• Title/Summary/Keyword: External Project

Search Result 353, Processing Time 0.025 seconds

Considering Claim Costs in Project Time-Cost Mixed Integer Programming Model (클레임코스트를 고려한 프로젝트의 시간-비용 혼합정수계획모형)

  • Kim, Jong-Yul;Kang, Chang-Wook;Hwang, In-Keuk
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.3
    • /
    • pp.97-105
    • /
    • 2011
  • Previous researches have focused on the efficiency of project execution and the satisfaction of internal customers In view of the fact that a project is successful if any defects are not found in the short-term performance test of the project final outcome. To execute a project that both internal customer and external customer are satisfied in terms of longer-term benefit perspective, the project claim costs (PCC) which may occur for the warranty period of the project final outcome should be considered. We propose a model included PCC to the linear programming between time and cost to expedite a project and perform the validity test by applying the model to an example project. This model and related procedure will contribute to overall project activities' cost reduction by taking preventive actions for PCC.

A Study on the Reasons of Development Gap in Rural Community Development : The Application of Neo-Endogenous Development (농촌마을 발전 격차의 원인에 대한 연구: 신내생적 발전론의 적용)

  • Kim, Tae-Yeon
    • Korean Journal of Organic Agriculture
    • /
    • v.28 no.1
    • /
    • pp.69-93
    • /
    • 2020
  • The paper is to compare two villages in Songak-myeon, Asan, Cnungnam Province in Korea. It tries to show how the joint village project, which began with the support of the same external organization, produces different results depending on the internal conditions and circumstances of the village. From the end of the 1990s, Pyeongchon-ri and Sugok-ri started developing villages under the influence of the environmentally friendly farming movement. And subsequent supports were provided by local organizations for the development of the village. However, the village project in Sugok-ri, which focused on economic performance, later turned out to be a failure, and the residents changed to pursue activities for their own economic interests individually. On the other hand, In Pyeongchon-ri, the cooperation among villagers was strengthened in implementing support projects by similar external agencies. In addition, community ties and identity have been strengthened as problems have been solved through cooperation among residents in the process of promoting the village project. Nevertheless, projects undertaken in Pyeongchon-ri for the purpose of increasing economic performance was all failed. Through these findings, the paper asserts that the neo-endogenous development approach utilizing external support on the basis of internal cooperative network among villagers must be a very useful method for rural development in contemporary societies.

A Study on the Methodology of Calculating Greenhouse Gas Emission Reduction by HFCs Reduction - Focusing on the Foam Industry - (HFCs 감축에 따른 온실가스 감축량 산정방법론 연구 - 발포산업을 중심으로 -)

  • Choi, Ji Won;Kim, Jung Man;Ahn, Jun Kwan
    • Journal of Climate Change Research
    • /
    • v.9 no.4
    • /
    • pp.399-406
    • /
    • 2018
  • The purpose of this study is to propose a methodology for estimating greenhouse gas emission reduction through HFCs used in the foam industry. This study investigated characteristics of HFCs and greenhouse gas emissions from production processes in the foam industry, which uses HFCs as a blowing agent. Also, we investigated fluorinated gas removal technology to determine a proper technology for the foam industry. And we confirmed the criteria and characteristics of External Project for methodology development. According to criteria of External Project and foam industrial process emission, a methodology for calculating the amount of greenhouse gas emission reduction in foam industry was developed. Lastly, we analyzed the amount of greenhouse gas emission reduction and KOC (Korea Of Offset) in the foam industry based on the domestic government's plan to reduce HCFCs and imported amount of HFCs used as a blowing agent. The results of this study demonstrate that linking greenhouse gas reduction in the foam industry and the domestic greenhouse gas reduction system can contribute to achieve the domestic greenhouse gas reduction goal.

BASIC RESEARCH OF SUB-PACKAGE PROBLEM IN KOREAN CONSTRUCTION INDUSTRY

  • Jinho Shin;Furusaka Shuzo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.635-641
    • /
    • 2009
  • In the building construction, the specialist contractors play the important roles in the point of the quality securing. Therefore, it is very important for the construction industry to study the sub-package problem. The sub-package problem includes two problems which should be solved. One is to decide the scope of works of each specialist contractor, and another one is to decide the particular specialist contractor which carries out the work. However, the sub-package problem in Korea is not clarified yet, although the circumstance around it has changed rapidly. Many factors influence to the sub-package problem regardless of internal factors or external factors of the project. The general contractor usually decides the sub-package under considering the project conditions. In case of the internal factors, each general contractor manages the organization and materials. But the external factors are relatively more difficult to control and predict than internal ones. But out of the external factors, the legal system has very close relationship with a sub-package problem especially in Korean construction system. So, this paper clarifies relationship between the legal system relating subcontracting and the state of sub-package.

  • PDF

Deduction of Change Management Factors and Weight Estimation based on ANP in Urban Renewal Project (ANP 기반 도시환경정비사업의 변화관리 요인 도출 및 중요도 산정)

  • Shin, Seung-Yoon;Son, Myung-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.176-186
    • /
    • 2013
  • For urban renewal projects progressing in large scale, it carries a characteristic that frequently changes the environment, subject, law, plan and the like by a demand from various participants and internal/external factors. As such large-scale urban renewal projects have a lot of possibilities of change, it requires setting a plan to recognize the possible variable factors by each project operation stage and to manage it systematically by defining the variable factors on the basis of working process of the entire project. Therefore this research has produced a factor of main variable management based on working process for systematic variable management on the projects that inherent various possibilities of change as urban environment refurbishment projects. And it also suggests the status of main variable factors characterized by project operation stages quantitatively through reflecting external and internal features for variable factors produced from utilizing ANP methodology.

A Study on the Effect of Project Sponsor Roles and Project Manager Competencies on the Project Performance Quality (프로젝트 스폰서 역할과 프로젝트 관리자 역량이 프로젝트 성과 품질에 미치는 영향에 관한 연구)

  • Yun, Gunsang;Yoo, Wangjin;Lee, Joonghwan
    • Journal of Korean Society for Quality Management
    • /
    • v.42 no.3
    • /
    • pp.373-386
    • /
    • 2014
  • Purpose: This paper seeks to analyze the relationship between project sponsor roles and project manager competencies which may account for project performance quality. Methods: After an extensive literature review, the structural equation modeling was conducted test the research model. The data was collected from project manager training course attendees by the questionnaire. Results: The results of structural equation modeling show that project sponsor roles effect on project manager competencies. Project manager competencies have a positive effect on project performance quality. Conclusion: The authors demonstrate that project sponsor external roles are related positively to project performance quality. And project manager professionalism has a positive effect on project manager communication. A number of significant findings are reported including the empirical verification that project sponsor roles, and project manager competencies may all be directly related to project performance quality.

Minimizing Project Quality Costs by Activity-Based Prevention (활동기준예방에 의한 프로젝트 품질코스트 최소화)

  • Kim, Jong-Yul;Kang, Chang-Wook;Hwang, In-Keuk
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.4
    • /
    • pp.89-97
    • /
    • 2011
  • Traditional quality control for manufacturing or service sector is not suitable for the quality control of a project as the project is one-time task constrained by time, cost, and quality. To meet the internal and external customers' requirements, quality costs approach to the project will be effective. Hence, we propose PONC (price of nonconformance) estimation procedure and a mathematical model, which are focused on activity-based prevention in the execution step and warranty step of EPLC (extended project life cycle). This procedure and model will help project manager develop preventive action plan for project quality costs minimization from nonconformance risk activities and PONC estimates information.

A Study on the Project Evaluation Indicators for the Efficient Integrated Rural Development in Block Grants System (포괄보조금제도하에서 효율적인 농어촌지역개발을 위한 사업평가지표 연구)

  • Lee, Joo-Yong;Kim, Sun-Joo
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.53 no.1
    • /
    • pp.57-62
    • /
    • 2011
  • Block Grants System to the agriculture sector has been started from 2010. This paper has been studied for the effective Integrated Rural Development under Block Grants System. For this, project evaluation items and indicators (PEI) were studied by internal and external example and specialist questionnaire on project evaluation. As the result of study, necessity of project, faith of project, efficiency of project, utilization of resources and operating capability were established in planning step, and most important PEI was established the necessity of project. And in enforcement step, performance result, monitering, capability, achievement and maintenance were established, and most important PEI was established performance results. Finally, monitering, capability, achievement and maintenance were established in completion step.

INTEGRATED PERFORMANCE MANAGEMENT FOR WHOLE PHASES OF URBAN RENEWAL MEGAPROJECTS

  • Heedae Park;Kang-Wook Lee;Seung Heon Han
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1463-1467
    • /
    • 2009
  • Construction projects are vulnerable to diverse internal and external factors, requiring systematic and consistent performance management along the entire life cycle of a project. In particular, urban renewal projects have a range of performance measures, including policy reconciliation and permits, project development, project financing, design, construction, and occupancy and maintenance. This requires a program-level megaproject approach, which integrates each stage of a project as well as variety of stakeholders' interests in pursuing a project from different perspectives. However, previous research on performance management has focused especially on the limited scopes of factors, including cost, quality, and schedule at the project level or on financial factors at the firm level. Given the lack of current approaches, this study suggests an integrated and systematic performance management scheme to control urban renewal megaprojects at the broadened perspectives of the program level. To this end, this study adopts the balanced scorecard approach and elicits key performance indices associated with various project configurations. Finally, an algorithm is presented for quantitatively assessing the level of performances along whole life cycle of urban renewal megaprojects.

  • PDF

Development of a model to forecast the external migration rate in development projects reflecting city characteristics

  • Kim, Ki-Bum;Park, Joon;Seo, Jee-Won;Yu, Young-Jun;Hyun, In-Hwan;Koo, Ja-Yong
    • Environmental Engineering Research
    • /
    • v.23 no.4
    • /
    • pp.406-419
    • /
    • 2018
  • In planning public service systems such as waterworks, the design population is very important factor. Owing to the limitations of the indirect method, two new models, which take into consideration urban characteristics, were developed to accurately predict external migration rate (EMR), which is an essential component in estimating reliably the design population. The root mean square error (RMSE) between the model values and observed values were 10.12 and 15.58 for the metropolitan cities and counties respectively and were lower compared to RMSE values of 27.31 and 28.79 obtained by the indirect method. Thus, the developed models provide a more accurate estimate of EMR than the indirect method. In addition, the major influencing factors for external migration in counties were development type, ageing index, number of businesses. On the other hand, the major influencing migration factors for cities were project scale, distance to city center, manufacturing size, population growth rate and residential environment. Future medium and long-term studies would be done to identify emerging trends to appropriately inform policy making.