• Title/Summary/Keyword: Fire-fighting water facility

Search Result 8, Processing Time 0.023 seconds

Experimental Study on Spray Performance of Nozzles for Autonomous Fire Fighting Monitor (자율형 소화모니터 노즐의 분사 성능에 대한 실험 연구)

  • Rhyu, SeongSun;Kim, HyoungTae;Seo, JeongHwa
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.59 no.2
    • /
    • pp.80-88
    • /
    • 2022
  • A systematic experimental study is carried out for the fire fighting monitor nozzle of 65A diameter to design and manufacture a new nozzle with better water spray performance than available domestic nozzles. The nozzle inlet pressure, flow rate and reach for the discharged water from the nozzle are measured by utilizing the experimental facility consisting of two pumps and piping system with a flow meter and pressure gauges. It was found that the baffle position and baffle head chamfering were the most sensitive design factors to be remarkably changed in the flow rate of the discharged water. Also, It was confirmed that the baffle position and the water exit area had the significant effect on the change in reach distance. The results obtained from this study are expected to be used effectively to design new nozzles with excellent spray performances and also to validate numerical analysis results for evaluating the water spray performance of fire fighting monitor nozzles.

Comparison Analysis of Ready to Use Time Depending on The Type of Public Fire Hydrant of Fire-fighting Water Facility (소방용수시설의 공설소화전 종류에 따른 사용 준비시간 비교분석)

  • Jeon, Jai-In;Kong, Ha-Sung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.5 no.4
    • /
    • pp.87-92
    • /
    • 2019
  • The purpose of this study is to investigate the preparation time of fire-fighting water for public fire hydrants and ground, underground fire hydrants. The equipment preparation time for stage 1 was 20.50 seconds for ground type and 24.67 seconds for underground type. The reason for this difference in preparation time is that an underground fire hydrant requires additional standpipes to connect to the main conduit of Paru and the underground hydrant, which open the manhole cover. Water tank Maintenance joint with water hose male coupling of the second stage was similar to that of the ground type of 48.50 seconds and underground water tipe of 49.00 seconds. This is because the operation of connecting the fire hose to the maintenance tank of the water tank car is the same. In the third stage, the water pipe connection was 43 seconds for ground type and 174.33 seconds for underground type. The reason why the time for connecting the water pipe to the fire hydrant is large difference is that the underground fire hydrant is opened by opening the manhole cover, After connecting the stand pipe to the fire hydrant, the additional process of connecting the water pipe to the stand pipe is required, which is considered to have greatly increased the time required. The opening of Water Control Valve and spindle Valve in the fourth stage was 66.50 seconds for the ground type and 78.83 seconds for the underground type. This difference is due to the fact that the spindle of the ground fire hydrant is located on the main body and can be easily opened, but the underground type is located next to the main body under the manhole and requires additional time to connect the opening equipment.

A Study on the Revision of the Fire Safety Standard of the Fire Department Connection (연결송수관설비 화재안전기준(NFSC 502) 개정에 관한 연구)

  • Jang, Gyeong-Nam;Baek, Eun-Sun
    • Fire Science and Engineering
    • /
    • v.32 no.5
    • /
    • pp.67-76
    • /
    • 2018
  • Among the firefighting facilities, the fire department connection during firefighting is more important than any other facilities at the firefighting site to supply fire water. This study examined the water supply port of a fire department connection installed at an apartment building based on the Standard for Fire Safety (NFSC 502). The time of discovery was measured by fire fighters who knew or did not know of the water supply port installed in the apartment building, and by separating day and night. To maximize the use of the fire department connection which is the full fire extinguisher facility used by the fire brigade based on the results of the experiment, the author suggests improvement proposals that can clarify the installation location and install the location sign of the fire department connection for the Standard for Fire Safety (NFSC 502).

A Study on the Friction Loss Reduction in Fire Hoses Used at a Fire Scene (화재현장에서 사용하는 소방호스의 마찰손실 감소 방안에 관한 연구)

  • Min, Se-Hong;Kwon, Yong-Joon
    • Fire Science and Engineering
    • /
    • v.27 no.3
    • /
    • pp.52-59
    • /
    • 2013
  • It was described the measured friction loss depending on pressure used and changes in water flow rates for a fire hose used at a fire scene on this study. As a result of actual measurement based on the result obtained by analyzing the use situation of a fire hose such as the kind, quantity, pressure used, etc. of a fire hose, the friction loss in a fire hose under the condition of using by a fire officer at a fire scene was measured as up to 56.8 %. This is much different from the equivalent length of a fire hose used to calculate the pump head in an indoor and outdoor fire-fighting facility. There is no related restrictive regulation on friction loss, there are even no data on friction loss measured by fire hose makers, and spreading a fire hose without considering friction loss at a fire scene can result in an increased length of hose used and a high-pressure water discharge from a fire engine, so this study aims to establish a standard for an equivalent length to friction loss in a fire hose and to propose a spreading method considering friction loss in a fire hose at a fire scene.

A Study on the Analysis of Actual costs and Maintenance costs for Elemental Classification hierarchy (부위별 분류 체계를 통한 공사비 및 유지관리비 분석 - 교육 시설물을 중심으로 -)

  • Kang, Hyun-Wook;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.1
    • /
    • pp.142-150
    • /
    • 2010
  • The purpose of this study is to analyze maintenance costs and estimation of elemental costs for educational buildings. The adapted research method selected four school buildings in seoul region as BTL projects. On the basis of the selected case, the study suggested a model to establish a system for each parts and estimate analyzed construction costs and maintenance costs according to that system. According to the analysis, the study proposed a partial construction costs analysis table and maintenance costs table and analyzed proper construction costs and maintenances costs. The results of this study are as follows 1) The average ratio followed by calculation of partial construction costs of the four school buildings are as followings. The total construction costs is analysed 6,666million won and each part of average rations is structure 47.15%, exterior of building 8.34%, interior of building 23.37%, electricity & fire fighting facility 5.74%, water supply & healthy facility 4.27%, heating & water supply facility 5.25%, landscape 1.36%, civil engineering works 4.51%. 2)The average ratio followed by analysis of partial maintenance costs of the four school buildings are as followings. The total maintenance costs is analysed 4,309 million won and each part of average ratio is exterior of building 11.02%, interior of building 41.81%, electricity & fire fighting facility 14.81%, water supply & healthy facility 11.22%, heating & water supply facility 12.76%, landscape 5.75%, civil engineering works 2.63%.

A Study on the Fire Prevention Activities and Suppression Measures of Utility-Pipe Conduit (지하공동구 화재예방활동 및 진압대책에 관한 연구)

  • Lee, Jung-Il
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.10 no.4
    • /
    • pp.63-68
    • /
    • 2010
  • Utility-Pipe Conduit is, Housing and city effectively accommodate what they absolutely need power, communications, gas, pipeline, water supply, drainage, energy facilities etc, according to expansion of urban infrastructure are derived, several ways to solve problems in, collection facilities in place are maintained and managed facility. If Utility-Pipe Conduit is damaged, as well as national security, because their impact on society as a whole, by introducing large vulnerability in the fire prevention activities and suppression measures and disaster for our situation by introducing measures, comprehensive analysis of the fire risk, it shall establish fire prevention activities and suppression through analysis of Utility-Pipe Conduit design, institutional issues, the problem of fire protection facilities, fire spread phenomenon etc. Because of Utility-Pipe Conduit is an enclosed place, so incomplete combustion due to lack of oxygen supply that there are problem such dark smoke, carbon monoxide etc, toxic combustion products and heat generation and visual impairment is an issue difficult to enter. As well as fire prevention activities, the fire In light of the particularity of the under ground than above ground fire, so this phenomenon is weak fire fighting that fire to become effective fire fighting tactics, basically it is necessary difficulty softening, non-burn softening and prevent combustion expansion of the cable is installed on the Utility-Pipe Conduit, having to considering the specificity of the response command system and relevant organizations to establish an on-site, Structural identification and other information gathering required to record of Response agencies, keep air conditioning system 24 hours and strengthening Virtual Total Training of Response agen

The Study on the Analysis of Elemental Maintenance Costs for Educational Facilities

  • Hyun-Wook Kang;Seung-Wook Lee;Sung- Ryul Bae;Byoung-Jun Min;Moon-Sun Park;Yong-Su Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1254-1259
    • /
    • 2009
  • The purpose of this study is to analyze elemental maintenance costs for educational buildings. The adapted research method selected three school buildings in Seoul as BTL projects. On the basis of the selected case, the study suggested a model to establish a system for each parts and to estimate analyzed maintenance costs through that system. According to the analysis, the study proposed a partial maintenance costs standard and analyzed proper maintenance costs. The results of this study are as follows 1) The system is divided into 8 large-groups and 24 small-groups for the analysis elemental maintenance costs. 2) The average rations followed by analysis of partial maintenance costs of the three school buildings are as followings, the total maintenance costs are analyzed 3,992 million won and each part of average rations is exterior of building 10.9%, interior of building 41.58%, electricity & fire fighting facility 14.22%, water supply & healthy facility 11.39%, heating & water supply facility 12.93%, landscape 6.3%, civil engineering works 2.69%.

  • PDF