Analysis on the Discharge Capacity of Vertical Drains Installed in the Field

현장에 타설된 연직배수재의 통수능력 분석

  • 박영목 (영남대학교 토목공학과) ;
  • 진규남 (한국토지공사 연구개발처) ;
  • 정하익 (한국건설기술연구원 토목연구부) ;
  • 정길수 (한국건설기술연구원 토목연구부)
  • Published : 2000.03.01

Abstract

The discharge capacity of vertical drains installed in the field is reduced with time elapsed after installation due to deformation of drains and clogging effect. Discharge capacity of two types of vertical drains was analysed about three years after installation in the subsoil. Discharge capacity of two types of vertical drains were measured by small, middle, and large scale test apparatus. The results indicate that the discharge capacity of vertical drains after three years operation dramatically decreased compare to the initial discharge capacity.

Keywords