• Title/Summary/Keyword: Finishing works

Search Result 93, Processing Time 0.025 seconds

Schematic Estimation Process for Finishing Work using 3D Geometry-Knowledge Information (3차원 형상·지식정보를 활용한 마감공사 개산견적 프로세스)

  • Park, Sang-Hun;Park, Hyung-Jin;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.210-212
    • /
    • 2013
  • The construction cost estimates during the design phase becomes the standard to judge profitability and validity, and is very important in various decision-makings by project owner. However, since approximate costs are quoted when many parts are undecided in the early stage of project, differences are bound to occur between the construction cost calculated through approximate quotation and that put into construction actually. Also, since in existing quotation works, quantity calculations have been dependent on the staff's manual work, involving error potential, and thus differences are likely in quantity calculation depending on the quotation staff's method of calculation. In this study, the process of creating space model to deduce 3D geometry information for approximate quotation in association with knowledge information and the expression for calculation of finishing area were proposed.

  • PDF

DESIGN MANAGEMENT FOR CONSTRUCTABILITY REVIEW OF HIGH QUALITY EXPOSED CONCRETE

  • Doo Won Hwang;Young woong Song;Yoon ki Choi;Dong Woo Shin;Jae Youl Chun
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1154-1157
    • /
    • 2005
  • This report is to do design management for constructability review of high quality exposed concrete, which is used increasingly in recent. To secure systematic management at design phase, we reviewed each definition and work at each design phase, we define high quality exposed concrete, a part of architectural concrete, as "an exposed concrete which has well ordered joint & is in pursuit of smooth surface." We reviewed requirements and influential factor to obtain High quality finishing surface and compared construction process of high quality exposed concrete with that of other finishing method. Management method at each design phase for constructability review to meet additional works and requirements is presented.

  • PDF

A Study on the Productive Capacity Setting of Women's Jacket (여성 재킷의 생산능력 설정을 위한 연구)

  • Kim, Jin-Sun;Shim, Kyu-Nam;Oh, Soon
    • Fashion & Textile Research Journal
    • /
    • v.13 no.2
    • /
    • pp.269-278
    • /
    • 2011
  • This study aims at setting up productive capacity which can be usefully utilized for work management of apparel manufacturers. So as to achieve this goal, an apparel manufacturing company which has been operated by miniline system in Seoul was selected. Standard time and man-hour were calculated to create the accurate productive capacity by observing and measuring a work flow included cutting, sewing and finishing processes. And the result is as following. The standard time for each process was presented as cutting process 47004.5s, sewing process 671050.5s and finishing process 22426.3s. And 15284.4ms was computed as total procession man-hour per day of the manufacturer which is organized of 16 people. Also, the procession man-hour for each process was revealed as cutting process 396.7ms(2.6%), sewing process 14509.3ms(94.9%) and finishing process 378.5ms(2.5%). +Surplus was found in the productivity for each process included the cutting process(outshell, lining and seam process), the sewing process(preparation and arrangement process) and the finishing process. But, additional man-hour 52436.18ms was required because the productive capacity was calculated as -surplus(-13.9%) in the sewing process(part and assembly process). Therefore, a work schedule was planned based on the previous result. However, loading can be ideal when a capacity and a load become '0'. The object company should find the way to reduce allowance(26.25%) of the sewing process through reconstruction of consciousness and improvement in functions with analyzing works of operators. Also, they need to consider an additional supplement of the personnel.

철골구조물의 SPRAY 내화피복의 내화성능에 관한 실험적 연구

  • 정우택;오창희
    • Fire Science and Engineering
    • /
    • v.3 no.3
    • /
    • pp.3-7
    • /
    • 1989
  • The aim of this study is to provide the basic data of spray setting method for the fireproof covering. For this purpose, the purpose, the behavior of different three kinds method which is the number of thimes, interval, finishing for a required performance. The result of the data analysis shows that it is better to spray setting method at a time and to finish by natural becomes to reduce a period and labor cost for works.

  • PDF

Quality Management of Exposed Concrete at Construction Phase (시공단계 노출 콘크리트 품질관리 방안)

  • Kim, Tae-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.164-165
    • /
    • 2016
  • To express the original texture of the concrete, exposed concrete finishing technique has been applied in many buildings. However, it is likely to cause quality problems after construction is completed. In addition, because of costs and time issues, reconstruction and maintenance works are difficult and ineffective. Therefore, step-by-step proactive quality management based on sufficient consensus among participants(client, designer, contractor) is very importatnt. This study analyzed factors causing low quality exposed concrete and quality contol points applied to 'A' headquarter construction project.

  • PDF

A Study on the Interrelation of Material and Space in Modern Interior Design (현대 실내디자인에 있어 재료와 공간의 상호관계성에 관한 연구)

  • 이상협;김문덕
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2003.05a
    • /
    • pp.187-191
    • /
    • 2003
  • Modern interior design is expanding diversely, with the rapid development of technology and change of era. The basic of interior space that is rapidly changing consists of floor, wall and ceiling, and these are formed by materials, materials for structure or finishing materials. In the modern interior space, materials are utilized to present an atmosphere that meets the trend of the dissolution of post-modernism and the trend of minimalism. Accordingly, in this study, designers who take serious view on the relation of space and material, and the relation focusing on completed works, in modern interior design were investigated. The interrelation of the representation of each material, organic space, minimal space, and the space of Oriental fusion style were investigated through the works of modern interior designers, such as Karim Rashid and Ettore Sottsass.

  • PDF

The Study on Integrated ACS and Lift Car System for Early Beginning of Windows Work in Tall Building Construction (초고층 창호공사 조기착공을 위한 ACS-Lift Car 연계 시스템 기초연구)

  • Lee, Dongyoon;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.72-73
    • /
    • 2014
  • Recently the concurrent construction method of framework and windows work has been applied for early beginning of exterior finishing works in tall building construction. However, the conventional method makes difficulties in auto-climbing of gang-form and climbing work of lift car since the removal of ACS(auto climbing system) should be preceded for operation of lift car up to the top floor. This study propose a concept model of integrated ACS and lift car system to resolve these problems and begin windows works early in tall building construction.

  • PDF

The Success Factors of Scheduling Using the TACT Technique in Wall Type Apartment House Construction (벽식(壁式) 아파트의 택트공정(工程)계획의 성공요인 분석에 관(關)한 연구(硏究))

  • Kim Joon-Ho;Kim Gwang-Hee;Cho Hyung-Keun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.1 s.19
    • /
    • pp.79-86
    • /
    • 2006
  • Recently, the construction companies show lots of interest in reducing the construction duration of apartment housing project in Korea. Therefore, the purpose of this study is to investigate the success factors of scheduling using the TACT technique in wall type apartment house construction for managing the construction schedule effectively. For appling the tact scheduling technique to wall type apartment house construction, the success factors can be summarized as follows : (1) zoning the horizontal and vortical work area properly, (2) preparing the flow chart of finishing works, (3) minimizing the undefined activity like chipping off the concrete wall, (4) reordering the construction activities for keeping up the continuity of works in winter season, (5) dividing the amount of work for minimizing the delay time of any activity, etc.

A Study on the Evaluation for the Improvement of Streetscape through Relationship Analysis between Psychological Consciousness and Physical Elements - Focused on the Gwangbok Street, Busan - (심리적 의식과 물리적 요소의 상관성 분석을 통한 가로경관 개선사업 평가에 관한 연구 - 부산시 광복로를 대상으로 -)

  • Yang, Jae Hyuk;Lee, Kang Hee
    • KIEAE Journal
    • /
    • v.9 no.6
    • /
    • pp.37-44
    • /
    • 2009
  • This study conducted an evaluation of the streetscape improvement project of the Gwangbok Street through analysis of correlations between psychological consciousness and physical elements in the street by comparing selected pictures of streetscape before and after the project. This work has conducted an analysis of Psychological characteristics by semantic differential method and an analysis of physical elements which influence psychological characteristics by regression analysis. According to the results of psychological analysis, the senses of interest, orderliness, esthetic and preference were highly improved in A district and the senses of openess, stability, orderliness were highly improved in B district. The results of analyzing physical elements influencing the improvement of these psychological consciousness in A district elucidated ; 1) the works of improving signboard and elevation of the building affected the whole these psychological consciousness, 2) the work of planting trees, making plant rests in the street improved the senses of orderliness, esthetic, 3) the work of changing finishing materials in the street enhanced the senses of esthetic, preference, 4) the work of adjusting the width between the road and the pavement, the work of improving traffic enhanced the senses of interest, preference. In the meantime in B district, the works of improving signboard and elevation of the building and those of planting trees, making plant rests in the street improved the senses of openess and orderliness. Also the work of improving traffic enhanced the senses of openess, stability and the work of expanding the pavement, that of changing finishing materials in the street improved the senses of openess, stability, orderliness.

Schematic Estimate Framework of Finishing Works based on IFC-BIM Knowledge (IFC-BIM 연계 지식정보기반 마감공사 개산견적 프레임워크)

  • Park, Sang-Hun;Park, Hyung-Jin;Koo, Kyo-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.6
    • /
    • pp.4176-4184
    • /
    • 2015
  • Cost Estimate for alternative in design phase of construction become criterion for profitability and feasibility analysis of projects. Initial design phase performed schematic estimate based on similar data in the past. The quantity take-off according to estimators experience and calculation method are occurred different or missing. IT (Information Technology) technology evolution has been promoting BIM technology in construction. It is changing the paradigm of planning, design, construction and maintenance phase throughout the construction project. A number of studies have been attempted to apply BIM technology in the construction. In this paper, we propose schematic estimation framework linking standard format IFC (Industry Foundation Classes) and estimate related knowledge. As a result, it performs a cost prediction for decision-making in the design phase, and expected to overcome the limitations of previous studies. In addition, it is possible actively coping with changes.