• 제목/요약/키워드: Electronic power meter

검색결과 60건 처리시간 0.024초

전자식 전력량계용 한전 프로토콜 및 운영 프로그램 개발 (Develpoment of Automatic Meter Reading Program for Electronic Power Meter)

  • 유인협;장문종;현덕화
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 하계학술대회 논문집 D
    • /
    • pp.2219-2221
    • /
    • 2001
  • A communication protocol for automatic meter reading is designed for electronic power meter. Communicational functions and data structures are standardized and data reading software is developed according to the developed protocol. The communication protocol is designed with reference specifications, IEC 62056-31 and Distributed Network Protocol(DNP). For design, communicational functions and specifications of the industrial meters were analyzed for the purpose of developing a new one for KEPCO meters. The protocol is designed with 3 layer model, physical layers, data link layer and application layer. A documentation was completed with data gathering, data classification, authentication, error detection. An emulator system was made for testing the protocol. A meter reading software was developed using the protocol. Many different protocols and meter reading softwares are integrated into one with the developed protocol and software as KEPCO's standard.

  • PDF

전자식 전력량계와 무선모듈을 이용한 전력품질 표시 및 모니터링 (Power Quality Monitoring with Electronic Watt-hour meter and Wireless communication module)

  • 정득일;손영대
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 추계학술대회 논문집 전기기기 및 에너지변환시스템부문
    • /
    • pp.172-174
    • /
    • 2007
  • An electronic watt-hour meter with high-precision measurement technology can provide many valuable metering data of a real-time system measurements, such as per-phase voltage, ampere, active power, reactive power, apparent power, power factor, and system frequency. Also many of accumulated metering data such as active energy, reactive energy, apparent energy, and load profile can be gettable from an electronic watt-hour meter[1]. This paper presents an approach of the small-sized AMR (Automatic Meter Reading) that provides customers with a very valuable electrical service. This AMR service transmits lots of a valuable metering data by using ZigBee communication module, so that users resided in their premises can use the information to audit a power quality and improve their electrical conditions by using the PQ monitoring device equipped with ZigBee receiver. This PQ monitoring device shows metering data on LCD and transmits to the PC through an internal network. Also, the device can keep the valuable meter data into a built-in non-volatile memory. The final goal of this paper is to better understand the power quality of electrical systems and offer the power qualify information for the convenience of all power consumers.

  • PDF

전자식 계기 IEC 61000-4-6 EMS 시험표준 적용 타당성 연구 (A Study About the Application Feasibility of EMS IEC 61000-4-6 Test Standard on Electronic Power Meter)

  • 김석곤;박창호;신동열;송태승;최용성
    • 전기학회논문지
    • /
    • 제60권6호
    • /
    • pp.1261-1267
    • /
    • 2011
  • Electricity meters using in Korea are about 1.8 million units. From among these, electronic meters for high voltage, about 170 thousand units were installed to the digital type meter and ones for low voltage installed hundreds of thou-sands of meters through a model project. Recently, low voltage meter are expected to complete the installation within several years. Domestic power metering technology is being beyond a simple framework with an electronic type and is rapidly evolving to intelligent smart metering systems in conjunction with promotion of a national smart grid project. Accordingly, it is important to ensure an immunity of meter for electromagnetic field and environmental noise at the installation site. In this paper, we are going to check the validity of international standard that focusing on RF electromagnetic field immunity of meter to secure the quality and improve the reliability in field operation of meter. And we will verify the validity of test specification focused on actual installation environment and are going to offer the improvement plan of test standard.

한국형 스마트 전력량계 부가서비스 적용방안 연구 (A Study of an Application Scheme for Smart Meter and Value Added Services Based on Korean Environment)

  • 김석곤;이한별;이영주;최용성
    • 전기학회논문지P
    • /
    • 제59권1호
    • /
    • pp.106-111
    • /
    • 2010
  • Electronic watt hour meters(WHM) for high pressure running in domestic were installed to the digital type meter and ones for low pressure are expected to complete within several years. Domestic power metering technology is being beyond a simple framework with an electronic type and is rapidly evolving to intelligent smart metering systems in conjunction with promotion of a national smart grid project. Major policy outlook of the world's major power company regarding Intelligent metering is the application of the fare structure diversification and is the improvement of level of service to customers. In addition, electric power companies should focus on the cost reduction and the improvement of management efficiency through an efficient operation of distribution facility. In this paper, we are about to make an observation of the additional services technology development trend of the overseas smart meter and to have a view of value-added services(VAS) system of smart meter suitable for the domestic environment based on the technology development of VAS utilizing electronic watt hour meter performed by recent research projects.

Programmable IC를 이용한 다기능 전자식 단상 전력량계 기능 구현 (Implementation of S1n91e-Phase SAMRT Meter using Programmable IC)

  • 박종범;윤기갑;우상목;박인권;김홍;김정수
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2000년도 추계학술대회 논문집 학회본부 D
    • /
    • pp.644-646
    • /
    • 2000
  • According to the deregulations of governments in the world. the power industries of United State and European nations are proceeding remote meter reading and remote load control. But the core technology of multifunctional electronic meter implemented by programmable one-chip IC, which can be the right answer of all the power industy's efforts is now still under development in the advanced countries. Implementation of smallest size, lowest price single-phase meter with features which enable distribution automation such as bidirectional communication, Remote load control, remote meter reading, remote credit assigment. Prepayment billing system.

  • PDF

Lightweight CNN based Meter Digit Recognition

  • Sharma, Akshay Kumar;Kim, Kyung Ki
    • 센서학회지
    • /
    • 제30권1호
    • /
    • pp.15-19
    • /
    • 2021
  • Image processing is one of the major techniques that are used for computer vision. Nowadays, researchers are using machine learning and deep learning for the aforementioned task. In recent years, digit recognition tasks, i.e., automatic meter recognition approach using electric or water meters, have been studied several times. However, two major issues arise when we talk about previous studies: first, the use of the deep learning technique, which includes a large number of parameters that increase the computational cost and consume more power; and second, recent studies are limited to the detection of digits and not storing or providing detected digits to a database or mobile applications. This paper proposes a system that can detect the digital number of meter readings using a lightweight deep neural network (DNN) for low power consumption and send those digits to an Android mobile application in real-time to store them and make life easy. The proposed lightweight DNN is computationally inexpensive and exhibits accuracy similar to those of conventional DNNs.

가변 콘덴서를 이용한 디지털 수도미터의 설계 및 제작 (Design and Fabrication of Digital Water Meter Using a Variable Capacitor)

  • 박근형
    • 한국전기전자재료학회논문지
    • /
    • 제29권3호
    • /
    • pp.141-146
    • /
    • 2016
  • The AMR(automatic meter reading) system has been increasingly and widely used for its efficient and intelligent management, which is a technology that automatically collects consumption data from a water meter or energy metering device. The digital meter instead of the mechanical meter should be used in the system. Up to now, various types of sensor to measure the water flow rate have been used in the digital water meter, for example, reed switch, photo IR approximate sensor, ultrasonic sensor, electromagnetic sensor, etc. In this paper, a new sensing technology, where a variable capacitor and digital circuit were used for sensing the water flow rate, was proposed. The circuit was designed and verified by Pspice simulation. And a PCB board for the circuit was fabricated. After then, a prototype of digital water meter using a variable capacitor to measure the water flow rate was fabricated. The function tests of the fabricated digital water meter were performed, and it was found that the meter worked properly. Since the new technology has much better properties in terms of cost and power consumption compared to conventional technologies, it should be one of the major digital water meter technologies in the future.

전기자동차 충전기용 보급형 전력량계에 적용 가능한 고조파 왜곡 추정 알고리즘 (Harmonic distortion estimation applicable to a low-end electricity meter for an electric vehicle charger)

  • 김욱현;김경은;박상욱;김영래;전주영
    • 전기전자학회논문지
    • /
    • 제26권4호
    • /
    • pp.710-713
    • /
    • 2022
  • 본 논문에서는 전기자동차 충전시 발생하는 고조파 성분을 매우 높은 차수까지 추정하여 전력량을 계산하되 낮은 연산능력을 가지는 저가의 보급형 전력량계에서도 구동 가능하도록 Goertzel 기반 알고리즘을 제안하였다. 제안된 알고리즘을 사용하여 전력량 계량시 큰 차수의 고조파까지 충분히 고려할 수 있음을 간단한 예제 신호에 대해 시뮬레이션을 통해 검증하였다.

Programmable IC를 이용한 다기능 전자식 삼상 전력량계 기능 구현 (Implementation of Three-Phase SAMRT Meter using Programmable IC)

  • 박종범;안용홍;김홍;김정수
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 하계학술대회 논문집 D
    • /
    • pp.2039-2041
    • /
    • 2001
  • According to the deregulation of governments in the world, the power industries of United State and European nations are proceeding remote meter reading and remote load control. But the core technology of multifunctional electronic meter implemented by programmable one-chip IC, which can be the right answer of ail the power industy's efforts is now still under development in the advanced countries. Implementation of smallest size, lowest price three-phase meter with features which enable distribution automation such as bidirectional communication. The three phase metering IC and meter can be used as metering, automatic meter reading and transformer monitoring. Prepayment billing system.

  • PDF

배전원격관리를 위한 차세대 디지털 적산전력계 개발 (Development of ADWHM(Advanced Digital Watt-Hour Meter) for Remote Management of Distribution Systems)

  • 고윤석;윤상문;서성진;강태규
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제53권6호
    • /
    • pp.316-323
    • /
    • 2004
  • This paper develops an ADWHM(Advanced Digital Watt-Hour Meter) which integrates and implements the voltage management data record function and the load management data record function in the electronic watt-hour meter. ADWHM is developed based on PIC16F874 which is 8bit micro-controller of RISK type for the easy of programing and maintenance, and electronic power signal processing module is located at front of it to reduce the computing load of processor. Also, a 16kbyte EEPROM is used to record the voltage management data and load management data for a week as well as watt-hour data and USART communication mode is used to transfer data from ADWHM to PC. The accuracy of the voltage and unt measuring for ADWHM is verified by identifying the LCD display values of the ADWHM after the voltage signals of id levels from digital function generator is applied to PT(Potential Transformer) and CT(Current Transformer) output under state which it is separated from real power line. On the its basic functions such as watt-hour data recording function, voltage management data recording function and load management data recording function was verified by showing data for three days among the collected data to PC by RS232C communication from ADWHM which was connected to real power lines for a week.