• 제목/요약/키워드: Electricity Substation

검색결과 39건 처리시간 0.041초

직류 급전시스템 성능검증을 위한 시험방안 분석 (An analysis of tests process for verification of DC Traction system performance)

  • 정호성;한문섭;장동욱;이기원
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.499-504
    • /
    • 2008
  • DC substation of urban transit supplies a suitable DC power on electricity vehicles by being supplied from KEPCO. DC substation is verified electrical safety of system through pre-operation inspection on electrical installations to be supplied power from KEPCO. However, because test items and method for DC traction system are unprepared on pre-operation inspection, the general safety and performance verification of DC traction system are very insufficient. Therefore this paper analyze the overseas test examples such as factory equipment tests, factory combined tests and railway tests for the safety and performance verification of DC traction system and present a suitable test items and test standard in domestic.

  • PDF

Electrical Technologies for Grid Integration of Ocean Wave Power into the UK National Grid

  • Ahmed, Tarek
    • Journal of Power Electronics
    • /
    • 제10권3호
    • /
    • pp.320-327
    • /
    • 2010
  • In this paper, multiple offshore wave energy converters with different output characteristics are connected to one power distribution substation. The connection between the power take-off of the different wave energy converters and the electrical power transmission system is presented in order to investigate whether multiple wave energy converters can augment energy yield and improve network integration capabilities. Moreover, the model of an array of wave energy converters is developed with the goal of analyzing the effects of the offshore wave farm on the electrical network to which it is connected. It is also developed to ensure that the electricity generated by the array is sufficiently controllable, and of a quality that can be integrate into the electricity supply network without unduly increasing the cost of connection, production or delivery.

Installation of Induced Current Measurement Systems in Substations and Analysis of GIC Data during Geomagnetic Storms

  • Choi, Kyu-Cheol;Park, Mi-Young;Ryu, Youngsoo;Hong, Youngsu;Yi, Jong-Hyuk;Park, Sung-Won;Kim, Jae-Hun
    • Journal of Astronomy and Space Sciences
    • /
    • 제32권4호
    • /
    • pp.427-434
    • /
    • 2015
  • Coronal Mass Ejections (CME), which originate from active regions of the Sun's surface, e.g., sunspots, result in geomagnetic storms on Earth. The variation of the Earth's geomagnetic field during such storms induces surface currents that could cause breakdowns in electricity power grids. Hence, it is essential to both monitor Geomagnetically Induced Currents (GICs) in real time and analyze previous GIC data. In 2012, in order to monitor the variation of GICs, the Korean Space Weather Center (KSWC) installed an induced current measurement system at SINGAPYEONG Substation, which is equipped with 765 kV extra-high-voltage transformers. Furthermore, in 2014, two induced current measurement systems were installed on the 345 kV high-voltage transformers at the MIGEUM and SINPOCHEON substations. This paper reports the installation process of the induced current measurement systems at these three substations. Furthermore, it presents the results of both an analysis performed using GIC data measured at the SINGAPYEONG Substation during periods of geomagnetic storms from July 2013 through April 2015 and the comparison between the obtained GIC data and magnetic field variation (dH/dt) data measured at the Icheon geomagnetic observatory.

고속철도 변전소 피크부하 저감용 ESS 일간 운전 프로그램 개발 (Development of Daily Operation Program of Battery Energy Storage System for Peak Shaving of High-Speed Railway Substations)

  • 변길성;김종율;김슬기;조경희;이병곤
    • 전기학회논문지
    • /
    • 제65권3호
    • /
    • pp.404-410
    • /
    • 2016
  • This paper proposed a program of an energy storage system(ESS) for peak shaving of high-speed railway substations The peak shaving saves cost of equipment and demand cost of the substation. To reduce the peak load, it is very important to know when the peak load appears. The past data based load profile forecasting method is easy and applicable to customers which have relatively fixed load profiles. And an optimal scheduling method of the ESS is helpful in reducing the electricity tariff and shaving the peak load efficiently. Based on these techniques, MS. NET based peak shaving program is developed. In case study, a specific daily load profile of the local substation was applied and simulated to verify performance of the proposed program.

고속철도 변전소 피크부하 저감용 ESS 용량 산정 및 경제성 분석 (Sizing and Economic Analysis of Battery Energy Storage System for Peak Shaving of High-Speed Railway Substations)

  • 김슬기;김종율;조경희;변길성
    • 전기학회논문지
    • /
    • 제63권1호
    • /
    • pp.27-34
    • /
    • 2014
  • The paper proposed a sizing method of an energy storage system(ESS) for peak shaving of high-speed railway substations based on load profile patterns of substations. A lithium based battery ESS was selected since it can produce high-power at high speed that peak shaving requires, and also takes up a relatively smaller space for installation. Adequate size of the ESS, minimum capacity which can technically meet a peak shaving target, was determined by collectively considering load patterns of a target substation, characteristics of the ESS to be installed, and optimal scheduling of the ESS. In case study, a local substation was considered to demonstrate the proposed sizing method. Also economic analysis with the determined size of ESS was performed to calculate electricity cost savings of the peak shaving ESS, and to offer pay-back period and return on investment.

철도차량 운행 및 선로조건에 따른 교류 급전시스템의 안정성 연구 (A study on stability of feeder system considering driving of railway vehicle and rail conditions)

  • 김재문;김양수;이종성
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2011년도 제42회 하계학술대회
    • /
    • pp.2213-2214
    • /
    • 2011
  • It is important to consider power stability in case of design and construction of a substation at railroad because a train is operated by electricity and tains are drived simultaneous at the same section. This paper described stability of feeder system considering driving conditions and railroad conditions of train which is drived. Simulation tool, TOM(Train Operations Model) software is used to ensure stability of feeder system. As results of simulation, feeder voltage source is in limits on driving operation dia of trains.

  • PDF

공기압을 이용한 패드 변압기 침수방지용 장치 개발에 관한 연구 (The Development of Flood Protection System for Pad Transformer using Pneumatic Pressure)

  • 김기현;이상익;배석명;정찬웅;이재용
    • 전기학회논문지P
    • /
    • 제58권1호
    • /
    • pp.90-94
    • /
    • 2009
  • The inundation of substation and ground power equipment breaks out every summer season in low-lying downtown and low-lying shore by localized heavy rain, typhoon and tidal wave. For diminishing flood damage of electrical equipment in the root, flood protection system which is used the basic frame of Pad transformer is developed using pneumatic pressure. This system is established on pressure generator equipment and sensor of flooded level operates at flooding occurrence and is maintained a shutting tightly structure. The system is able to protect indraft water in Pad Transformer and supply the electricity at emergency(flooding). And we tested safety for insulation resistance at flooding and applying an electrical current. We estimate that loss cost which is caused by with flooding and the power failure will be diminished if it is addition to advances the reliability evaluation by setting an example.

ABC 배전 접속 시스템에 대한 연구 (The Research into Connecting System for Aerial Bundled Cable in Distribution Line)

  • 이용순;최경선;주종민;이철호
    • 한국전기전자재료학회:학술대회논문집
    • /
    • 한국전기전자재료학회 2001년도 하계학술대회 논문집
    • /
    • pp.495-498
    • /
    • 2001
  • The distribution line through which electricity is supplied from substation to customer generally varies by underground line and overhead line. In contrast that the underground line is shielded, the overhead lines do not have the shield layer. To overcome this weak point of the overhead lines, the aerial bundled cable(ABC) connection systems have been developed. The basic concept of the ABC connection system is the application of the underground cable system containing complete shield layer to the overhead cable system. The ABC system is the innovative technologies which enable the prevention of electric shocks, reduction of the maintenance charge and damage of the cable. This paper give a full detail of vertical connection system applied within a country.

  • PDF

전력계통의 고장 및 보호계전기 동작에 대한 분석 (The Analysis of Fault and Relay Operation in System of Power Network)

  • 김호표;한상섭;박응주
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 춘계학술대회 논문집 전력기술부문
    • /
    • pp.27-29
    • /
    • 2001
  • As the amount of electric power consumption is increasing rapidly, the power systems are complex and growing larger. It is required that the quality of electricity is better. To satisfy this demands It is required to analyze the data of the fault accurately and then to find a cause and to enforce a countermeasure. We analyzed the fault of transmission & substation installation over 66kV statistically to operate the power system well. We introduced the faults that are classified into the cause, the facilities, the voltage. This paper explains the experience of the fault in electric power coporation that is operating the large power system. This paper will be meaningful. because this paper gives the data of real power system. We wish that the reliability of power suppliment will be improved, as using this paper properly and this paper is helpful to the growth of this field and the development of technology.

  • PDF

배전용 변압기 단락강도 시험설비 개발 (Development of Short-circuit Testing Facility for Distribution Transformers)

  • 박지훈;민윤홍;강영학;유호근;안규선;함길호;오창주
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 춘계학술대회 논문집 전기기기 및 에너지변환시스템부문
    • /
    • pp.64-67
    • /
    • 2002
  • To increase the short-circuit testing capacity of distribution transformers, testing facility has been installed for KEPCO in Vi-wang. The power supply of testing facility is directly supplied from the network substation located closely. Testing can be performed up to 300 kVA for single-phase transformers, 500 kVA for three-phase transformers. Operating with this facility, the distribution company is able to maintain the reliable supply of electricity. Also the critical quality of transformers from manufacturers can be verified by short-circuit testing. This paper describes the design concept and specification of newly developed equipment and the procedure of short-circuit test.

  • PDF