Experimental and numerical study on performance of long-short combined retaining piles

  • Xu, Chang J.;Ding, Hai B.;Luo, Wen J.;Tong, Li H.;Chen, Qing S.;Deng, Jian L.
    • Geomechanics and Engineering
    • /
    • v.20 no.3
    • /
    • pp.255-265
    • /
    • 2020
  • Laboratory tests are conducted to investigate the performance of retaining system with different combinations of long-short piles. Numerical analysis implemented using ABAQUS are verified by comparing numerical results with measured data. By performing numerical studies, the horizontal displacement of piles, heave of excavation bottom and bending moment of pile for various pile system with different pile lengths are investigated. Results show that long piles share higher bending moments than short piles. The increase in the number of short piles leads to a slight increase in the heave at excavation bottom for long-short pile retaining system. Retaining system with different long and short pile combinations have greater effects on the horizontal displacement of pile above the excavation bottom, compared to its counterparts below excavation bottom. For a given length of long pile, the bending moment and displacement of piles increase with the decrease in length of short piles, while the increasing rate of maximum moment of retaining pile system is insignificant. Results highlight that a reliable and economical pile retaining system can be designed by optimizing the number and length of short piles, provided that the working performance of retaining structures above excavation bottom meets the design requirement in practice.

A Study on the Compression of Construction Period by the Improvement of Trench Excavation for Slurry Wall Method (지하연속벽 시공 시 트렌치 굴착방법 개선을 통한 공기단축에 관한 연구: 현장적용사례를 중심으로)

  • Lee, Young Soo;Park, Hyung-Keun;Kang, Kyubyung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.5D
    • /
    • pp.499-505
    • /
    • 2012
  • As the excavation depths during excavation works in urban sites are getting deeper and bigger, It is necessary to study for the improvements to solve the problems in the excavation processes. This research deals with the excavation method that can not only minimize the effect on the surrounding constructions, but also shorten the construction period of the excavation work. For this research, there have been an extensive literature review of the bibliographic data about Slurry Wall Method, which is recognized around the world, and the analysis of the major problems in the existing ineffective construction step. These efforts led to the technical improvements. Accordingly, a new construction method applied with the new technical factors has been suggested, and it was possible to compare Slurry Wall Method with the construction method and analyze them on the base of the examples using the suggested method. This new method decreased the excavation period by 15 days. It took only 33days to finish the excavation work, as compared to 48 days that can be seen on the pre-modification schedule. Furthermore, the suggested method in this research is safer, more economically feasible, and better for the environment than Slurry Wall Method. It will contribute to shortening the construction period of Slurry Wall Method in the end.

A study on the lateral Earth Pressure and Stress Relaxation Region According to the Infinitesimal Deformation of the Wall and Backside Earth Built by Non-excavation Method Under Railroad (철도하부 비개착공법의 벽면배면토사의 미소변형에 따른 수평토압 및 응력이완영역에 관한 연구)

  • Park, Yoon-Sik;Lee, Jun-Seok;Cho, Kook-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2393-2399
    • /
    • 2011
  • In the case where the bottom of railroad is penetrated by non-excavation construction method, the design is performed based on the assumption that there is no displacement and no change of stress However, measurement data showed that reduction of earth pressure and relaxation of stress take place by the displacement. In this study, we investigated the earth pressure on the structure under the railroad constructed by a non-excavation method and the stress relaxation region. The design based on earth pressure is non-economical because it is an over design. Relaxation of stress may lead to road base settlement and rail irregularly due to the reduced railroad supporting stiffness, to ballast crack in the case of concrete roadbed. The result showed that it is reasonable to set the stress on the structures as active earth pressure not as earth pressure at rest. Additionally, the study on the stress relaxation region identified the regions that should be supported in future construction by a non-excavation method.

  • PDF

Comparison of Field Monitoring System in case of Automatic and Manual Type Executed in Urban Deep Excavation Site (도심지 대규모 굴착공사에서 수행된 자동계측과 수동계측의 비교 사례)

  • Kim, Tae-Seob;Chung, Won-Hong;Kim, Hyun-Mo;Kim, Woong-Kyu;Jung, Chang-Won
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.1216-1223
    • /
    • 2008
  • Displacement control of earth retaining wall is recognized as the most important item for insuring the stability of ground in urban deep excavation site near by major structure such as subway etc. The field monitoring system is classified by two types as manual system and automatic system. The application case of latter type of field monitoring is increased because real time measurement is possible in automatic system and that is correspondent with the recent constructional trend. Though the automatic monitoring system is more useful and advanced than manual monitoring system, accuracy of the system is not verified sufficiently. It was examined that the reliance of automatic monitoring system in this paper through the comparison of monitoring result obtained three urban excavation site in which the each type of monitoring system was executed concurrently. Result of the examination is that the two types of monitoring system is generally alike in view of monitoring result, so the engineering reliance of automatic system was confirmed in case site. This task was researched in restricted case site, it is expected more precise analysis from security of more data monitored and progressive study.

  • PDF

Case Study of Self-Supported Diaphragm Wall Method Using Counterfort Technique (부벽식 기법을 사용한 자립식 지하연속벽 공법의 사례 연구)

  • Jeong, Gyeong-Hwan;Park, Hun-Kook;Shin, Min-Sik;Han, Kyoung-Tae;Ryu, Ji-Young
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.276-285
    • /
    • 2006
  • Application of anchored or strutted wall system for the earth retention of excavation works in a populated urban area or a poor soil deposit can be limited due to various restrictions. Since the strut becomes longer in a wide excavation site, the stability of an earth retaining wall is decreased, the wall deformation is increased, and the ground settlement is also increased due to an increased buckling or bending deformation of struts. Especially, in a populated urban area, the installation of anchors can be problematic due to the property line of adjacent structures or facilities. Thus, a new concept of earth retaining system like Self-Supported diaphragm Wall can solve several problems expected to occur during excavation in the urban area. In this study, Numerical analyses of counterfort diaphragm wall was introduced and the monitored data from the site was compared with the original results of numerical analyses. Also, in the case of the deep excavation applied the counterfort diaphragm wall, numerical analyses was performed to predict the wall deformation and the reinforcement to reduce the wall deformation was suggested.

  • PDF

Case Study of Earth Anchor Axial Force Change Characteristic through Monitoring during Construction Period (시공중 계측을 통한 어스앵커 축력변화 특성사례 연구)

  • Kim, Sung-Wook;Han, Byung-Won
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.285-292
    • /
    • 2004
  • Earth Anchor method as a supporting system is widely used in the large scale deep excavation of urban areas or slope excavation project. Considering the application frequency of that method and catastrophe of that method under unproper construction management, we can find out many problems relevant to the domestic design and construction management of earth anchor method. When we encounter the cases of rapid increments and various decrements in earth anchor axial forces, considering the characteristic of earth anchor method, it is an essential point to catch the reasons and to prepare countermeasures. This article introduces two actual monitoring examples based on the close analyses of measured data in a typical large scale deep excavation project and slope excavation project. One is a rapidly increasing case of earth anchor axial forces with the continuous advance of incremental deformation in a geological layer interface. And another is a decreasing case of earth anchor axial forces with the construction conditions. The effort of this article aims to improve and develop the technique of design and construction in the coming projects having similar ground condition and supporting method.

  • PDF

Singapore Case Study of Self-Supported Diaphragm Wall Method Using Counterfort Technique (부벽식 기법을 사용한 자립식 지하연속벽 공법의 싱가폴사례)

  • Jeong, Gyeong-Hwan;Park, Hun-Kook;Shin, Min-Sik;Han, Kyoung-Tae;Ryu, Ji-Young
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.605-613
    • /
    • 2008
  • Application of anchored or strutted wall system for the earth retention of excavation works in a populated urban area or a poor soil deposit can be limited due to various restrictions. Since the strut becomes longer in a wide excavation site, the stability of an earth retaining wall is decreased, the wall deformation is increased, and the ground settlement is also increased due to an increased buckling or bending deformation of struts. Especially, in a populated urban area, the installation of anchors can be problematic due to the property line of adjacent structures or facilities. Thus, a new concept of earth retaining system like Self-Supported diaphragm Wall can solve several problems expected to occur during excavation in the urban area. Application of self-supported counterfort diaphragm wall was verified in this paper though comparing the design of self-supported counterfort diaphragm wall with the data monitored during excavation in Singapore.

  • PDF

A Case Study on the Field Monitoring of the Deep Rock Excavation Site in Urban Area on Severe Unbalanced Pressure Condition (편토압이 심한 도심지 대심도 암반굴착공사에서의 계측사례)

  • Kim, Tae-Seob;Kim, Woong-Kyu;Jung, Chang-Won;Han, Chul-Hee
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.1259-1267
    • /
    • 2008
  • One of the most important item for insuring the stability of ground in urban deep excavation site near by major structure such as subway is displacement control of earth retaining wall. The field monitoring system is classified by two types as manual system and automatic system. The application case of latter type of field monitoring is increased because real time measurement is possible in automatic system and that is correspondent with the recent constructional trend. Though the automatic monitoring system is more useful and advanced than manual monitoring system, accuracy of the system is not verified sufficiently. It was examined that the reliance of automatic monitoring system in this paper through the comparison of monitoring result obtained one of deep urban excavation site in which the each type of monitoring system was executed concurrently. Result of the examination is that the two types of monitoring system is generally alike in view of monitoring result, so the engineering reliance of automatic system was confirmed in case site. This study was researched in restricted one case site, so it is expected more precise analysis from security of more data monitored and progressive study.

  • PDF

Analysis and Countermeasures for the Trouble Factors of the Spot Installation Pile Using Machine Excavation Method (기계굴착공법을 적용한 현장타설말뚝 시공시 부조화 발생요인 분석 및 대응 방안)

  • Park, Hong-Tae;Son, Chang-Baek
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.4
    • /
    • pp.75-83
    • /
    • 2009
  • Although a range of machine excavation methods are in wide use, including casing, earth drill and reverse circulation drilling, deterioration in pile quality and faulty construction can be often found these days because of trouble in the construction field. For this study, research was conducted in the form of a survey of construction engineers working in the field in order to identify the types and the causes of trouble by focusing on all casing, earth drilling and reverse circulation drilling. By analyzing the causes of trouble, countermeasures could be presented. The data and the analysts presented in this study could be effectively used for minimizing trouble in future machine excavation work during construction.