Derivation of Factors for Improvement for Efficient Procurement and Lifting Management of Modular Construction (모듈러 건축공사의 조달 및 양중 효율화를 위한 중점개선 요구사항 도출)

  • Kim, Min Ju;Lee, Dongmin;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.211-212
    • /
    • 2015
  • Procurement and lifting scheduling of modules and resources in modular construction, where modules that are manufactured from factory are delivered and assembled on site, is a crucial factor that determines the efficiency of the whole construction. However, previous studies have barely acknowledged the significance of resource procurement process and lifting of modules in modular construction. Therefore, this research aims to derive factors that are in need of improvement for successful implementation of procurement and lifting efficiency, and visualize them according to their importance and performance on improvement through IPA(Important Performance Analysis).

  • PDF

Simulation analysis of Transporting Fixation Equipment on Unit Module (유닛모듈 운반을 위한 고정장치의 시뮬레이션 분석)

  • Park, Su-Yeul;Kim, Kyoon-Tai;Park, Nam-Cheon;Chae, Myung-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.143-144
    • /
    • 2013
  • Unit module system produce units in the factory and assemble in the field. This unit module system has advantages of shortening the process of construction. However, it is still in the early research related to setting the unit module which is transported by truck to the field. Therefore, when transporting the unit module, this goal of study develops fixed devices. And suggesting device were performed that simulations analyzed maximum stress and assessed the safety.

  • PDF

The Improvement Plan of Design Process by Case Study of Steel Structural Work (현장조사를 통한 철골공사 설계프로세스 개선방안)

  • Bang, Sung-Won;Kim, Jin-Ho;Lim, Nam-Gi
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.2
    • /
    • pp.111-118
    • /
    • 2003
  • Steel frame construction is divided into subsidiary materials with column, beam, girder and bracing. After these are processed in factory for using installing in construction field. These prefabricated furniture is very important in accordance with design drawing about processing and prefabricating. In the case of design process using information transmission in blueprint, omission of material number, processing measure and finishing material, or discordance of each structure drawing and selecting incongruent structural material generated an error in the process of design. These error caused delaying time and increasing cost and increasing safety accident in the steel-structure work operating process. therefore, design process should consider problem of operating process.

Work Time Analysis of Rebar Fabrication Method in Beam Construction. (보 철근공사 조립공법별 작업시간분석)

  • Kim, Ju-Yong;Kim, Min-Ku;Kim, Young-Kil;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.8-9
    • /
    • 2019
  • The rebar work is a labor intensive construction work with a high labor cost ratio. It is difficult to manage the productivity, construction time, and safety of rebar work. The problem of productivity decreased in rebar construction is due to a lack of workers according to the aged workers. Partial prefabrication rebar can be an alternative solution to productivity decreased in rebar work. The characteristic of partial prefabrication method is that time consuming component such as stirrup of beam assemble in factory and others assemble in site. Therefore, in this study, the time required for each rebar assembly method is measured and analyzed to confirm the possibility of productivity improvement.

  • PDF

Development of Simulation Model for Optimization of Modular Construction Transportation Plan (모듈러 건설의 운송계획 최적화를 위한 시뮬레이션 모델 개발)

  • Kim, Hyeonmin;Kwon, Woobin;Ahn, Heejae;Cho, HunHee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.200-201
    • /
    • 2022
  • Off-Site Construction is being widely adopted as an alternative to solve endemic problems in construction industry such as low productivity and efficiency. However, it is strongly recommended to examine the transportation process to be optimized because it determines the size of a modular and influences the cost of the construction. Therefore, in this study simulation model for optimization of modular construction transportation plan was developed using AnyLogic. As a result of the study, the influence of trailer transport capacity and transport time increases as the number of modular which should be transported from factory to site increases.

  • PDF

Derivation of the Construction Process for Precast Concrete System based on Off-Site Construction (OSC(Off-Site Construction)기반 PC공법의 시공 프로세스 도출)

  • Jun, Young-Hun;Bae, Byung-Yun;Yun, Won-Gun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.289-290
    • /
    • 2021
  • The PC system has advantages in terms of project management, such as shortening the construction period and reducing costs. However, it is difficult to activate the technology due to insufficient application of the technology. Therefore, there is a need for a strategy to expand and activate the PC system. This study is a basic research for PC construction project management, and its purpose is to derive the entire construction process from factory production of PC components to on-site construction. In this study, the construction process of the PC system was derived through literature review, and the main matters for the construction process management of PC system were confirmed in the analysis process. In the future, the results of this study are expected to be used as basic data for research for PC project management, such as deriving construction classification and calculating construction periods.

  • PDF

A study on design development and construction application of precast concrete modular house (프리캐스트 콘크리트 모듈러 단독주택 설계 개발 및 시공 적용에 관한 연구)

  • Seo, Dong-Won;Jeon, Sang-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.230-231
    • /
    • 2021
  • In this study, Dr. Bae Kyu-woong of the Korea Institute of Construction Technology developed a concrete module that was lightweighted to 1700kN with KC modules and met housing performance standards. It solves Construction lifts problem that was the limit of the PC module, and is an innovative model that greatly improves Construction period and economics with boxed modules, and is manufactured in the factory by extruded molding in vibration, noise, fireproofing standards, etc., and has the advantage of excellent precision and high strength. Therefore, if the framing house of a precast concretecan only be standardized in construction, its potential for growth will be endless. To do this, standardization, standardization, and modularization of the design are essential.

  • PDF

A Study on the Insulation Performance of Unit Curtain Wall Profile Shape (유닛 커튼월 프로파일 형상에 따른 단열성능에 관한 연구)

  • Jung, Ui-In;Hong, Sang-Hun;Kim, Hae-Na;Park, Jun-Seo;Kim, Bong-Joo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.245-246
    • /
    • 2023
  • The unit curtain wall is an exterior finish currently used on the exterior walls of high-rise buildings. Curtain walls used as non-endurance walls are largely classified into stick curtain walls and unit curtain walls, and their use has recently been on the rise to reduce risks at construction sites through factory manufacturing. Accordingly, this study attempted to examine the insulation performance according to the shape of the unit curtain wall profile through insulation simulation.

  • PDF

A Study on the Structural Performance Review as Design Change to the Unit Curtain Wall Profile (유닛 커튼월 프로파일 형상 변화에 따른 구조 성능 검토에 관한 연구)

  • Jung, Ui-In;Hong, Sang-Hun;Kim, Hae-Na;Park, Jun-Seo;Kim, Bong-Joo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.247-248
    • /
    • 2023
  • The unit curtain wall is an exterior finish currently used on the exterior walls of high-rise buildings. Although the structural impact is not significant due to the non-strength wall, in the case of the unit curtain wall to which the factory manufacturing method is applied, deformation of the profile may occur according to its own weight. Therefore, in this study, stability is evaluated through design standard calculation applied when finishing the outer wall according to the design shape of the unit curtain wall profile.

  • PDF

Development of PLC-based Fieldbus Educational Equipment and Curriculum for building Smart Factory (스마트팩토리 구축을 위한 PLC기반의 필드버스 교육 장비 및 교육과정 개발)

  • Oh, Jae-Jun;Choi, Seong-Joo
    • Journal of Practical Engineering Education
    • /
    • v.9 no.1
    • /
    • pp.49-56
    • /
    • 2017
  • Recently, due to Industry 4.0, there is a great interest in smart factory for productivity improvement and customer satisfaction in manufacturing industry, and construction is also actively pursued by government support. In particular, data integration and fieldbus communication technology to build an efficient production system are essential. Fieldbus is an open control system that is not tied to a specific vendor system and has various advantages such as compatibility with other products, accuracy of data transmission, and remote diagnosis. However, there are no educational equipment for training field buses, training courses and examples for practical training, and there are many limitations in improving the practical skills needed for building smart factories in the industrial field. Therefore, this study develops PLC based fieldbus education equipment and training course based on previous research results that selected PLC and communication technology suitable for domestic industry field for practical fieldbus training and develops the training program of Ethernet IP, Profibus DP, Modbus, CC-Link, and DeviceNet. In addition, it is confirmed that the control and remote diagnosis of distributed field devices are possible by data collection and monitoring.