainage performance of the drainage board in the drainage system. However, the pipe for conveying ground leak had the leakage problem from 14 days. It is considered that the leakage of the pipe for conveying ground leak was caused by the deformation of the pipe of the flexible plastic material having a thickness of 0.2 cm by using the high pressure air nailer and the fixing pin and the insufficient thickness and width of the hotty-gel for preventing the leakage.

An Experimental Study on the Load Resistance of Toilet Bowl in Long-Life Housing Infill System (장수명주택 벽배관 시스템의 양변기 하중저항성에 대한 실험적 연구)

  • Lee, Jongho;Seo, Dong-Gu;Kim, Eun-Young;Hwang, Eun-Kyoung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.211-212
    • /
    • 2019
  • It is possible to realize the concept of long-life housing by utilizing the wall piping infill system. However, when using the wall piping infill system, there is no detailed standard in Korea. Problems may occur in actual use. In this study, we use the results obtained from the performance test method as a basic data. Since the load resistance test of the toilet is not available in Korea, GB 6952 (Sanitary wares) of China is applied. According to the experiment of load resistance of the toilet in this study, the strain recovery ability was good. However, it is not possible to exclude the possibility of permanent deformation of the toilet seat due to long - term repeated loading. Therefore, it is necessary to consider the stiffness enhancement of the wall (steel frame) to the fixing part when installing the toilet in the wall pipe infill system.

  • PDF

Energy Saving Effect for High Bed Strawberry Using a Crown Heating System (고설 딸기 관부 난방시스템의 에너지 절감 효과)

  • Moon, Jong Pil;Park, Seok Ho;Kwon, Jin Kyung;Kang, Youn Koo;Lee, Jae Han;Kim, Hyung Gweon
    • Journal of Bio-Environment Control
    • /
    • v.28 no.4
    • /
    • pp.420-428
    • /
    • 2019
  • This study is the heating energy saving test of the high-bed strawberry crown heating system. The system consists of electric hot water boiler, thermal storage tank, circulation pump, crown heating pipe(white low density polyethylene, diameter 16mm) and a temperature control panel. For crown heating, the hot water pipe was installed as close as possible to the crown part after planting the seedlings and the pipe position was fixed with a horticultural fixing pin. In the local heating type, hot water at $20{\sim}23^{\circ}C$ is stored in the themal tank by using an electric hot water boiler, and crown spot is partially heated at the setting temperature of $13{\sim}15^{\circ}C$ by turning on/off the circulation pump using a temperature sensor for controlling the hot water circulation pump which was installed at the very close to crown of strawberry. The treatment of test zone consisted of space heating $4^{\circ}C$ + crown heating(treatment 1), space heating $8^{\circ}C$(control), space heating $6^{\circ}C$ + crown heating(treatment 2). And strawberries were planted in the number of 980 for each treatment. The heating energy consumption was compared between November 8, 2017 and March 30, 2018. Accumulated power consumption is converted to integrated kerosene consumption. The converted kerosene consumption is 1,320L(100%) for space $8^{\circ}C$ heating, 928L(70.3%) for space $4^{\circ}C$ + crown heating, 1,161L($88^{\circ}C$) for space $6^{\circ}C$ + crown heating). It was analyzed that space $4^{\circ}C$ + pipe heating and space $6^{\circ}C$ + crown heating save heating energy of 29.7% and 12% respectively compared to $8^{\circ}C$ space heating(control).