Power System Sensitivity Analysis for Probabilistic Small Signal Stability Assessment in a Deregulated Environment

  • Dong Zhao Yang;Pang Chee Khiang;Zhang Pei
    • International Journal of Control, Automation, and Systems
    • /
    • v.3 no.spc2
    • /
    • pp.355-362
    • /
    • 2005
  • Deregulations and market practices in power industry have brought great challenges to the system planning area. In particular, they introduce a variety of uncertainties to system planning. New techniques are required to cope with such uncertainties. As a promising approach, probabilistic methods are attracting more and more attentions by system planners. In small signal stability analysis, generation control parameters play an important role in determining the stability margin. The objective of this paper is to investigate power system state matrix sensitivity characteristics with respect to system parameter uncertainties with analytical and numerical approaches and to identify those parameters have great impact on system eigenvalues, therefore, the system stability properties. Those identified parameter variations need to be investigated with priority. The results can be used to help Regional Transmission Organizations (RTOs) and Independent System Operators (ISOs) perform planning studies under the open access environment.

A Study on Evaluation Criteria for Infrastructure Importance regarding Earthquake (공공시설물 지진대응을 위한 중요도 평가기준에 관한 연구)

  • Park, Jae-woo;Kim, Seok
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.21 no.6
    • /
    • pp.317-327
    • /
    • 2018
  • The perception of earthquake in Korea has changed due to the earthquake that occurred in Gyeongju and Pohang, and the earthquake has become an important factor in infrastructure management. Damage to infrastructures in the event of an earthquake is extensive. In particular, damage to infrastructures that perform public function used to spread to the whole area. From the point of view of earthquake disaster prevention, it is very important for the public to define what infrastructures are important management targets and to prepare a countermeasure. In this study, we propose a method to evaluate the importance of infrastructure to effectively manage infrastructures for earthquakes. For this purpose, important factors for the railway bridges, power generation and electric power facilities, and apartment complexes are suggested. AHP analysis is conducted to suggest priorities. In addition, the evaluation criteria for infrastructure importance are presented.

An Economic Feasibility Study of Wind-Diesel Hybrid Power Systems for an Island in the Yellow Sea (서해 도서지역의 풍력-디젤 하이브리드 발전에 대한 경제성 분석)

  • Lee, Tak-Kee;Nam, Yong-Yun;Kim, Jae-Dong;Han, Jeong-Woo
    • Journal of Navigation and Port Research
    • /
    • v.35 no.5
    • /
    • pp.381-385
    • /
    • 2011
  • In this paper, an economic feasibility study of wind-diesel hybrid power systems for an island in the Yellow Sea, where the maximum power generation is about 500kW, was performed. For the study, annual electric load variation and wind resource data of the island were collected and analyzed. HOMER program - a typical hybrid optimization model for electric renewables including wind resource, developed by the National Renewable Energy Laboratory - was used. Wind speed and diesel price were picked out as variables for the sensitivity analysis in order to find the economic accountability for the wind-diesel hybrid power system. As the result, even though it is not feasible economically under the present condition, if mean wind speed is over 3 m/sec. or diesel price goes up to 2.4 $ per liter, the wind-diesel hybrid power system for the island becomes a prospective candidate.

Proton Generation with 3-% Energy Conversion Efficiency (3% 에너지 변환효율을 가진 양성자 발생)

  • Choe, Il-U;Kim, Cheol-Min;Jeong, Tae-Mun;Yu, Tae-Jun;Seong, Jae-Hui;Lee, Seong-Gu;Hafz, N.;Bae, Gi-Hong;No, Yeong-Cheol;Go, Do-Gyeong;Lee, Jong-Min;Nishiuchi, M.;Daido, H.;Yogo, A.;Orimo, S.;Ogura, K.;Ma, J.;Sagisaka, A.;Mori, M.;Pirozhkov, A.S.;Kiriyama, H.;Bulanov, S.V.;Esirkepov, T.Zh.;Oishi, Y.;Nemoto, K.;Nagatomo, H.;Nagai, K.
    • Proceedings of the Optical Society of Korea Conference
    • /
    • 2008.07a
    • /
    • pp.155-156
    • /
    • 2008
  • PDF

High-Energy Proton Generation with High Energy Conversion Efficiency Driven by Ultrashort High-Intensity Ti:Sapphire Laser (극초단 고출력 티타늄 사파이어 레이저에 의한 높은 에너지 변환효율을 가지는 고에너지 양성자 발생)

  • Choe, Il-U;Yu, Tae-Jun;Seong, Jae-Hui;Kim, Hyeong-Taek;Jeong, Tae-Mun;Hong, Gyeong-Han;Kim, Jeong-Hun;No, Yeong-Cheol;Go, Do-Gyeong;Lee, Jong-Min;Sagisaka, Akito;Yogo, Akifumi;Orimo, Satoshi;Ogura, Koichi;Li, Zhong;Pirozhkov, Alexander;Daido, Hiroyuki;Oishi, Yuji;Nemoto, Koshichi;Nakamura, Shyu;Noda, Akira;Iwashita, Yoshihisa;Shirai, Toshiyuki
    • Proceedings of the Optical Society of Korea Conference
    • /
    • 2006.07a
    • /
    • pp.379-380
    • /
    • 2006
  • PDF

Research for the survey of method to serviced customer Interruption cost evaluation (전력수용가 정전비용 산출물 위한 설문조사 방법론에 관한 연구)

  • Park, Soo-Man;Kim, Jae-Chul;Moon, Jong-Fil;Bae, Ju-Chun
    • Proceedings of the KIEE Conference
    • /
    • 2002.11b
    • /
    • pp.259-261
    • /
    • 2002
  • KEPCO(Korea Electric Power Corporation) has been management alone before some time. However through the electrical industry reorganization generation and KPX(Korea Power Exchange) were separated on 2001. A marketing and distribution part will be separated in the future. While many problem for appear in future. how to management for power system network is important. unfortunallity, electrical power industry is starting point right now. Thus, detail data is incomplete for this field and detail research for this field is required with distribution reorganazation. In this paper suggest for customer interruption cost compute method to establish a standard. The standard is need to security operation of power system network. The customer interruption cost compute method necessity of customer interruption cost compute method is minimizing process for total cost. As final total cost compute through the interruption cost compute, we can recognize investment point exactly. We cited foreign survey questions, because exactly matched survey questions for in the country circumstance is not exist. And process to survey performance suggest after modify for match in the country circumstance. Survey questions that suggested fer this paper are classified five categories. This paper suggests to detail survey questions and survey method before survey and suggest to how to customer interruption compute when survey data is ensured. Moreover this paper suggest to average interruption cost compute for residential customer using statistical method.

  • PDF

Increasing Hosting Capacity in KEPCO Distribution Feeders (배전선로의 분산 전원 상시 연계용량 기준 상향 타당성 연구)

  • Cho, Sung-Soo;Sim, JunBo;Lim, Hyeon-Ok;Kim, HyeonJin;Kim, Seong-Man;Ju, Sang-Do;Song, JongHyup
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.5 no.4
    • /
    • pp.311-321
    • /
    • 2019
  • With Korean Government's Renewable energy 3020 plan and 8th Basic plan for long-term power supply, renewable energy industries in Korea are active and catching attention from many relevant industry's relations. Especially with Interconnection guarantee policy established in Oct, 2016, DERs interconnection delay due to lack of allowable distribution hosting capacity is happening and reduction of reinforcement cost for distribution system where 70 % of DERs in South Korea are installed became one of important issues of KEPCO. Therefore, KEPCO needed to extract reasonable solutions to increase feasible hosting capacity of distribution feeders in order to reduce reinforcement cost under the condition of no matter in distribution system operation. This paper proposes feasible hosting capacity of distribution feeders that can be adopted and the status of DER installation in distribution system, PV output data, minimum load in distribution feeders as well as capacity of distribution lines have been investigated and analyzed in proof of the proposal.

100 kW급 용융탄산염 연료전지 발전시스템 개발

  • Im, Hui-Cheon;Kim, Do-Hyeong;Seo, Hye-Gyeong;Park, Seong-Yeon;An, Gyo-Sang
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2005.11a
    • /
    • pp.140-148
    • /
    • 2005
  • The molten carbonate fuel cell (MCFC) is endowed with the high potential especially in future electric power generation industry by its own outstanding characteristics. KEPCO (KEPRI) started a 100 kW MCFC system development program in 1993 and has been executed 100kW system develpilot plant successfully completed first phaseopment by 2005 on the basis of successful results of 25kW system development. In this program, the components and mechanical structure for 100 kW stack and system construction were completed on last year and now system pre - commissioning was being executed. A 100 kW MCFC power plant was constructed at the site of Boryeong Thermal Power Plant. A 100 kW MCFC system has characterized as a high pressure operation mode, CO2 recycle, and externally reforming power generation system. The 100 kW MCFC system consisted with stacks which was made by two 50 kW sub-stacks, 90 cells with 6,000 cm2 active area and BOP including a reformer, a recycle blower, a catalytic burner, an inverter, and etc. The system has been operated from 13th of September on this year and produced 50 kW AC under atmospheric pressure condition and expected to operate by the end of this year.

  • PDF

Development & Application of Generator Control System Models of EUROSTAG for Stability Study of Power Systems (전력계통의 안정도 해석용 발전기제어계의 EUROSTAG 모형 개발 및 적용)

  • 김학만;오태규
    • Journal of Energy Engineering
    • /
    • v.12 no.2
    • /
    • pp.109-117
    • /
    • 2003
  • Because of the difficulty of acquiring new generation sites and right-of-way, additional units have been added to the existing generation sites and the transmission system has been developed into highly meshed configuration. This structural characteristics may cause restriction on the reliable operation of power systems. In other to meet with this problem, the enhancement of system analysis techniques and establishment of appropriate measures have been required in this situation. In addition the deregulation of electric power industry in Korea would require better tools for power system analysis and control. In this paper, exciter system models, speed governor system models and PSS models of EUROSTAG for stability study are developed. Comparison with simulation results of PSS/E is performed for verification of EUROSTAG models.

An Analysis of Location Marginal Prices Considering Demand Response Resources (수요반응자원을 고려한 지역별 한계가격 해석기법 연구)

  • Kim, Hyun-Houng;Kim, Jin-Ho;Kim, Hyeong-Jung;Shin, Joong-Rin;Park, Jong-Bae
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.1
    • /
    • pp.25-33
    • /
    • 2008
  • This paper presents a new approach of a evaluation of location marginal prices(LMPs) considering demand response resources in the competitive electricity market. The stabilization of the electric power supply and demand balance has been one of the major important activities in electric power industry. Recently, much attention is paid to the demand-side resources which are responsive to incentives or time-varying prices and existing power system planning and operation activities are incorporated with the so-called demand response resources. In this paper, we first present an analytical method for calculation of LMPs considering demand response resources and then break down the LMPs into three components. In this study, we assume that Korean power system consists of two major regions, one which is the metropolitan and the other is non-metropolitan region. In the case study, we have considered several LMPs cases with different use of locational demand response resource and we can obtain a locational signal to demand response resources. Also, the economics of demand response resources are evaluated, compared with the increase of transmission line capacity and of generation capacity.