• Title/Summary/Keyword: Fixed-Cost

Search Result 981, Processing Time 0.028 seconds

Diagnostic Analysis and Influential Factors of CM Fee Estimation (CM 대가 산정방식의 문제점 분석에 대한 연구 -문화예술회관 사례를 중심으로-)

  • Yoo, Byeong-Gi;Jung, Chan-Young;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.6
    • /
    • pp.132-140
    • /
    • 2006
  • On December, 1996, Construction Management(CM) was introduced in Korean construction industry due to its managerial efficiency proven in the international construction industries. However, It have had serious problems with many regulations, standards, manuals and details of practices considering its constituents and industry conditions. Especially, there were controversial points in the CM fee estimate; difference between the fee on the owner's view point and that from contractor's that impedes appropriate CM services. Therefore, this paper is to analyze public construction projects into Cm fee calculation such as fee as a percent of construction cost, cost plus fixed fee and contract price, and analyzed what is irrationality and why irrationality is made. So it makes a contribution to a study on standards for paper CM fee calculation.

New High Performance and Low Cost Construction of Unified Power System for LCD TV Backlight Driver Circuitb (LCD TV를 위한 새로운 구조의 고성능 및 저가형 Backlight 구동 전원 통합 시스템)

  • Jang, Doo-Hee;Lee, Jae-Kwang;Roh, Chung-Wook;Hong, Sung-Soo;Kim, Jin-Wook;Lee, Hyo-Bum;Han, Sang-Kyoo
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.14 no.1
    • /
    • pp.23-30
    • /
    • 2009
  • A new high performance and low cost unified power system is proposed through investigating conventional Power-Integrated Drive(PID) system and Power-Separated Drive(PSD) system applied to LCD TV. Since the proposed system consists of two stage, namely power and inverter stage it features high efficiency and cost effectiveness. To satisfy the safety standard of the High voltage transformer, 1:1 transformer is employed between inverter and high voltage transformer. Moreover, to ensure the Zero Voltage Switching(ZVS) of all power switches and the Pulse Count Modulation(PCM) method is employed, which controls the number of pulse at the fixed frequency and fixed duty cycle. Therefore, it features high efficiency, improved heat generation, cost effectiveness and good EMI performance including no additional current balancing coil. To confirm the validity of proposed system, comparison of conventional system, verification of experimental results are presented.

A Study on Economic Operation for Liner-Fleet by Fluctuation of Fuel Oil Price (연료유 가격변동에 따른 컨테이너선대의 경제적 운영방안)

  • Lee, Soo-Dong;Shin, Jeong-Hoon;Kim, Chul-Hyun;Chang, Myung-Hee
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2009.06a
    • /
    • pp.173-174
    • /
    • 2009
  • For container shipping company, fuel oil prise is a considerable expense. In the last 3 years, fuel oil prises have risen considerably. An increasing fuel oil prise in container shipping, in the short term, is only partially compensated through surcharges and will therefore affect earnings negatively. This paper deals with the impact of increasing fuel oil price and capital costs for vessels on the number of vessels on the Asia-Europe trade. As per result of 'H' carrier's operation in 2008, there were no cost difference between 8 and 9 vessels operation in case the fuel oil price is USD 169/tons while adopt USD 31,818 as fixed cost. We can expect that the fuel oil price will not be decreased under USD 200 $/Ton on the basis of current high oil price phenomenon. When the fuel oil price is over USD 200 $/ton, therefore, 9 vessels operation is more economic than 8 vessel operation even if the fixed cost is over USD 35,000.

  • PDF

A Study on the Method of New Activity Based Cost Management Coping with Changes in the Cost Structure of Real Estate Construction Industry (부동산 건설업의 원가구조 변화에 대응한 공종별 신활동기준 원가관리 기법에 관한 연구)

  • Lee Jeong-Min
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.69-79
    • /
    • 2003
  • About 93$\%$ of domestic teal estate construction firms registered as the end of 2001 recorded net profits of only less than 500 million won(including firms in the red) for the term. As a result of having analyzed the ratios of sales costs and the structural ratios of sales costs for the past 10 years, it was found that there have been great changes in structural ratios of sales costs. Material costs and labor costs have gradually decreased, but outsourcing costs of processing have greatly increased. In order to find activity points which are fundamental to cost control, the methods of new activity based cost management have been pursued. The characteristics of real estate construction industry lie in the fact that contract prices (sales in) are fixed and amounts of profits differ depending on the use of costs. In order to create maximum profits from fixed contract prices, the new activity based cost management has been proposed. The control of operation budgets and management costs is designed to control their schedules and expenses in different respects. Operation budgets ate executed with specific activities and management costs are controlled as a form of material costs, labor costs, out sourcing costs and expenses which are details of expenditure. In order to execute them by using the methods of new activity based cost management, first of all, we have to analyze what activity drivers ale and how much added values such activities can create. It is considered as a method of cost management which is necessary far the survival management of real estate construction industry.

Development of Interference Cancellation Algorithm for WCDMA Repeater under Fixed-Point Operation (고정 소수점 연산을 이용한 WCDMA 중계기에서의 귀환 신호제거 알고리즘의 개발)

  • Jung, Hee-Seok;Yun, Kee-Bang;Kim, Ki-Doo
    • Journal of the Institute of Electronics Engineers of Korea SP
    • /
    • v.46 no.1
    • /
    • pp.95-103
    • /
    • 2009
  • We improve the performance of WCDMA repeater by cancelling the feedback interference radio signal under the fixed point implementation. Floating-point DSP or FPGA to implement the ICS algorithm may have an disadvantage of high cost, To solve this problem, we suggest the ICS algorithm based on LMS under fixed point operation, and show the validity of our results by comparing with the floating-point results through numerical simulation.

Multi-Objective Short-Term Fixed Head Hydrothermal Scheduling Using Augmented Lagrange Hopfield Network

  • Nguyen, Thang Trung;Vo, Dieu Ngoc
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.6
    • /
    • pp.1882-1890
    • /
    • 2014
  • This paper proposes an augmented Lagrange Hopfield network (ALHN) based method for solving multi-objective short term fixed head hydrothermal scheduling problem. The main objective of the problem is to minimize both total power generation cost and emissions of $NO_x$, $SO_2$, and $CO_2$ over a scheduling period of one day while satisfying power balance, hydraulic, and generator operating limits constraints. The ALHN method is a combination of augmented Lagrange relaxation and continuous Hopfield neural network where the augmented Lagrange function is directly used as the energy function of the network. For implementation of the ALHN based method for solving the problem, ALHN is implemented for obtaining non-dominated solutions and fuzzy set theory is applied for obtaining the best compromise solution. The proposed method has been tested on different systems with different analyses and the obtained results have been compared to those from other methods available in the literature. The result comparisons have indicated that the proposed method is very efficient for solving the problem with good optimal solution and fast computational time. Therefore, the proposed ALHN can be a very favorable method for solving the multi-objective short term fixed head hydrothermal scheduling problems.

A Newly Designed Fixed Bed Redox Flow Battery Based on Zinc/Nickel System

  • Mahmoud, Safe ELdeen M.E.;Youssef, Yehia M.;Hassan, I.;Nosier, Shaaban A.
    • Journal of Electrochemical Science and Technology
    • /
    • v.8 no.3
    • /
    • pp.236-243
    • /
    • 2017
  • A fixed-bed zinc/nickel redox flow battery (RFB) is designed and developed. The proposed cell has been established in the form of a fixed bed RFB. The zinc electrode is immersed in an aqueous NaOH solution (anolyte solution) and the nickel electrode is immersed in the catholyte solution which is a mixture of potassium ferrocyanide, potassium ferricyanide and sodium hydroxide as the supporting electrolyte. In the present work, the electrode area has been maximized to $1500cm^2$ to enforce an increase in the energy efficiency up to 77.02% at a current density $0.06mA/cm^2$ using a flow rate $35cm^3/s$, a concentration of the anolyte solution is $1.5mol\;L^{-1}$ NaOH and the catholyte solution is $1.5mol\;L^{-1}$ NaOH as a supporting electrolyte mixed with $0.2mol\;L^{-1}$ equimolar of potassium ferrocyanide and potassium ferricyanide. The outlined results from this study are described on the basis of battery performance with respect to the current density, velocity in different electrolytes conditions, energy efficiency, voltage efficiency and power of the battery.

Design on Fixed Quantity Analytical Model for Information System Audit based on Requirements (요구사항 기반 정보시스템 감리의 정량화 분석 모델 설계)

  • Kim, Hee-Wan;Kim, Hun-Kyeom;Koh, Chan;Kim, Dong-Soo
    • Journal of Digital Convergence
    • /
    • v.9 no.5
    • /
    • pp.141-156
    • /
    • 2011
  • Auditors' subjective opinions m audit activities weaken reliability in audit judgments. This paper suggests fixed quantity models through requirement priority for improving objective evaluation and priorities of requirements in information system audit. The value of requirements was evaluated based on customers' requirements with a premise that they are not in the same level. Furthermore, the audit objective judgments were enhanced to enable fixed quantity of subjective audit by subdividing detailed evaluation index of requirement priority standards into importance of service and function on orderers' perspective, and sectioning cost and schedule on contractors' perspective.

Design of Tag in-Tag out for ATP/ATO in the Light Rail and Monorail (경전철/모노레일의 ATP/ATO를 위한 Tag in-Tag out 설계)

  • Ryu, Deung-Ryeol;Lee, Key-Seo;Oh, Sang-Min
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1264-1269
    • /
    • 2008
  • We designed a track circuit of Tag in-tag out type that can be used for light rails and monorails. This method is called RFID-Tag and it literally uses RFID-Tag and replaces a fixed track circuit and implements a moving block. The distance between RFID-Tags is set to the length of a train and thus a train is always in contact with one of the tags. A train runs in RFID-Tag in -RFID-Tag out type at all times and the distance between trains can be precisely controlled through the application of a moving block combined with the basic principle of a fixed block, which enables the continuous speed control and enhances the satisfaction of passengers. When constructing a track circuit using RFID-Tag the Tag in-tag out brings us the cost reduction and is more economical than the existing fixed track circuit in that sense and easy for installation and maintenance. The wireless communication between onboard and wayside makes the continuous control possible and can improve the control capacity of ATP/ATO by the implementation of a moving block on top of a fixed one.

  • PDF

An Optimal Decision Model for Capacity and Inclining Angle of Residential Photovoltaic Systems (주택용 태양광발전시스템의 적정 용량 및 설치각 선정을 위한 최적화 모델 연구)

  • Jeon, Jeong-Pyo;Kim, Kwang-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.6
    • /
    • pp.1046-1052
    • /
    • 2010
  • In residential house, photovoltaic (PV) system among various alternatives in renewable energy system is the most efficient and feasible solution for reducing energy consumption and electricity cost. However, relatively high initial cost make people reluctant to install PV system in their houses. Therefore, in the initial state for PV system installation in the house, it is very important to decide proper capacity of the PV system considering the expected energy usage and solar energy supplying condition with the house. This paper proposes a novel optimization model for deciding appropriate capacity of the PV system for residential house. The objective function of the model is to minimize the annual cost including electricity bill, operation and maintenance cost, and annual fixed cost calculated from the initial installation cost based on capital recovery factor (CRF). The model also shows the optimal inclining angle of PV panels of the system. In this paper, we estimate the PV output using PVWATTS (PV simulator of Office of Energy Efficiency and Renewable Energy) and find optimal solutions by Sequential Quadratic Programming (SQP) method using MATLAB software. The proposed approach is finally applied to a residential model house in Gangneung, Gangwon-Do and verified its feasibility for adopting to PV system design for residential houses.