In our country most of transmission lines are double-circuit lines. In these lines, the combining method of increasing conductor height and installation of passive shield-loop to mitigate magnetic field near a transmission line, is a good and feasible method. The basic principle of passive shield loop is that the field from the current induced in the shield loop conductors counteracts the field from the phase conductors. This method applied to domestic transmission lines to meet the magnetic field level, 100, 30, 10 and 4 mG, respectively. In each magnetic field level, the minimum conductor height and passive loop height are presented for the implementation of the practical design.
This paper deals with the device for measuring the time-varying magnetic fields and induced voltages caused by lightning discharges. The two magnetic field measuring systems were designed and made. One consists of the loop-type magnetic field sensor with the active integrator operated by a differential amplifier. The other consists of the loop-type magnetic field sensor and Labview software. The loop-type magnetic field sensor detects the time derivative of the magnetic field being measured, and the signal detected is integrated by the Labview software. As a consequence, from the calibration experiments, the frequency bandwidth of the full measuring system ranges from 400 [Hz] to 1 (MHz) and the response sensitivity are 0.98 (mV/nT) and 22 (mV/nT) for the magnetic field sensor of 2 turns and 6 turns, respectively. Also, the results obtained by the two measuring devices well agreed with each other.
This paper is focused on the measurement and analysis of an atmospheric electric field which is caused by thunderclouds. The electric field due to thunderclouds changes very slowly. For this reason, the extremely low frequency E-field sensor needs to be used for measuring the atmospheric electric field strength. The balloon-carried E-field sensor system with the time constant of 1sec was designed and fabricated. The electric field sensor consists of $100mm{\times}100mm$ copper plate, active integrator, high pass and low pass filters and batteries. The measurements of atmospheric electric fields were made by the balloon-carried E-field sensor and radiosonde, which sends the data back to ground in real time. From the calibration experiments, the response sensitivity of the E-field sensor was 0.154mV/kV/m in the frequency range of less than 1kHz. As a result from the actual experiment of the atmospheric electric field, the electric field signals were observed from the altitude of about 2.5km. Also, as the altitude was increased, the detected electric field wave oscillated with the fluctuation of sensing plate. The proposed method seems suitable for measurements of atmospheric electric fields, because it is inexpensive, simple to use and launch.
시공손상계수는 보강토 옹벽에 사용하는 지오그리드 보강재의 설계 강도 산정에 필요한 중요한 계수로서 실제 조건을 모사한 현장시험을 통해 구하고 있다. 하지만 지오그리드의 시공 중 발생하는 손상은 지오그리드의 재질, 단위면적당 중량, 뒤채움의 시공방법, 뒤채움의 입도에 따라 달라지며 현장시험을 통해 다양한 영향인자를 고려한 시공손상계수값을 도출하는데는 많은 시간과 비용이 소요된다. 본 연구에서는 시공손상에 영향을 미치는 인자들을 분석하고 뒤채움에 포함된 최대입경만을 이용하여 지오그리드 보강재의 시공손상계수를 산정하는 경험적 방법을 제시하였다.
The performance of passive conductor loop (hereinafter 'loop') method which is used to mitigate the magnetic field around overhead power transmission line is dependent on its configuration and installed location, which are affected by installation conditions of the loops such as objective areas and levels of magnetic field mitigation. Thus, because the design problem of loops is difficult and cumbersome by variety of their configuration and complexity of magnetic coupling mechanism, it is need to be formulated as a computer-based optimum problem to determine the most effective and reasonable loop model satisfying the installation conditions. In this paper, the optimum locations of the multi-wired multiple loops including series reactance compensations are searched by using the genetic algorithm (GA) to mitigate effectively the magnetic fields of relatively near points or far points from transmission line at Am height, and the magnetic fields mitigation characteristics of each loop are analyzed in the view of magnitude, direction and phase of cancellation fields by polarized vector concept to identify their adequacy and rationality for the installation objectives.
EHV power cables can take any damage during shipping, transportation, handling, storage and installation. As the damage influences a reliability of the power cable system in the short and long periods, field tests have been required, for installers, to confirm the reliability of an installed system and, for utilities, to make sure the compatibility of an installed system. Of field tests, a HV withstand test for the cable insulation has been performed to check the soundness of the insulation. For EHV XLPE power cables, the test has been done by applying a specified d.c voltage till lately. But as some problems with the d.c test is emphasized and the equipment for the a.c test is improved, the a.c test is considered positively as an after-installation test. This paper describes the recent trends of the a and its recent application in the field.
약계자 영역에서 토크는 자속에 직접적으로 영향을 받는다. 이 영역에서는 자속준위는 회전자 속도에 대하여 반비례로 감소시킨다. 자속이 감소함에 따라 자화인덕턴스는 증가하게 된다. 자회인덕턴스는 전류를 제어하기 위한 접압을 제한한다. 본 노문에서는 약계자 영역에서 q-축전압을 측정함으로써 자화인덕턴스의 변화를 계산하며, 이에 따라 기준 자화전류를 재조정한다. 컴퓨터 시뮬레이션 실험결과를 통하여 제안한 방법을 입증한다. 본 연구에서 제안한 알고리즘은 방적기계등의 적용분야의 가변속 구동시스템에 활용이 기대된다.
This paper presents the electric field for 22.9[kV]/380[V], 2[MVA] mold transformer are analysed using FEM(finite element method). The electric field was calculated for the voltage applied to the transformer. Then, it is analysed that the maximum electric field occurred between high voltage turns. Capacitance is calculated with energy method. Surge impulse test simulation is studied by modeling circuit with capacitance and inductance. This paper obtain the result that is about influence of electric field in distribution mold transformer adopted.
The discharge capacity of vertical drains installed in the field is reduced with time elapsed after installation due to deformation of drains and clogging effect. Discharge capacity of two types of vertical drains was analysed about three years after installation in the subsoil. Discharge capacity of two types of vertical drains were measured by small, middle, and large scale test apparatus. The results indicate that the discharge capacity of vertical drains after three years operation dramatically decreased compare to the initial discharge capacity.
본 논문에서는 침대평판 전극구조를 구성하여 침전극에 직류 정 ·부 고전압을 인가한 경우 전계와 자계가 직각방향으로 형성되도록 하고 자계가 코로나 방전현상에 미치는 영향을 측정하고 분석하였다. 정의 고전압을 인가한 경우 자계인가에 의해 방전코로나 영역이 확장되고 이때 흐르는 코로나전류가 감소하였고, 절연파괴전압은 증가되었다. 그러나 부의 고전압을 인가한 경우는 방전코로나 영역이 오히려 축소되고 흐르는 전류가 증가되었으며 절연파괴전압은 감소되었다. 이는 전자계가 동시에 존재하는 영역에서 코로나방전에 의해 생성된 전하들의 로렌쯔력에 의한 싸이크로트론 운동 때문인 것으로 생각된다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.