• 제목/요약/키워드: Estimation of Productivity

검색결과 327건 처리시간 0.026초

공기지연요소분석을 이용한 회귀분석 기반 초고층 내부공사의 생산성 예측 (Regression Technique-based Productivity Estimation conducting Construction Delay Factor Analysis on Interior Works in High-rise Building Construction)

  • 김현미;김태형;신영근;김영석;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 1부
    • /
    • pp.191-192
    • /
    • 2011
  • The construction projects contain a lot of variables and risk affecting productivity. The duration of the project must be recognized important as for quality, unit cost and safety. There is need for improving work efficiency by investigating relationship of works to prevent delay. This study focuses on analysing the delay factors of steel staircase system to suggest regression model that enables construction productivity estimation. The position of the observers and construction delay factors were expressed by the independent variable of the regression model and productivity was expressed by a dependent variable. This paper suggests quantitative productivity and it is expected that will be helpful estimating application in construction new technologies.

  • PDF

Human Pose-based Labor Productivity Measurement Model

  • Lee, Byoungmin;Yoon, Sebeen;Jo, Soun;Kim, Taehoon;Ock, Jongho
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.839-846
    • /
    • 2022
  • Traditionally, the construction industry has shown low labor productivity and productivity growth. To improve labor productivity, it must first be accurately measured. The existing method uses work-sampling techniques through observation of workers' activities at certain time intervals on site. However, a disadvantage of this method is that the results may differ depending on the observer's judgment and may be inaccurate in the case of a large number of missed scenarios. Therefore, this study proposes a model to automate labor productivity measurement by monitoring workers' actions using a deep learning-based pose estimation method. The results are expected to contribute to productivity improvement on construction sites.

  • PDF

Effects of Technology and Innovation Management and Total Factor Productivity on the Economic Growth of China

  • LEE, Jung Wan;XUAN, Ye
    • The Journal of Asian Finance, Economics and Business
    • /
    • 제6권2호
    • /
    • pp.63-73
    • /
    • 2019
  • The paper aims to investigate relationships between technology and innovation management, total factor productivity and economic growth in China. By comparing the trends in total factor productivity growth of industrialized economies (i.e. OECD), this study intends to showcase the importance of total factor productivity progress in the Chinese economy. The study employs time series data of an annual basis for the period from 1977 to 2016 retrieved from the World Development Indicator. The study employs unit root test, cointegration test, fully modified least squares estimation method, canonical cointegrating regression and dynamic least squares estimation method to test the hypotheses. The results of the cointegrating regression analysis show that manufacturing growth leads to an increase of total factor productivity in the short-run in China. The findings of the study suggest that manufacturing (i.e. technology and product innovation) is positively related to the increase of total factor productivity in the short-run and total output growth in the long-run. The findings suggest that promoting technology and innovation management and supporting R&D subsidies may reduce the marginal cost of conducting R&D and increase the rate of technology and innovation management and R&D activity and therefore, the total factor productivity growth rate.

생산성 분석을 통한 철근콘크리트공사의 Cost Data Prototype 개발 (Development of Cost Data Prototype in Reinforced Concrete work based on Productivity Analysis)

  • 안수배;지성민;현창택
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.135-136
    • /
    • 2011
  • A standard of estimation is used as a basis for estimating the predetermined amount of public construction. However, they raise several points of reasonable labor to be presented to a standard of estimation. For this reason, it is difficult to make a reasonable and efficient estimation of the costs, and this situation presents an urgent need for an accurate way of making such a calculation.This study analyzed the productivity of reinforced concrete work by the CYCLONE model, and the estimated optimal labor through sensitivity analysis, and presented the model on the number of optimal labor through sensitivity analysis.

  • PDF

철골 공장가공의 생산성 및 공장간접비율 실태분석 (Analysis of the Productivity and Indirect Cost Rates Estimation in the Steel Plant)

  • 김경원;안방률;태용호;허영기
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.333-336
    • /
    • 2012
  • In modern Construction Industry, as accumulation of capital and improvement of technology skills, buildings are becoming higher and more enormous, also the portion of steel works has been increasing. In addition, it is necessary to predict the optimum level of construction cost in a reasonable way. The composition of construction is direct construction cost, indirect construction cost and so on. However, it is not enough to study about indirect construction cost rather than direct construction cost. In this study, the state of productivity and indirect construction cost are analyzed in the steel production. As a result, the productivity and ratio of indirect cost in steel plant by inserted per 1ton are suggested.

  • PDF

시멘트 액체방수 공사의 작업조 기반 품셈을 위한 생산량 및 노무량 분석 (Analysis of Actual Labor and Productivity for Based Work Crew Standard of Cement Liquid Watertight Construction)

  • 하기주;최민권;이동렬;하민수;하재훈;김외곤
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.171-174
    • /
    • 2009
  • The standard estimation system, used to estimate the predetermined cost of construction work, is measured by the standard and typical construction methods and field conditions. And the standard estimation system is applied to basic data for the measuring of construction cost, such as the consumed quantity of material, labor hours, and machinery cost. However it does not reflect sufficiently for the diversity and reality of constructions work Therefore, this study is recognized the necessity of new cost estimation models for the rational construction cost estimation. To improve estimation technique and construction ability, it was analyzed labor hours, production volume based on the work crew in construction work.

  • PDF

생산성 기반의 소프트웨어 유지보수 대가산정 모델 (A Model for Software Maintenance Cost Estimation based on Productivity)

  • 배준수
    • 산업공학
    • /
    • 제17권spc호
    • /
    • pp.122-130
    • /
    • 2004
  • Since the cost of software maintenance occupies about 50~75% in a general successful organization, the software maintenance plays an important role in software life cycle. In particular, if the managed system needs to be operated in a long term or the system is very large and complex, then the maintenance is especially more important. Software maintenance is defined as software modification activities after customer delivery, such as improvement of performance or functionality, error correction, adaptation to environmental changes, etc. In this paper, software cost estimation models are proposed, that is based on productivity of manpower in maintenance projects. In order to do this, the activities of maintenance are classified into function change, non-function change, user support and application operation. The proposed models are constructed and verified based on the real size and cost information of projects in the real world. The approach in this paper is to discriminate the heterogeneous activities in maintenance projects, and then to calculate the respective cost of each discriminated activity. By using the proposed models, the total cost of maintenance project is summed from the costs of four activities. In addition the number of conflicts between owner and order receiver about the amount of cost will be reduced and the reasonable cost estimation system will be established.

가모만에서의 기초생산력 향상방안에 관한 생태계모델링 (The ecosystem modelling for enhancement of primary productivity in Kamak Bay)

  • 이대인;조은일;박청길
    • 한국환경과학회지
    • /
    • 제8권5호
    • /
    • pp.575-586
    • /
    • 1999
  • From the environmental aspects, primary productivity of phytoplankton plays the most improtant role in enhancement of marine culture oyster production. This study may be divided into two branches; one is estimation of maximum oyster meat production per unit facility(Carrying Capacity) under the present enviromental conditions in Kamak Bay, the other is improvement of carrying from increase of primary productivity by changing the environmental conditions that cause not ot form an unfavorable environment such as the formation of oxygen deficient water mass using the eco-hydrodynamic model. By simulation of three-dimensional hydrdynamic model and ecosystem model, the comparison between observed and computed data showed good agreement. The results of sensitivity analysis showed that phytoplankton maximum growth rate was the most important parameter for phytoplankton and dissolved oxygen. The estimation of mean primary productivity of Wonpo, Kamak, Pyongsa, and Kunnae culture grounds in Kamak Bay during culturing period were 3.73gC/$m^2$/d, 2.12gC/$m^2$/d, 1.98gC/$m^2$/d, and 1.26gC/$m^2$/d, respectively. Under condition not ot form the oxygen deficient water mass, four times increasing of pollutants loading as much as the present loading from river increased mean primary productivity of whole culture grounds to 4.02gC/$m^2$/d. Sediment N, P fluxes that allowed for 35% increasing from the present conditions increased mean primary productivity of whole culture grounds to 3.65gC/$m^2$/d. Finally, ten times increasing of boundary loadings from the present conditions increased mean primary productivity of whole culture grounds to 3.95gC/$m^2$/d. The maximum oyster meat production per year and that of unit facility in actual oyster culture grounds under the present conditions were 6,929ton and 0.93ton, respectively. This 0.93ton/unit facility is considered to be the carrying capacity in study area, and if the primary productivity is increased by changing the environmental conditions, oyster production can be increased.

  • PDF

MULTIPLE LINEAR REGRESSION APPROACH FOR PRODUCTIVITY ESTIMATION OF BULLDOZERS

  • Abbas Rashidi;Hoda Rashidi Nejad;Amir H. Behzadan
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1140-1147
    • /
    • 2009
  • Productivity measurement of construction machinery is a significant issue faced by many contractors especially those involved in earthwork projects. Traditionally, equipment production rate has been estimated using data available in manufacturers' catalogues, results of previous construction projects, or personal experience and assessments of the site personnel. Actual production rates obtained after the completion of a project demonstrate the fact that most of these methods fail to provide accurate results and as a direct consequence, may lead to unrealistic project cost estimations prepared by the contractors. What makes this more critical is that in most cases, inadequate cost estimations lead the entire project to exceed the initial budget or fall behind the schedule. In this paper, a linear regression method to estimate bulldozer productivity is introduced. This method has been developed using SPSS-16 software package. The presented method is used to estimate the productivity of Komatsu D-155A1 series which is commonly used in many earthmoving operations in Iran. The data required for the numerical analysis has been collected from actual site observation and productivity measurement of 60 pieces of D-155A1 series currently being used in several earthmoving projects in Iran. Comparative analysis of the output data of the presented regression method and the existing productivity tables provided by the manufacturer shows that when compared to the actual productivity data collected on the jobsite, a significant increase in accuracy and a remarkable reduction of data variance can be achieved by using the presented regression method.

  • PDF

거푸집 공사의 생산성 분석을 통한 작업조 기반의 Cost Data Prototype 개발에 관한 연구 (Development of Cost Data Prototype based on Production Crew by Productivity Analysis of Form Work)

  • 강동완;지성민;현창택
    • 한국건설관리학회논문집
    • /
    • 제13권1호
    • /
    • pp.44-52
    • /
    • 2012
  • 합리적인 방법에 의해 결정된 건설 공사비를 포함하여 계약을 체결하는 것은 공공 건설공사의 사업비 관리 측면에서 매우 중요하다. 국내에서는 건설 공사비를 산정하는 기준으로 표준품셈이 사용되고 있지만, 표준품셈에서 제시하는 품의 적정성에 대해서 문제가 제기되고 있으며, 현장의 자원 투입량과 품셈에서 제시하는 자원 투입량의 차이로 합리적이고 효율적인 공사비를 산정하는데 어려움이 있다. 본 연구에서는 건설 공사비를 합리적으로 산정하기 위하여, 공동주택 거푸집 공사의 생산성 분석을 통한 작업조 기반의 Cost Data Prototype을 제시하였다. 특히, CYCLONE 모델은 민감도 분석을 통해 최적의 작업인원을 제시하는 모델이므로, 거푸집 공사의 다양한 작업공간과 작업인원을 대상으로 생산성을 분석할 수 있는 도구로 활용이 가능하다. 그리고 개발된 회귀식은 거푸집 공사의 작업인원을 독립변수로 하여, 필요한 작업량을 종속변수로 예측하는데 활용이 가능할 것이다.